HeaderSIS.jpg

Difference between revisions of "IS480 Team wiki: 2015T2 REALIS - Mid-Term"

From IS480
Jump to navigation Jump to search
 
(37 intermediate revisions by the same user not shown)
Line 22: Line 22:
 
{| style="background-color:#ffffff; margin: 3px auto 0 auto" width="100%"
 
{| style="background-color:#ffffff; margin: 3px auto 0 auto" width="100%"
 
|-  
 
|-  
! style="text-align: center; background-color:#35383c; width: 33%"| [[IS480 Team wiki: 2015T2 REALIS| <font face = "Trebuchet MS" color="#FFFFFF" size=2><b>MAIN</b></font>]]
+
! style="text-align: center; background-color:#35383c; width: 33%"| [[IS480 Team wiki: 2015T2 REALIS - Acceptance| <font face = "Trebuchet MS" color="#FFFFFF" size=2><b>ACCEPTANCE</b></font>]]
 
! style="text-align: center; background-color:#68707A; width: 33%"| [[IS480 Team wiki: 2015T2 REALIS - Mid-Term| <font face = "Trebuchet MS" color="#FFFFFF" size=2><b>MID-TERM</b></font>]]
 
! style="text-align: center; background-color:#68707A; width: 33%"| [[IS480 Team wiki: 2015T2 REALIS - Mid-Term| <font face = "Trebuchet MS" color="#FFFFFF" size=2><b>MID-TERM</b></font>]]
 
! style="text-align: center; background-color:#35383c;"| [[IS480 Team wiki: 2015T2 REALIS - Final| <font face = "Trebuchet MS" color="#FFFFFF" size=2><b>FINAL</b></font>]]
 
! style="text-align: center; background-color:#35383c;"| [[IS480 Team wiki: 2015T2 REALIS - Final| <font face = "Trebuchet MS" color="#FFFFFF" size=2><b>FINAL</b></font>]]
 
|}
 
|}
 +
 +
==<font face = "Trebuchet MS" color="#000000"><b>Overview</b></font>==
 +
[[Media:REALIS_FYP_Mid-Term_v2.pdf| Slides for Mid-Term Review]]
 +
[http://fyp-realis.rhcloud.com/ Link to our product]
 +
[[Image:REALIS_Current_Progress_Phase5.png|center|900px|link=]]
 +
We have completed the primary functionalities of the project scope - the primary architecture of the for each modules. We are currently progressing into the secondary module - Accessibility Module. The project schedule is segregated into different phases to provide an overview for each development phase.
  
 
==<font face = "Trebuchet MS" color="#000000"><b>Project Progress</b></font>==
 
==<font face = "Trebuchet MS" color="#000000"><b>Project Progress</b></font>==
[https://www.dropbox.com/s/if8qba5pcscqgaa/REALIS%20Mid-Term.pdf?dl=0 Slides for Mid-Term Review] <br>
+
<b>Scope Changes:</b>
 +
* Schedule is categorized in Phases, followed by Iterations in each Phases, to give a better overview on what the Team aims to achieve for each stage of development.
  
* Team is currently progressing into the secondary module - Accessibility Module
+
<b>Time Constraint:</b>
* Everyone was busy during December 2014, hence iteration was altered to Technology Exploration Phase, to explore technologies required for this project.
+
* Time was required to explore new technologies for the application such as D3 library for Data-Visualization Module, Leaflet for Geo-Visualization Module and PostGIS for Geo-Processing Module.
* Two out of four testing sessions were conducted. The objectives for these testing sessions were to gather User Experience feedback on the user interface of the application.
+
* Increased complexity in Phase 3, for Data-Visualization, in preparation for the first User Experience Test with URA to gather feedback on application.
 +
 
 +
<b>Technical Difficulties:</b>
 +
* Processing filtered data sets in PostGIS database.
  
 
==<font face = "Trebuchet MS" color="#000000"><b>Project Management</b></font>==
 
==<font face = "Trebuchet MS" color="#000000"><b>Project Management</b></font>==
 
===<font face = "Trebuchet MS" color="#000000"><b>Project Status</b></font>===
 
===<font face = "Trebuchet MS" color="#000000"><b>Project Status</b></font>===
 +
[[Image:REALIS_ProjectSchedule_MidTerm_Scope.png|center|900px|link=]]
 +
<b>Changes that were made:</b>
 +
# Made Tabular View Module part of Data-Visualization Module because this involves just developing of a simple table.
 +
# Made Coordinate Linked View Module part of Geo-Visualization Module because this involves interaction between clicking of icons on the map with the charts.
 +
# Replaced Analytics Module with Accessibility Module because URA already has a group of Masters students helping them in this area.
 +
 +
<b>Completed Features:</b><br>
 +
{| class="wikitable" style="width:100%;"
 +
|-
 +
!style="width:15%"|Module
 +
!style="width:15%"|Feature
 +
!style="width:70%; text-align: center;"|Description
 +
|-
 +
|style="text-align: center;"|Data Upload
 +
|Upload data into application
 +
|<i>Update: This function has been replaced with the PostGIS database where datasets are stored.</i>
 +
|-
 +
|style="text-align: center;"|Geo-Processing
 +
|Geo-database
 +
|Internal processing of data to transaction points is implemented. This is for accessibility module.
 +
|-
 +
|style="text-align: center;"|Geo-Visualization
 +
|Geospatial analysis
 +
|An interactive visual map-based data is implemented.
 +
|-
 +
|style="text-align: center;"|Data-Visualization
 +
|Visual analysis
 +
|Interactive charts are implemented with filtering functions.
 +
|}
 +
 +
<b>About Accessibility Module:</b><br>
 +
This module involves identifying the accessibility of a property to the nearby facilities. The identified facilities serves the primary needs of the residents, based on walkability or transport. These facilities include bus-stops, primary and secondary schools, parks, community centers, etc. The purpose of having an Accessibility Index is to observe the relationship between Accessibility with the price of the Property.<br><br>
 +
Given that the main focus of this project is building PostGIS database, this module will be heavily reliant on PostGIS database through processing calculations at the back-end. Further explanation on PostGIS architecture will be in [[#Technical Complexity|Technical Complexity]].
 +
 
