Line 14: Line 14:
 
{|style="background-color:#ffffff; color:#000000" width="100%" cellspacing="0" cellpadding="7" valign="top" border="0"|
 
{|style="background-color:#ffffff; color:#000000" width="100%" cellspacing="0" cellpadding="7" valign="top" border="0"|
 
|style="font-size:100%; border-left:1px solid #ffffff; border-right:1px solid #ffffff; text-align:center; background-color:#151C55; " width="10%" |[[Network_Analysis_of_Interlocking_Directorates/Project_Management|<font color="#ffffff"><b>Project Plan</b></font>]]  
 
|style="font-size:100%; border-left:1px solid #ffffff; border-right:1px solid #ffffff; text-align:center; background-color:#151C55; " width="10%" |[[Network_Analysis_of_Interlocking_Directorates/Project_Management|<font color="#ffffff"><b>Project Plan</b></font>]]  
|style="font-size:100%; border-left:1px solid #ffffff; border-right:1px solid #ffffff; text-align:center; background-color:#151C55; " width="10%" |[[Network_Analysis_of_Interlocking_Directorates/Project_Management/Metrics|<font color="#ffffff"><b>Metrics</b></font>]]
 
 
|style="font-size:100%; border-left:1px solid #ffffff; border-right:1px solid #ffffff; text-align:center; background-color:#8A740C; " width="10%" |[[Network_Analysis_of_Interlocking_Directorates/Project_Management/Risk_Assessment|<font color="#ffffff"><b>Risk Assessment</b></font>]]  
 
|style="font-size:100%; border-left:1px solid #ffffff; border-right:1px solid #ffffff; text-align:center; background-color:#8A740C; " width="10%" |[[Network_Analysis_of_Interlocking_Directorates/Project_Management/Risk_Assessment|<font color="#ffffff"><b>Risk Assessment</b></font>]]  
 
|} <br/>
 
|} <br/>

Latest revision as of 22:23, 23 January 2015

Home Project Overview Findings & Insights Project Management Project Documentation Learning Outcomes


Project Plan Risk Assessment


Risk Assessment Table

S/N Risk Statement Type of risk Likelihood (H/M/L) Impact (H/M/L) Risk Rating Mitigation Strategy
1 Lack of knowledge regarding corporate structure Non-Technical Medium Medium Moderate
  • Refer to research papers for previous research hypothesis & results.
  • Regular consultation to clarify if there is any doubt.
2 Limitation on Data Extraction Technical Medium Medium Moderate
  • Test different ways of doing it, and develop an iterative method to acquire data.
3 Team is unfaimiliar with R-programming Technical Medium High High
  • More research and learning should be done and shared within the team.
  • If necessary, re-confirm the priority and revise project plan to get more time learning before applying the technology.
4 The network data may not be completed Technical High High High
  • Gather suitable data with appropriate size.
  • Iterative methodology of gathering data stages.
  • Use different algorithm and decide the most appropriate method to acquire data and organise accordingly.
4 Schedule. Team members are busy with school work. Non-Technical Medium Medium Moderate
  • Plan ahead and make sure that all team members are comfortable with the work load and free to meet on the dates scheduled.