Difference between revisions of "IS480 Team wiki: 2015T6 6nificance Final Wiki"
Jump to navigation
Jump to search
Line 175: | Line 175: | ||
<h2>Technical Complexity</h2> | <h2>Technical Complexity</h2> | ||
[[Image:6nificance_Technical_Complexity_Final.png|1000px|center|link=]]<br> | [[Image:6nificance_Technical_Complexity_Final.png|1000px|center|link=]]<br> | ||
− | |||
=<div style="background: #34454c; padding: 15px; font-weight: bold; line-height: 0.3em; text-indent: 15px; font-size: 22px"><font color=#FFFFF>Quality of Product</font></div>= | =<div style="background: #34454c; padding: 15px; font-weight: bold; line-height: 0.3em; text-indent: 15px; font-size: 22px"><font color=#FFFFF>Quality of Product</font></div>= |
Revision as of 23:41, 22 November 2015
Main Wiki | Midterm Wiki | Final Wiki |
Project Progress Summary
Final Presentation Slides: Download 6nificance Final Presentation Slides
Pitch Video
Poster
Project Highlights
- Successful Deployment in Google Play Store on 13th November. Link: https://play.google.com/store/apps/details?id=sozoco.co.naildeck
- Successful Deployment of Back-End Admin Website on Google App Engine. Link: http://1-dot-naildeckadminportal-1042.appspot.com/
- 3 User Testings and 1 heuristic evaluation conducted. User Testing #3 conducted in NUS.
- Team decided to revamp the whole UI of application to make it look more social media centric. These changes were done in iterations 6 and 7:
- Removal of navigation drawer and interlinked rest of application features with social module.
- Created new high-fi prototypes and conducted heuristic evaluation before actual coding for revamp.
- Team proposed and formed partnerships with nail salons to generate more nail art posts which sponsor agreed and accepted.
Project Challenges
- DIY nail polish kit is removed as project sponsor highlighted issues with finding suppliers for the DIY kit.
- Project sponsor not confident of producing nail polishes within project timeline due to difficulties with sourcing good quality materials.
- Users will instead express interest in the color of nail polish and receive it once sponsor is ready to deliver.
- Team proposed that application be more social media focused in order to encourage active usage and interests which sponsor agreed and accepted.
Project Achievements
- Active posting of nail art pictures by our nail salon partners in Singapore.
- Targeted local and international nail art communities. Received downloads from Singapore and other countries.
Project Management
Project Scope
Midterms | Final |
---|---|
Scope Changes
- Additional functions in website to view newsfeed and delete post dropped due to more time needed on optimization task for loading speed of images in mobile application
- Content of social media task dropped due to more time needed on optimization task for color sorting of images in mobile application
- Delete post added in mobile application to allow users to delete their undesired posts
Project Timeline
Planned | Actual |
---|---|
Schedule Highlights
- Optimization tasks for loading of images and search posts based on color added in iteration 9
- Additional functions for back-end admin website to view newsfeed and delete posts removed from iterations 9 and 10
- Delete post in mobile application added in iteration 10
- Alternate view to allow users to see posts in screen view mode dded in iteration 10
- User Testing #3 rescheduled from 2nd Nov to 9th Nov
Project Metrics
Schedule Metrics
Iteration | Planned Duration (Days) | Actual Duration (Days) | Schedule Metric Score | Action Taken | Status |
---|---|---|---|---|---|
9 | 17 | 19 | 0.89 | More time needed to optimize loading speed of images and sorting color algorithm Follow up action: Informed supervisor about delay. Reduced duration of iteration 10 from 14 days to 12 days |
Completed |
10 | 12 | 13 | 0.92 | Estimates are generally accurate and on track. Proceed as per normal. |
Completed |
11 | 14 | 14 | 1.00 | Estimates are generally accurate and on track. Proceed as per normal. |
Completed |
View Our Schedule Metrics Here!
Bug Metrics
Iteration | Bug Score | Bug Summary | Action Taken |
---|---|---|---|
9 | 15 3 High |
3 high bugs due to posts not being sorted properly, profile picture not being shown and blank page being shown when users' profile are shown. | Used the planned debugging time in iteration 9. Team was able to fix the identified bugs within the planned debugging time. |
10 | 17 2 Low 3 High |
3 high bugs were due to trends not showing the correct number of posts and saved colors | Used the planned debugging time in iteration 10. Team was able to fix the identified bugs within the planned debugging time. |
11 | 15 1 High 1 Critical |
Loading of incorrect images in newsfeed of social module | Used the planned debugging time in iteration 11. Team was able to fix the identified bugs within the planned debugging time. |
Project Risks
Risk Description | Category | Impact | Mitigation Strategy |
---|---|---|---|
Digital color in application may not match the physical color of nail polish. | High | Users may end up dissatisfied and no longer use the application. | Before ordering, a message will be displayed in the application. It will state that a money-back guarantee is provided if users do not think their nail polish color match with their requested color. |
Team is unfamiliar with android development. | High | Project may be potentially delayed due to time spent on learning. Initial quality of application may be affected as there may be more bugs. | PM has allocated more time to Iteration zero to learn about android development. |
Sponsor not confident of delivering within project timeline. | High | Users may not be encouraged to use the application since their desired nail polish may not be ready. | Team proposed that social module be the first item that users see to encourage them to actively use the application which sponsor agreed and accepted. |
Technical Complexity
Quality of Product
Intermediate Deliverables
Stage | Specification | Modules |
---|---|---|
Project Requirements | Market Research | Market Research |
Project Management | Minutes | Minutes |
Metrics | Schedule Metrics Task Metrics Bug Metrics | |
Risk | Risks | |
Change Management | Change Management | |
Analysis | Use Case Diagram System Sequence Diagram Architecture Diagram |
Diagrams |
Design | Low-Fi Prototype High-Fi Prototype |
UI Prototype |
Testing | User Testing 1 | User Testing 1 |
Heuristic Evaluation | Heuristic Evaluation | |
User Testing 2 | User Testing 2 | |
User Testing 3 | User Testing 3 |
Quality
Deployment
- Google Play Store Link: https://play.google.com/store/apps/details?id=sozoco.co.naildeck
- Deployed Back-End Admin Website Link: http://1-dot-naildeckadminportal-1042.appspot.com/
Testing
User Testing | Date | Venue | Users | Link |
---|---|---|---|---|
User Testing 1 | 08 Aug 2015 | Based on testers' convenience | 14 Female (Age 14-24 years old) 2 Male (Age 14-24 years old) |
User Testing 1 |
Heuristic Evaluation | 12 Sept 2015 | SMU | 4 SMU female students | Heuristic Evaluation |
User Testing 2 | 02 Oct 2015 | SMU | 21 Females | User Testing 2 |
User Testing 3 | 16 Nov 2015 | NUS | 20 Females | User Testing 3 |
Reflection
Team Reflection
- Deeper insights into the world of colors
- Gained real-life experience of building a social media platform from scratch
- Experience in mobile application development and Google Services
Individual Reflection
Name | Reflections |
---|---|
Sanjay Nelagadde |
|
Ng Kiat Keng |
|
Lim Ting Zhi |
|
Chua Feng Ru |
|
Foo Yee Cheng |
|
Lim Yu Xiang Bendexter |