===<font face = "Trebuchet MS" color="#000000"><b>Project Schedule (Plan Vs Actual)</b></font>===
 
===<font face = "Trebuchet MS" color="#000000"><b>Project Schedule (Plan Vs Actual)</b></font>===
 +
====<font face = "Trebuchet MS" color="#000000"><b>Project Schedule (Plan Vs Actual) - Acceptance</b></font>====
 +
[[Image:REALIS_ProjectSchedule_Acceptance.png|center|900px|link=]]
 +
<b>Comments by The Team:</b><br>
 +
* Scope of modules were overlooked. Some were too simple, while the rest were too complex.
 +
* Completion of modules were not ranked based on the primary to secondary needs. Instead, modules scheduled based on the importance and simplicity.
 +
* The team was unclear of the requirements and scope when this was planned, however, changes were made along the way, reflecting on the completion deadline of each modules.
 +
 +
<b>Changes that were made:</b><br>
 +
* Added phases to the schedule as a top-level overview for each iterations. The purpose of this is to give an overview of the development progress for the project.
 +
* Schedule has been edited after the first iteration in the picture above. The newly edited planned schedule is shown below.
 +
 +
====<font face = "Trebuchet MS" color="#000000"><b>Project Schedule (Plan Vs Actual) - Mid-Term</b></font>====
 +
[[Image:REALIS_ProjectSchedule_MidTerm_PvA.png|center|900px|link=]]<br>
 +
[[Image:REALIS_ProjectSchedule_MidTerm_GranttChart.png|center|900px|link=]]
 +
 +
{| class="wikitable" style="width:100%;"
 +
|-
 +
! scope="row" colspan="10" style="background-color:#423437;"| <font color="#FFFFFF">Overall </font>
 +
|-
 +
!style="width:16%"|Phase
 +
!style="width:5%"|Iteration
 +
!style="width:7%; text-align: center;"|Planned Duration
 +
!style="width:7%; text-align: center;"|Planned Start
 +
!style="width:7%; text-align: center;"|Planned End
 +
!style="width:7%; text-align: center;"|Actual Duration
 +
!style="width:7%; text-align: center;"|Actual Start
 +
!style="width:7%; text-align: center;"|Actual End
 +
!style="width:5%; text-align: center;"|Delay||Comments
 +
|-
 +
![1] Requirements Gathering
 +
!1
 +
|style="text-align: center;"|30 days
 +
|06/10/2014
 +
|05/11/2014
 +
|style="text-align: center;"|37 days
 +
|06/10/2014
 +
|12/11/2014
 +
|style="text-align: center;"|7 days
 +
|Review application after acceptance. Reviewed schedule for iteration 2.
 +
|-
 +
![2] Technology Exploration
 +
!2
 +
|style="text-align: center;"|48 days
 +
|13/11/2014
 +
|31/12/2014
 +
|style="text-align: center;"|48 days
 +
|13/11/2014
 +
|31/12/2014
 +
|style="text-align: center;"|0 days
 +
|Different personal schedules for every teammates as everyone was travelling. Tasks were switched to research module to explore the technologies used for this project.
 +
|-
 +
![3] Wire-frames and Mockup Designs
 +
!3
 +
|style="text-align: center;"|21 days
 +
|01/01/2015
 +
|21/01/2015
 +
|style="text-align: center;"|31 days
 +
|01/01/2015
 +
|31/01/2015
 +
|style="text-align: center;"|10 days
 +
|Increased in scope for Data-Visualization module, and stopped development to solve high impact bugs found.
 +
|-
 +
![4] Architecture Designs
 +
!4
 +
|style="text-align: center;"|21 days
 +
|01/02/2015
 +
|21/02/2015
 +
|style="text-align: center;"|21 days
 +
|01/02/2015
 +
|21/02/2015
 +
|style="text-align: center;"|0 days
 +
|On track
 +
|}
 +
 +
{| class="wikitable mw-collapsible mw-collapsed" style="width:100%"
 +
|-
 +
! scope="row" colspan="9" | Phase 1: Requirements Gathering
 +
|-
 +
!style="width:16%"|Task
 +
!style="width:7%; text-align: center;"|Planned Duration
 +
!style="width:7%; text-align: center;"|Planned Start
 +
!style="width:7%; text-align: center;"|Planned End
 +
!style="width:7%; text-align: center;"|Actual Duration
 +
!style="width:7%; text-align: center;"|Actual Start
 +
!style="width:7%; text-align: center;"|Actual End
 +
!style="width:5%; text-align: center;"|Delay||Comments
 +
|-
 +
|style="background-color:#ad8890;"|<font color="#FFFFFF"> Iteration 1</font>
 +
|style="text-align: center; background-color:#ad8890;"|<font color="#FFFFFF"> 30 days</font>
 +
|style="background-color:#ad8890;"|<font color="#FFFFFF"> 06/10/2014</font>
 +
|style="background-color:#ad8890;"|<font color="#FFFFFF"> 05/11/2014</font>
 +
|style="text-align: center; background-color:#ad8890;"|<font color="#FFFFFF"> 37 days</font>
 +
|style="background-color:#ad8890;"|<font color="#FFFFFF"> 06/10/2014</font>
 +
|style="background-color:#ad8890;"|<font color="#FFFFFF"> 12/11/2014</font>
 +
|style="text-align: center; background-color:#ad8890;"|<font color="#FFFFFF"> 7 days</font>
 +
|style="background-color:#ad8890;"|<font color="#FFFFFF">Review application after acceptance. Reviewed schedule for iteration 2.</font>
 +
|-
 +
|colspan="9" style="background-color:#BBBCBD;"|<u><i><b>Bootstrap Module</b></i></u>
 +
|-
 +
|CSV file upload
 +
|style="text-align: center;"|3 days
 +
|22/10/2014
 +
|24/10/2014
 +
|style="text-align: center;"|3 days
 +
|22/10/2014
 +
|24/10/2014
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|-
 +
|Convert data into GeoJSON objects
 +
|style="text-align: center;"|2 days
 +
|25/10/2014
 +
|26/10/2014
 +
|style="text-align: center;"|2 days
 +
|25/10/2014
 +
|26/10/2014
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|-
 +
|colspan="9" style="background-color:#BBBCBD;"|<u><i><b>Geo-Visualization Module</b></i></u>
 +
|-
 +
|Pin-Mapping, Tool-tip, Interactive Legend and Clustering
 +
|style="text-align: center;"|3 days
 +
|28/10/2014
 +
|30/10/2014
 +
|style="text-align: center;"|3 days
 +
|28/10/2014
 +
|30/10/2014
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|-
 +
|colspan="9" style="background-color:#BBBCBD;"|<u><i><b>Testing and Debugging</b></i></u>
 +
|-
 +
|Regression testing
