<h2>Quality</h2>
 
<h2>Quality</h2>
 
<h2>Deployment</h2>
 
<h2>Deployment</h2>
 +
*Google Play Store Link: https://play.google.com/store/apps/details?id=sozoco.co.naildeck<br/>
 
*Deployed Back-End Admin Website Link: http://1-dot-naildeckadminportal-1042.appspot.com/<br/>
 
*Deployed Back-End Admin Website Link: http://1-dot-naildeckadminportal-1042.appspot.com/<br/>
*Google Play Store Link: https://play.google.com/store/apps/details?id=sozoco.co.naildeck
+
 
  
 
<h2>Testing</h2>
 
<h2>Testing</h2>

Revision as of 10:22, 22 November 2015

6nificance Logo.png

6nificance-home.png
HOME

6nificance-about-us.png
ABOUT US

6nificance-proj-overview.png
PROJECT OVERVIEW

6nificance-proj-mgmt.png
PROJECT MANAGEMENT

6nificance-docs.png
DOCUMENTATION

Main Wiki Midterm Wiki Final Wiki



Project Progress Summary

Final Presentation Slides: Download 6nificance Final Presentation Slides

Project Highlights


Project Challenges


Project Achievements

Project Management

Project Scope

Midterms Final
[[|500px|center|link=]]
6nificance Midterm Scope.PNG


Scope Changes

Project Timeline

Planned Actual
6nificanceAcceptanceSchedule.png
6nificance Midterm Project Schedule.png


Schedule Highlights

  • Removed

Project Metrics

Schedule Metrics

6nificance Midterm Schedule Metrics.PNG


Iteration Planned Duration (Days) Actual Duration (Days) Schedule Metric Score Action Taken Status
5 14 16 0.88 More time needed to complete Update Profile function due to difficulties with uploading images to cloud database.

Follow up action: Informed supervisor about delay. Re-scheduled the dates and tasks of iteration 6. Reduced duration of iteration 6 from 14 days to 12 days. More coding hours per day were allocated in iteration 6.

Completed
6 12 14 0.86 More time needed to research and complete Social Module due to complexity with creating a new social media platform from scratch.

Follow up action: Informed supervisor about delay. Re-scheduled the dates and tasks of iteration 7. Removed 2 buffer days in iteration 8.

Completed
7 14 16 0.88 More time needed to debug bugs found in newsfeed and view color hashtag of social module

Follow up action: Informed supervisor about delay. Reduced duration of iteration 8 from 9 days to 7 days.

Completed

View Our Schedule Metrics Here!

Bug Metrics

6nificance Midterm Bug Metrics.PNG


Iteration Bug Score Bug Summary Action Taken
5 17
2 Low
3 High
3 high bugs were due to profile picture not being shown due to problems with uploading images to Cloud Database. Resolve bugs immediately. End date of iteration 5 is delayed. PM to reschedule end dates and tasks of iteration 6.
6 21
1 Low
2 High
1 Critical
1 critical bug was due to app cash when newsfeed refresh is attempted without internet connection. 2 high bugs were due to number of likes and color hashtags not being accurately recorded in database. Resolve bugs immediately. End date of iteration 6 is delayed. PM to reschedule end dates and tasks of iteration 7.
7 29
4 Low
5 High
5 high bugs were due to wrong user profile picture being displayed in the newsfeed, incorrect number of posts sometimes being displayed on user profile and incorrect color tags shown in each post. Resolve bugs immediately. End date of iteration 7 is delayed. PM to reschedule end dates and tasks of iteration 8.

View Our Bug Metrics Here!

Project Risks

Risk Description Category Impact Mitigation Strategy
Digital color in application may not match the physical color of nail polish. High Users may end up dissatisfied and no longer use the application. Before ordering, a message will be displayed in the application. It will state that a money-back guarantee is provided if users do not think their nail polish color match with their requested color.
Team is unfamiliar with android development. High Project may be potentially delayed due to time spent on learning. Initial quality of application may be affected as there may be more bugs. PM has allocated more time to Iteration zero to learn about android development.
Sponsor not confident of delivering within project timeline. High Users may not be encouraged to use the application since their desired nail polish may not be ready. Team proposed that social module be the first item that users see to encourage them to actively use the application which sponsor agreed and accepted.

Technical Complexity

6nificance Technical Complexity.png



Quality of Product

Intermediate Deliverables

Stage Specification Modules
Project Requirements Market Research Market Research
Project Management Minutes Minutes
Metrics Schedule Metrics
Task Metrics
Bug Metrics
Risk Risks
Change Management Change Management
Analysis Use Case Diagram
System Sequence Diagram
Architecture Diagram
Diagrams
Design Low-Fi Prototype
High-Fi Prototype
UI Prototype
Testing User Testing 1 User Testing 1
Heuristic Evaluation Heuristic Evaluation
User Testing 2 User Testing 2

Quality

Deployment


Testing

User Testing Date Venue Users Link
User Testing 1 08 Aug 2015 Based on testers' convenience 14 Female (Age 14-24 years old)
2 Male (Age 14-24 years old)
User Testing 1
Heuristic Evaluation 12 Sept 2015 SMU 4 SMU female students Heuristic Evaluation
User Testing 2 02 Oct 2015 SMU 21 Females User Testing 2


Reflection

Team Reflection

  1. Deeper insights into the world of colors
  2. Gained real-life experience of building a social media platform from scratch
  3. Experience in mobile application development and Google Services


Individual Reflection

Name Reflections
6nificanceSanjay.png

Sanjay Nelagadde

6nificanceKiatkeng.png

Ng Kiat Keng

6nificanceTingZhi.png

Lim Ting Zhi

6nificancefengru.png

Chua Feng Ru

6nificanceYeeCheng.png

Foo Yee Cheng

6nificancebendexter.png

Lim Yu Xiang Bendexter