Schedule Metric (Midterm)

We use Overtime % for Schedule Metric. We calculate our Overtime % according to the below method. First, we subtract actual time from planned time, divide the result by plan time and then multiply it with 100%. Actual time is the time duration we took to finish the functions within an iteration ,and planned time is the time duration we had planned to finish the functions within an iteration.

Overtime %

Overtime Percentage

Graph

Schedule Metric

Bug Metric (Midterm)

Bug Level Calculation

We are using bug value for Bug Metric. We calculate the bug metric in the following way. First we define the Bug Severity Level. Severity 1 is the bug that does not affect the function. Severity 2 is bug that affects the function and Severity 3 is bug that affects its own function and other functions. After getting the severity of the bug, we multiply it with the number of bugs of the same severity and sum the result for each iteration.
Bug Severity

Graph
Bug Metric

Schedule Metric (Final)

Overtime %
Overtime percentage

Graph
Schedule Metric

Bug Metric (Final)

Bug Level Calculation
Bug Severity

Graph
Bug Metric

Action Plans

Schedule Metric Action Plan
Action Plan

Bug Metric Action Plan
Action Plan