 +
|style="text-align: center;"|1 day
 +
|31/10/2014
 +
|31/10/2014
 +
|style="text-align: center;"|1 day
 +
|31/10/2014
 +
|31/10/2014
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|-
 +
|Debugging
 +
|style="text-align: center;"|3 days
 +
|1/11/2014
 +
|3/11/2014
 +
|style="text-align: center;"|4 days
 +
|1/11/2014
 +
|4/11/2014
 +
|style="text-align: center;"|1 day
 +
|NA
 +
|}
 +
 +
{| class="wikitable mw-collapsible mw-collapsed" style="width:100%"
 +
|-
 +
! scope="row" colspan="9" | Phase 2: Technology Exploration
 +
|-
 +
!style="width:16%"|Task
 +
!style="width:7%; text-align: center;"|Planned Duration
 +
!style="width:7%; text-align: center;"|Planned Start
 +
!style="width:7%; text-align: center;"|Planned End
 +
!style="width:7%; text-align: center;"|Actual Duration
 +
!style="width:7%; text-align: center;"|Actual Start
 +
!style="width:7%; text-align: center;"|Actual End
 +
!style="width:5%; text-align: center;"|Delay||Comments
 +
|-
 +
|style="background-color:#ad8890;"|<font color="#FFFFFF"> Iteration 2</font>
 +
|style="text-align: center; background-color:#ad8890;"|<font color="#FFFFFF"> 48 days</font>
 +
|style="background-color:#ad8890;"|<font color="#FFFFFF"> 13/11/2014</font>
 +
|style="background-color:#ad8890;"|<font color="#FFFFFF"> 31/12/2014</font>
 +
|style="text-align: center; background-color:#ad8890;"|<font color="#FFFFFF"> 48 days</font>
 +
|style="background-color:#ad8890;"|<font color="#FFFFFF"> 13/11/2014</font>
 +
|style="background-color:#ad8890;"|<font color="#FFFFFF"> 31/12/2014</font>
 +
|style="text-align: center; background-color:#ad8890;"|<font color="#FFFFFF"> 0 days</font>
 +
|style="background-color:#ad8890;"|<font color="#FFFFFF">Different personal schedules for every teammates as everyone was travelling. Tasks were switched to research module to explore the technologies used for this project.</font>
 +
|-
 +
|colspan="9" style="background-color:#BBBCBD;"|<u><i><b>Research Module</b></i></u>
 +
|-
 +
|Heatmap and Chloropleth
 +
|style="text-align: center;"|48 days
 +
|13/11/2014
 +
|31/12/2014
 +
|style="text-align: center;"|48 days
 +
|13/11/2014
 +
|31/12/2014
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|-
 +
|Database Selection and Design
 +
|style="text-align: center;"|48 days
 +
|13/11/2014
 +
|31/12/2014
 +
|style="text-align: center;"|48 days
 +
|13/11/2014
 +
|31/12/2014
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|-
 +
|Charts and D3 Graphs
 +
|style="text-align: center;"|48 days
 +
|13/11/2014
 +
|31/12/2014
 +
|style="text-align: center;"|48 days
 +
|13/11/2014
 +
|31/12/2014
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|}
 +
 +
{| class="wikitable mw-collapsible mw-collapsed" style="width:100%"
 +
|-
 +
! scope="row" colspan="9" | Phase 3: Wire-frames and Mockup Designs
 +
|-
 +
!style="width:16%"|Task
 +
!style="width:7%; text-align: center;"|Planned Duration
 +
!style="width:7%; text-align: center;"|Planned Start
 +
!style="width:7%; text-align: center;"|Planned End
 +
!style="width:7%; text-align: center;"|Actual Duration
 +
!style="width:7%; text-align: center;"|Actual Start
 +
!style="width:7%; text-align: center;"|Actual End
 +
!style="width:5%; text-align: center;"|Delay||Comments
 +
|-
 +
|style="background-color:#ad8890;"|<font color="#FFFFFF"> Iteration 3</font>
 +
|style="text-align: center; background-color:#ad8890;"|<font color="#FFFFFF"> 21 days</font>
 +
|style="background-color:#ad8890;"|<font color="#FFFFFF"> 01/01/2015</font>
 +
|style="background-color:#ad8890;"|<font color="#FFFFFF"> 21/01/2015</font>
 +
|style="text-align: center; background-color:#ad8890;"|<font color="#FFFFFF"> 31 days</font>
 +
|style="background-color:#ad8890;"|<font color="#FFFFFF"> 01/01/2015</font>
 +
|style="background-color:#ad8890;"|<font color="#FFFFFF"> 31/01/2015</font>
 +
|style="text-align: center; background-color:#ad8890;"|<font color="#FFFFFF"> 10 days</font>
 +
|style="background-color:#ad8890;"|<font color="#FFFFFF">Increased in scope for Data-Visualization module, and stopped development to solve high impact bugs found.</font>
 +
|-
 +
|colspan="9" style="background-color:#BBBCBD;"|<u><i><b>Research Module</b></i></u>
 +
|-
 +
|PostGIS architecture
 +
|style="text-align: center;"|31 days
 +
|01/01/2015
 +
|31/01/2015
 +
|style="text-align: center;"|31 days
 +
|01/01/2015
 +
|31/01/2015
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|-
 +
|Leaflet and mapping
 +
|style="text-align: center;"|31 days
 +
|01/01/2015
 +
|31/01/2015
 +
|style="text-align: center;"|31 days
 +
|01/01/2015
 +
|31/01/2015
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|-
 +
|colspan="9" style="background-color:#BBBCBD;"|<u><i><b>Geo-Visualization Module</b></i></u>
 +
|-
 +
|Search bar for postal code, district, planning area, price range, size range
 +
|style="text-align: center;"|3 days
 +
|06/01/2015
 +
|08/01/2015
 +
|style="text-align: center;"|3 days
 +
|06/01/2015
 +
|08/01/2015
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|-
 +
|Localized search in the map
 +
|style="text-align: center;"|2 days
 +
|09/01/2015
 +
|10/01/2015
 +
|style="text-align: center;"|2 days
 +
|09/01/2015
 +
|10/01/2015
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|-
 +
|colspan="9" style="background-color:#BBBCBD;"|<u><i><b>Data-Visualization Module</b></i></u>
 +
|-
 +
|Line Chart
 +
|style="text-align: center;"|4 days
 +
|06/01/2015
 +
|09/01/2015
 +
|style="text-align: center;"|8 days
 +
|06/01/2015
 +
|13/01/2015
 +
|style="text-align: center;"|4 days
 +
|Stopped development and solved bug.
 +
|-
 +
|Histogram
 +
|style="text-align: center;"|3 days
 +
|14/01/2015
 +
|16/01/2015
 +
|style="text-align: center;"|3 days
 +
|14/01/2015
 +
|16/01/2015
