Project Updates
1. Project created
1.1 Proposal submitted
1.2 Wiki page created
2. Updates (Week 4)
2.1 Cloud provider changed from Azure DevOps to Amazon Web Services
2.2 Sponsor changed to Victoria School
2.3 Currently in talks with National Junior College to provide more students for testing
3. Updates (Week 6)
3.1. Front-end of main page and dashboard 1st iteration done, front-end of game in progress. The site can be accessed here
3.2. Met with Victoria School last week, they have confirmed our UAT date to be on 10 Mar with an additional session to be planned in week 12/13. They were generally impressed with what we have as it aligns with their teaching objectives with regards to the concepts we are demonstrating through our game. They have suggested implementing a dashboard for teachers to track the way students play the game to see whether they understood the concepts taught in class. We are figuring out how to implement this suggestion.
3.3. Met with National JC on Tuesday, they want to see our MVP and try the game out for themselves before deciding whether to work with us. They also want a lesson flow with clear learning objectives for our UAT. We aim to give them these deliverables next week.
3.4. Taking feedback from NJC who, in contrast with VS, wanted the game to be more nuanced in terms of demonstrating urban planning concepts through the game, we have decided to make changes to game mechanics to reflect the effect of different amenities being of different importance to different demographics.
3.5. In light of the nCov situation and the increasing likelihood of schools having to move to e-learning, we are developing contingency plans on conducting UAT during students’ home-based learning. The plan includes creating feedback surveys for students to reflect on the learning points of the game, and pain points they had while using the platform. We are trying to see how the initial plan to have students physically collaborate when playing the game can be adapted into an online collaboration.
4. Updates (Week 9)
4.1 NJC dropped from project
4.2 Have confirmed River Valley High School (RV) as secondary sponsor. User test likely to be in week 13 with live class
4.3 Acquired domain name anly.io ,configured to https to cater to schools whose networks may not support http
4.4 Fixed login issues
4.5 Added landing page
4.6 Completed UI for leaderboard, improved UI for game
4.7 Completed score API endpoint for leaderboard module to call
4.8 Updated project timeline on Project Management page
5. Updates (Week 11)
5.1 Completed UAT at VS and RVHS, collected feedback survey from students and teachers
5.2 Updated UI and UX, added music and tutorial video
5.3 Moved from SQLite to PostgreSQL to support additional user load
5.4 Discussed and finalised metrics for analytics dashboard
6. Updates (Week 12)
6.1 UAT 3 with students at VS cancelled, replaced with teaching dashboard demo session with teachers to be done on Week 14 Tue
6.2 Meeting with URA officers in Week 13/14 to seek feedback and explore project extension options