SMT Project Experience Options
|
Type I - Application Project |
Type II - Smart City Analytical / Urban Planning Practicum Project |
Type III - Research Project
|
Team Size |
4-6 |
2-3 |
1 (GPA > 3.4)
|
Objective and Scope |
To design and implement a smart city application that incorporates combination of technology enablers and a solution addressing an urbanization and/or societal challenge. |
To conduct an evidence-based analysis of smart city blueprint (locally or overseas) or analytical models addressing an urbanization and/or societal challenge. |
To conduct an research based on an identified problem related to addressing a smart city challenge. The scope may include new algorithm / approach, simulation and analysis of an urbanization or societal challenge.
|
Recommended Skill-sets / Pre-requisites
|
- You should have passed SMT110/IS110 Introduction to Programming, SMT203 Smart City Systems and Management, IS112 Data Management
- Other highly recommended courses: Interaction Design & Prototyping, Web Application Development I & II, Internet of Things
|
- Empirical Studies, Research Methods, Analytics Foundation, Geographic Information Systems, Sustainable (Digital) Cities, Introduction to Public Policy.
|
- Empirical Studies, Research Methods, domain-specific (e.g., healthcare, logistics) or project-specific technical skills (e.g., data mining, text mining).
- Skills requirement varies from project to project depends on supervisor.
|
Project Sponsor / Supervisor
|
- SIS-sourced OR
- Self-sourced external sponsor OR
- Self-sponsored (entrepreneurial) OR
- SIS Faculty supervisor or industry mentor (entrepreneurial project) supervises team
|
- SIS-sourced OR
- Self-sourced external sponsor OR
- Faculty supervisor (SIS or other school’s) supervises team
|
- SMU faculty (student to find relevant faculty from any school offering guided research project or independent study)
|
Expected Outcomes
|
- System prototype and documentation
- Presentation and report
|
- Wireframe/Proof-of-concept/analytical model/city blueprint along with evidence-based analysis
- Presentation and report, dashboard/analytical model, acceptance/review by sponsor
|
- Proposal of the research problem
- Midterm report with approaches and initial findings
- Final Presentation and research paper
|
Available Period
|
- Year 3 Term 1 onwards (Y3T2 onwards preferred)
- It can be an implementation extension of IDP, Guided Research Project, SCSM, IoT (approval by course coordinator required).
|
- Year 3 Term 1 onwards
- It can be an analytics focused project based on continuation of another project from another "approved" course e.g., SCSM, Data Mining, GIS, IOT course (approval by course coordinator required).
|
|
Project Proposal Deadline |
One week before term starts |
One week before term starts |
One week before term starts. Your supervisor must agree to the proposal and to supervise you
|
Project Proposal Template |
Download [[1]]
|
Download [[2]] |
Download [[3]]
|
Course Assessments
Assessment Item(s)
|
Weightage (%)
|
Type I - Application Project |
Type II - Smart City Analytical / Urban Planning Practicum Project |
Type III - Research Project
|
Project Proposal |
10 |
10 |
10
|
Mid-term presentation / report* |
20 |
30* |
30
|
Final Presentation |
40 |
20 |
30
|
Final Report/Paper* |
30 |
40* |
30
|
Total |
100 |
100 |
100
|
Course Assessment Details
Assessment Item |
Type I - Application Project |
Type II - Smart City Analytical / Urban Planning Practicum Project |
Type III - Research Project
|
Project Proposal
|
- Clarity of project
- Project plan and schedule
- Benefits to society
|
- Clarity of project
- Project plan and schedule
- Benefits to society
- List of references
|
- Clarity of project
- Project plan and schedule
- Benefits to society
- Description of available data
|
Mid-term
|
- Project management
- Quality of project, including demo
|
- Literature survey
- Preliminary findings
|
- Project management
- Preliminary findings
|
Final Presentation
|
- Project management
- Quality of product
- Peer evaluation
- Project documentation
|
|
- Project management
- Peer evaluation
- Data-driven / evidence-based insights
|
Report/Paper
|
- Key findings to demonstrate value to sponsor and benefits to society
- Real challenges faced, mitigation steps and lessons learnt
|
- Key findings to demonstrate value to sponsor and benefits to society
- Real challenges faced, mitigation steps and lessons learnt
|
- Key findings to demonstrate value to sponsor and benefits to society
- Real challenges faced, mitigation steps and lessons learnt
|
Lesson Plan
End of Week |
Assessment Item |
Graded by |
Feedback by
|
0 |
Project proposal |
Course Manager |
|
7 |
Mid-term presentation/report |
Supervisor |
|
14 |
Final presentation |
Supervisor, Reviewer |
Reviewer, Sponsor
|
15 |
Final report/paper |
Supervisor |
|
Resources
Main Reference
https://wiki.smu.edu.sg/1819t2smt483/Main_Page