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|-
 +
|Box Plot
 +
|colspan="3" style="text-align: center;"| New task
 +
|style="text-align: center;"|4 days
 +
|16/01/2015
 +
|19/01/2015
 +
|style="text-align: center;"|0 days
 +
|
 +
|-
 +
|Pie Chart
 +
|colspan="3" style="text-align: center;"| New task
 +
|style="text-align: center;"|4 days
 +
|20/01/2015
 +
|23/01/2015
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|-
 +
|colspan="9" style="background-color:#BBBCBD;"|<u><i><b>Testing and Debugging</b></i></u>
 +
|-
 +
|Testing: User Experience Test at URA
 +
|style="text-align: center;"|1 day
 +
|28/01/2015
 +
|28/01/2015
 +
|style="text-align: center;"|1 day
 +
|28/01/2015
 +
|28/01/2015
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|-
 +
|Debugging
 +
|style="text-align: center;"|3 days
 +
|29/01/2015
 +
|31/01/2015
 +
|style="text-align: center;"|3 days
 +
|29/01/2015
 +
|31/01/2015
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|}
 +
 +
{| class="wikitable mw-collapsible mw-collapsed" style="width:100%"
 +
|-
 +
! scope="row" colspan="9" | Phase 4: Architecture Designs
 +
|-
 +
!style="width:16%"|Task
 +
!style="width:7%; text-align: center;"|Planned Duration
 +
!style="width:7%; text-align: center;"|Planned Start
 +
!style="width:7%; text-align: center;"|Planned End
 +
!style="width:7%; text-align: center;"|Actual Duration
 +
!style="width:7%; text-align: center;"|Actual Start
 +
!style="width:7%; text-align: center;"|Actual End
 +
!style="width:5%; text-align: center;"|Delay||Comments
 +
|-
 +
|style="background-color:#ad8890;"|<font color="#FFFFFF"> Iteration 4</font>
 +
|style="text-align: center; background-color:#ad8890;"|<font color="#FFFFFF"> 21 days</font>
 +
|style="background-color:#ad8890;"|<font color="#FFFFFF"> 01/02/2015</font>
 +
|style="background-color:#ad8890;"|<font color="#FFFFFF"> 21/02/2015</font>
 +
|style="text-align: center; background-color:#ad8890;"|<font color="#FFFFFF"> 21 days</font>
 +
|style="background-color:#ad8890;"|<font color="#FFFFFF"> 01/02/2015</font>
 +
|style="background-color:#ad8890;"|<font color="#FFFFFF"> 21/02/2015</font>
 +
|style="text-align: center; background-color:#ad8890;"|<font color="#FFFFFF"> 0 days</font>
 +
|style="background-color:#ad8890;"|<font color="#FFFFFF">NA</font>
 +
|-
 +
|colspan="9" style="background-color:#BBBCBD;"|<u><i><b>Geo-Processing Module</b></i></u>
 +
|-
 +
|Design and develop database
 +
|style="text-align: center;"|2 days
 +
|01/02/2015
 +
|02/02/2015
 +
|style="text-align: center;"|3 days
 +
|01/02/2015
 +
|03/02/2015
 +
|style="text-align: center;"|1 day
 +
|This belongs to scripting instead of diagram.
 +
|-
 +
|Converting Geo JSON to X,Y Coordinates
 +
|style="text-align: center;"|2 days
 +
|03/02/2015
 +
|04/02/2015
 +
|style="text-align: center;"|2 days
 +
|04/02/2015
 +
|05/02/2015
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|-
 +
|Import facility database
 +
|style="text-align: center;"|2 days
 +
|05/02/2015
 +
|06/02/2015
 +
|style="text-align: center;"|4 days
 +
|06/02/2015
 +
|09/02/2015
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|-
 +
|Implement geospatial joint
 +
|style="text-align: center;"|3 days
 +
|07/02/2015
 +
|09/02/2015
 +
|style="text-align: center;"|3 days
 +
|10/02/2015
 +
|12/02/2015
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|-
 +
|Import result into database
 +
|style="text-align: center;"|1 day
 +
|10/02/2015
 +
|10/02/2015
 +
|colspan="3" style="text-align: center;"|Pushed to next iteration
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|-
 +
|colspan="9" style="background-color:#BBBCBD;"|<u><i><b>Geo-Visualization Module</b></i></u>
 +
|-
 +
|Generate heatmap for accessibility index
 +
|style="text-align: center;"|2 days
 +
|11/02/2015
 +
|12/02/2015
 +
|colspan="3" style="text-align: center;"|Pushed to next iteration
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|-
 +
|Polygon selection on map with dynamic charting
 +
|colspan="3" style="text-align: center;"|New Task
 +
|style="text-align: center;"|7 days
 +
|11/02/2015
 +
|15/02/2015
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|-
 +
|colspan="9" style="background-color:#BBBCBD;"|<u><i><b>Data-Visualization Module</b></i></u>
 +
|-
 +
|Time Series Charts with horizontal line to reflect on percentile level
 +
|style="text-align: center;"|2 days
 +
|07/02/2015
 +
|08/02/2015
 +
|style="text-align: center;"|3 days
 +
|07/02/2015
 +
|09/02/2015
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|-
 +
|Box plot with cross-filter
 +
|style="text-align: center;"|3 days
 +
|10/02/2015
 +
|12/02/2015
 +
|style="text-align: center;"|4 days
 +
|10/02/2015
 +
|13/02/2015
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|-
 +
|Dynamic charting per region interacting with map
 +
|style="text-align: center;"|2 days
 +
|17/02/2015
 +
|19/02/2015
 +
|style="text-align: center;"|2 days
 +
|17/02/2015
 +
|19/02/2015
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|-
 +
|Scatter plot on price vs accessibility index
 +
|style="text-align: center;"|3 days
 +
|14/02/2015
 +
|16/02/2015
 +
|colspan="3" style="text-align: center;"|Pushed to next iteration
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|-
 +
|colspan="9" style="background-color:#BBBCBD;"|<u><i><b>Testing and Debugging</b></i></u>
 +
|-
 +
|Testing: User Experience Test at URA
 +
|style="text-align: center;"|1 day
 +
|12/02/2015
 +
|12/02/2015
 +
|style="text-align: center;"|1 day
 +
|12/02/2015
 +
|12/02/2015
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|-
 +
|Debugging
 +
|style="text-align: center;"|4 days
 +
|13/02/2015
 +
|16/02/2015
 +
|style="text-align: center;"|4 days
 +
|13/02/2015
 +
|16/02/2015
 +
|style="text-align: center;"|0 days
 +
|NA
 +
|}
 +
 
