Project Schedule

From IS480
Jump to navigation Jump to search

Deliverables

Date Project Milestone Deliverables
13 November 2009 First meeting with sponsor -
24 November 2009 Droid Adventure draft project proposal to sponsor Present Droid Adventure draft project proposal to sponsor
4 December 2009 Droid Adventure project proposal draft due / self learning on android platform & flash. Droid Adventure project proposal draft
4 January 2010 Project proposal due Project proposal
2 February 2010 Stage 1 completion (Iteration 1) Feature in the stage 1 include the following:
  • Uploading the contact profile to a cloud.
  • Main game user interface
  • Stage 1 user interface
12 February 2010 Stage 2a completion (Iteration 2) Feature in the stage 2a include the following:
  • 2D Barcode Function
  • Barcode Scanner
15 February 2010 Midterm reflection due Midterm reflection
9 March 2010 Stage 2b completion (Iteration 3) Feature in the stage 2b include the following:
  • Encryption & Decryption of text message for stage 3 location
  • Stage 2 user interface
15 March 2010 Stage 3 completion (Iteration 4) Feature in the stage 3 include the following:
  • Access accelerometer in android
  • Stage 3 user interface
22 March 2010 Project Poster due Project Poster
1 April 2010 Integration of all stages (Iteration 5) Integrating all stages
6 April 2010 Droid Adventure project completion Handing over Droid Adventure project to sponsor
9 April 2010 Project final reflection Final reflection