===<font face = "Trebuchet MS" color="#000000"><b>Project Metrics</b></font>===
 
===<font face = "Trebuchet MS" color="#000000"><b>Project Metrics</b></font>===
 +
====<font face = "Trebuchet MS" color="#000000"><b>Schedule Metric</b></font>====
 +
[[Image:REALIS_SM_index.png|center|750px]]
 +
 +
====<font face = "Trebuchet MS" color="#000000"><b>Bugs Metric</b></font>====
 +
<center><b>Bugs Index Per Iterations</b></center>
 +
[[Image:REALIS_Bugs_index.png|center|750px]]
 +
 +
 +
<center><b>Bugs Score</b></center>
 +
[[Image:REALIS_Bugs_Score.png|center|750px]]
 +
 +
{| class="wikitable" style="width:100%;"
 +
|-
 +
! scope="row" colspan="3" style="background-color:#423437;"| <font color="#FFFFFF">Bugs Score</font>
 +
|-
 +
!style="width:33%"|Phase
 +
!style="width:33%"|Iteration
 +
!style="width:33%; text-align: center;"|Total Bugs Score
 +
|-
 +
![1] Requirements Gathering
 +
!1
 +
|style="text-align: center;"|6
 +
|-
 +
![2] Technology Exploration
 +
!2
 +
|style="text-align: center;"|0
 +
|-
 +
![3] Wire-frames and Mockup Designs
 +
!3
 +
|style="text-align: center;"|11
 +
|-
 +
![4] Architecture Designs
 +
!4
 +
|style="text-align: center;"|7
 +
|}
 +
 +
{| class="wikitable mw-collapsible mw-collapsed" style="width:100%"
 +
|-
 +
! scope="row" colspan="8" | Iteration 1: Requirements Gathering
 +
|-
 +
!style="width:15%"|Error Message
 +
!style="width:7%"|Impact
 +
!style="width:7%"|Solutions
 +
!style="width:7%"|Date of Bug Faced
 +
!style="width:7%"|Time of Bug Faced
 +
!style="width:7%"|Date of Bug Solved
 +
!style="width:7%"|Time of Bug Solved
 +
!style="width:7%"|Days for Debug
 +
|-
 +
|CSV file containing transaction data is loaded but could not print out JSON string due to null pointer exception.
 +
|High Impact - 5
 +
|Do a thorough cleaning on CSV file to scan for null values
 +
|01/11/2014
 +
|1000
 +
|03/11/2014
 +
|1200
 +
|3
 +
|-
 +
|Interactive legend does not work properly as filtering by only one property types still returns results of multiple property types.
 +
|Low Impact - 1
 +
|Making use of a crossfilter library, dc.js to re-code the legend part in order to achieve correct results.
 +
|03/11/2014
 +
|1400
 +
|04/11/2014
 +
|1600
 +
|2
 +
|}
 +
 +
{| class="wikitable mw-collapsible mw-collapsed" style="width:100%"
 +
|-
 +
! scope="row" colspan="8" | Iteration 2: Technology Exploration
 +
|-
 +
!style="width:15%"|Error Message
 +
!style="width:7%"|Impact
 +
!style="width:7%"|Solutions
 +
!style="width:7%"|Date of Bug Faced
 +
!style="width:7%"|Time of Bug Faced
 +
!style="width:7%"|Date of Bug Solved
 +
!style="width:7%"|Time of Bug Solved
 +
!style="width:7%"|Days for Debug
 +
|-
 +
|colspan="8"|No bugs as this iteration consists of only research on technologies used for the project.
 +
|}
 +
 +
{| class="wikitable mw-collapsible mw-collapsed" style="width:100%"
 +
|-
 +
! scope="row" colspan="8" | Iteration 3: Wire-frames and Mockup Designs
 +
|-
 +
!style="width:15%"|Error Message
 +
!style="width:7%"|Impact
 +
!style="width:7%"|Solutions
 +
!style="width:7%"|Date of Bug Faced
 +
!style="width:7%"|Time of Bug Faced
 +
!style="width:7%"|Date of Bug Solved
 +
!style="width:7%"|Time of Bug Solved
 +
!style="width:7%"|Days for Debug
 +
|-
 +
|Line graphs disappear when using date filter
 +
|High Impact - 5
 +
|Make use of a new JavaScript cross-filter helper library, reductions, to re-code the line graphs.
 +
|09/01/2015
 +
|1200
 +
|13/01/2015
 +
|0200
 +
|5
 +
|-
 +
|Not aware that coordinates returned by invoking OneMap API are in SVY21 projection system. Hence map points are in wrong positions.
 +
|High Impact - 5
 +
|Make use of external JavaScript libraries for geo-projection conversion, called SVY21().
 +
|09/01/2015
 +
|1000
 +
|11/01/2015
 +
|1200
 +
|3
 +
|-
 +
|When user keys in a search query, search function might return global results instead of Singapore results.
 +
|Low Impact - 1
 +
|Make the search function localised in Singapore instead of in a global scale.
 +
|29/01/2015
 +
|1400
 +
|31/01/2015
 +
|1600
 +
|3
 +
|}
 +
 +
{| class="wikitable mw-collapsible mw-collapsed" style="width:100%"
 +
|-
 +
! scope="row" colspan="8" | Iteration 4: Architecture Designs
 +
|-
 +
!style="width:15%"|Error Message
 +
!style="width:7%"|Impact
 +
!style="width:7%"|Solutions
 +
!style="width:7%"|Date of Bug Faced
 +
!style="width:7%"|Time of Bug Faced
 +
!style="width:7%"|Date of Bug Solved
 +
!style="width:7%"|Time of Bug Solved
 +
!style="width:7%"|Days for Debug
 +
|-
 +
|Cannot retrieve the data from the PostGis database due to the mismatch of column names.
 +
|High Impact - 5
 +
|Standarise the column name between the the java and javascipt files.
 +
|14/02/2015
 +
|1400
 +
|15/02/2015
 +
|1600
 +
|2
 +
|-
 +
|Inconsistent filter criteria when the pie chart is changed to row chart and vice-versa for the onclick event.
 +
|Low Impact - 1
 +
|Apply the filter criteria to the rendering of the chart for the onclick event.
 +
|13/02/2015
 +
|0900
 +
|14/02/2015
 +
|1200
 +
|2
 +
|-
 +
|Polygon selection of the markers on the map does not affect the chart popup.
 +
|Low Impact - 1
 +
|Change to the correct div id of the chart popup.
 +
|15/02/2015
 +
|1300
 +
|16/02/2015
 +
|1600
 +
|2
 +
|}
 +
 
===<font face = "Trebuchet MS" color="#000000"><b>Project Risks</b></font>===
 
===<font face = "Trebuchet MS" color="#000000"><b>Project Risks</b></font>===
 +
{| class="wikitable" style="width:100%"
 +
|-
 +
! scope="row" colspan="5" | Preparation Phase
 +
|-
 +
!style="width:35%"|Risk
 +
!style="width:10%"|Probability
 +
!style="width:10%"|Impact
 +
!style="width:10%"|Result
 +
!style="width:35%"|Mitigation
 +
|-
 +
|Bugs in charting library
 +
|style="text-align: center;"|High
 +
|style="text-align: center;"|High
 +
|style="text-align: center;"|A
 +
|Look for alternative charting
 +
|-
 +
|Sponsors unsure of product delivery (they are unsure if analytics module is really needed)
 +
|style="text-align: center;"|High
 +
|style="text-align: center;"|High
 +
|style="text-align: center;"|A
 +
|Do a prototype first as a proof of concept
 +
|-
 +
|Coordinated linked view
 +
|style="text-align: center;"|High
 +
|style="text-align: center;"|High
 +
|style="text-align: center;"|A
 +
|Use filter for individual module
 +
|-
 +
|Stakeholder requirements not effectively communicated
 +
|style="text-align: center;"|High
 +
|style="text-align: center;"|High
 +
|style="text-align: center;"|A
 +
|Prepare more than what is required as a proof of concept
 +
|-
 +
|Using new libraries, such as D3 and leaflet
 +
|style="text-align: center;"|Moderate
 +
|style="text-align: center;"|Moderate
 +
|style="text-align: center;"|B
 +
|Do Research on the library prior to coding
 +
|}
 +
 
===<font face = "Trebuchet MS" color="#000000"><b>Technical Complexity</b></font>===
 
===<font face = "Trebuchet MS" color="#000000"><b>Technical Complexity</b></font>===
 +
[[Image:REALIS_Technical_Diagram.png|center|900px]]
 +
 
==<font face = "Trebuchet MS" color="#000000"><b>Quality of Product</b></font>==
 
==<font face = "Trebuchet MS" color="#000000"><b>Quality of Product</b></font>==
 
===<font face = "Trebuchet MS" color="#000000"><b>Intermediate Deliverables</b></font>===
 
===<font face = "Trebuchet MS" color="#000000"><b>Intermediate Deliverables</b></font>===
===<font face = "Trebuchet MS" color="#000000"><b>Deployment</b></font>===
+
{| border="1"
 +
|- style="background:blue; color:white"
 +
|align="center"| Stage
 +
|align="center"| Specification
 +
|align="center"| Modules
 +
|-
 +
 
 +
|rowspan="2"| Project Management
 +
|| Minutes
 +
|| [[IS480 Team wiki: 2015T2 REALIS Project Management - Minutes | Minutes]]
 +
|-
 +
 
 +
|| Schedule Metrics
 +
|| [[IS480 Team wiki: 2015T2 REALIS Project Management - Metrics | Metrics]]
 +
|-
 +
 
 +
|| Requirements
 +
|| Design Specifications
 +
|| [[IS480 Team wiki: 2015T2 REALIS Project Management - Project Scope | Project Scope]]
 +
|-
 +
 
 +
|rowspan="3"| Analysis
 +
|| Use case
 +
|| [[IS480 Team wiki: 2015T2 REALIS Documentation - Analysis | Use case Diagram]]
 +
|-
 +
 
 +
|| Architecture Diagram
 +
|| [[IS480 Team wiki: 2015T2 REALIS Documentation  - Design | Architecture Diagram]]
 +
|-
 +
 
 +
|| Workflow Diagram
 +
|| [[IS480 Team wiki: 2015T2 REALIS Documentation  - Design | Workflow Diagram]]
 +
|-
 +
 
 +
|rowspan="1"| Design
 +
|| UI Mockups
 +
|| [[IS480 Team wiki: 2015T2 REALIS Documentation  | UI Mockups]]
 +
|-
 +
 
 +
|| Testing
 +
|| User test plan
 +
|| [[IS480 Team wiki: 2015T2 REALIS Documentation  - Testing | User Tests]]
 +
|}
 +
 
 
===<font face = "Trebuchet MS" color="#000000"><b>Testing</b></font>===
 
===<font face = "Trebuchet MS" color="#000000"><b>Testing</b></font>===
 +
{| class="wikitable" style="width:100%"
 +
|-
 +
! scope="row" colspan="4" | 29 January 2015 & 12 February 2015 : User Experience Test
 +
|-
 +
!style="width:21%"|Objective
 +
!style="width:26%"|Questions Asked
 +
!style="width:26%"|Feedback
 +
!Solution
 +
|-
 +
| style="vertical-align:top;"|
 +
To gather user experience feedback on the prototype after demonstrating the application to the participants.
 +
| style="vertical-align:top;"|
 +
# What information presented on the tooltip is considered irrelevant to you?
 +
# Which charts are redundant?
 +
# Which charts are difficult to understand?
 +
# Which charts are useful for your analysis?
 +
# What charts do you use in your daily job?
 +
# Is the layout of the application aesthetically pleasing?
 +
# What do you think of the placement of the map and charts?
 +
# What other features would you like to see on this application?
 +
# Which feature(s) you think is/are useful but needs improvement?
 +
| style="vertical-align:top;"|
 +
<b>3 Property Analysts and 2 IT System Analysts</b><br>
 +
# Too many graphs/buttons to click on. It is confusing and aesthetically unpleasing. Graphs like bar chart, line chart and pie chart are enough
 +
# Selection of base maps is not required. They are good with just one layout
 +
# Include search by tenant, district and properties that are nearby and comparable, size of property
 +
# PDF download of data in various format
 +
# Select an area to choose multiple points
 +
# Need to improve on accuracy
 +
# Cut down on the amount of information shown in the tool tip to 4-5 lines
 +
# Change the x-axis units of the graphs to month instead of days
 +
# Fixed layout for the graphs are preferable
 +
# Do drop down for categories like districts etc
 +
<b>3 Physical Planners</b><br>
 +
# Good to have an option to search by postal code
 +
# Improve on the accuracy in mapping postal code to lat long
 +
# Too many different combinations of pictures and colors in markers which are confusing
 +
# Draw a polygon on the map to select multiple markers and show the results
 +
# Add in the ability to have street view. This is important to the planners
 +
| style="vertical-align:top;"|
 +
# Implement relevant charts based on the Property Analysts/Planners feedback.
 +
# Implement a search function for postal codes, planning areas, districts, etc.
 +
# Implement a drawing function for selection of multiple markers on the map.
 +
|}
 +
 
==<font face = "Trebuchet MS" color="#000000"><b>Reflection</b></font>==
 
==<font face = "Trebuchet MS" color="#000000"><b>Reflection</b></font>==
===<font face = "Trebuchet MS" color="#000000"><b>Jeanne Sim</b></font>===
+
[[Image:REALIS_Reflections.png|center|900px|link=]]
===<font face = "Trebuchet MS" color="#000000"><b>Jovin Hoon</b></font>===
 
===<font face = "Trebuchet MS" color="#000000"><b>Tan Yihao</b></font>===
 
===<font face = "Trebuchet MS" color="#000000"><b>Zheng Boyang</b></font>===
 

Latest revision as of 17:14, 8 April 2015

REALIS-Banner-main4.png
HOME   PROJECT OVERVIEW   PROJECT MANAGEMENT   DOCUMENTATION   THE TEAM
ACCEPTANCE MID-TERM FINAL

Overview

Slides for Mid-Term Review Link to our product

REALIS Current Progress Phase5.png

We have completed the primary functionalities of the project scope - the primary architecture of the for each modules. We are currently progressing into the secondary module - Accessibility Module. The project schedule is segregated into different phases to provide an overview for each development phase.

Project Progress

Scope Changes:

  • Schedule is categorized in Phases, followed by Iterations in each Phases, to give a better overview on what the Team aims to achieve for each stage of development.

Time Constraint:

  • Time was required to explore new technologies for the application such as D3 library for Data-Visualization Module, Leaflet for Geo-Visualization Module and PostGIS for Geo-Processing Module.
  • Increased complexity in Phase 3, for Data-Visualization, in preparation for the first User Experience Test with URA to gather feedback on application.

Technical Difficulties:

  • Processing filtered data sets in PostGIS database.

Project Management

Project Status

REALIS ProjectSchedule MidTerm Scope.png

Changes that were made:

  1. Made Tabular View Module part of Data-Visualization Module because this involves just developing of a simple table.
  2. Made Coordinate Linked View Module part of Geo-Visualization Module because this involves interaction between clicking of icons on the map with the charts.
  3. Replaced Analytics Module with Accessibility Module because URA already has a group of Masters students helping them in this area.

Completed Features:

Module Feature Description
Data Upload Upload data into application Update: This function has been replaced with the PostGIS database where datasets are stored.
Geo-Processing Geo-database Internal processing of data to transaction points is implemented. This is for accessibility module.
Geo-Visualization Geospatial analysis An interactive visual map-based data is implemented.
Data-Visualization Visual analysis Interactive charts are implemented with filtering functions.

About Accessibility Module:
This module involves identifying the accessibility of a property to the nearby facilities. The identified facilities serves the primary needs of the residents, based on walkability or transport. These facilities include bus-stops, primary and secondary schools, parks, community centers, etc. The purpose of having an Accessibility Index is to observe the relationship between Accessibility with the price of the Property.

Given that the main focus of this project is building PostGIS database, this module will be heavily reliant on PostGIS database through processing calculations at the back-end. Further explanation on PostGIS architecture will be in Technical Complexity.

Project Schedule (Plan Vs Actual)

Project Schedule (Plan Vs Actual) - Acceptance

REALIS ProjectSchedule Acceptance.png

Comments by The Team:

  • Scope of modules were overlooked. Some were too simple, while the rest were too complex.
  • Completion of modules were not ranked based on the primary to secondary needs. Instead, modules scheduled based on the importance and simplicity.
  • The team was unclear of the requirements and scope when this was planned, however, changes were made along the way, reflecting on the completion deadline of each modules.

Changes that were made:

  • Added phases to the schedule as a top-level overview for each iterations. The purpose of this is to give an overview of the development progress for the project.
  • Schedule has been edited after the first iteration in the picture above. The newly edited planned schedule is shown below.

Project Schedule (Plan Vs Actual) - Mid-Term

REALIS ProjectSchedule MidTerm PvA.png


REALIS ProjectSchedule MidTerm GranttChart.png
Overall
Phase Iteration Planned Duration Planned Start Planned End Actual Duration Actual Start Actual End Delay Comments
[1] Requirements Gathering 1 30 days 06/10/2014 05/11/2014 37 days 06/10/2014 12/11/2014 7 days Review application after acceptance. Reviewed schedule for iteration 2.
[2] Technology Exploration 2 48 days 13/11/2014 31/12/2014 48 days 13/11/2014 31/12/2014 0 days Different personal schedules for every teammates as everyone was travelling. Tasks were switched to research module to explore the technologies used for this project.
[3] Wire-frames and Mockup Designs 3 21 days 01/01/2015 21/01/2015 31 days 01/01/2015 31/01/2015 10 days Increased in scope for Data-Visualization module, and stopped development to solve high impact bugs found.
[4] Architecture Designs 4 21 days 01/02/2015 21/02/2015 21 days 01/02/2015 21/02/2015 0 days On track
Phase 1: Requirements Gathering
Task Planned Duration Planned Start Planned End Actual Duration Actual Start Actual End Delay Comments
Iteration 1 30 days 06/10/2014 05/11/2014 37 days 06/10/2014 12/11/2014 7 days Review application after acceptance. Reviewed schedule for iteration 2.
Bootstrap Module
CSV file upload 3 days 22/10/2014 24/10/2014 3 days 22/10/2014 24/10/2014 0 days NA
Convert data into GeoJSON objects 2 days 25/10/2014 26/10/2014 2 days 25/10/2014 26/10/2014 0 days NA
Geo-Visualization Module
Pin-Mapping, Tool-tip, Interactive Legend and Clustering 3 days 28/10/2014 30/10/2014 3 days 28/10/2014 30/10/2014 0 days NA
Testing and Debugging
Regression testing 1 day 31/10/2014 31/10/2014 1 day 31/10/2014 31/10/2014 0 days NA
Debugging 3 days 1/11/2014 3/11/2014 4 days 1/11/2014 4/11/2014 1 day NA
Phase 2: Technology Exploration
Task Planned Duration Planned Start Planned End Actual Duration Actual Start Actual End Delay Comments
Iteration 2 48 days 13/11/2014 31/12/2014 48 days 13/11/2014 31/12/2014 0 days Different personal schedules for every teammates as everyone was travelling. Tasks were switched to research module to explore the technologies used for this project.
Research Module
Heatmap and Chloropleth 48 days 13/11/2014 31/12/2014 48 days 13/11/2014 31/12/2014 0 days NA
Database Selection and Design 48 days 13/11/2014 31/12/2014 48 days 13/11/2014 31/12/2014 0 days NA
Charts and D3 Graphs 48 days 13/11/2014 31/12/2014 48 days 13/11/2014 31/12/2014 0 days NA
Phase 3: Wire-frames and Mockup Designs
Task Planned Duration Planned Start Planned End Actual Duration Actual Start Actual End Delay Comments
Iteration 3 21 days 01/01/2015 21/01/2015 31 days 01/01/2015 31/01/2015 10 days Increased in scope for Data-Visualization module, and stopped development to solve high impact bugs found.
Research Module
PostGIS architecture 31 days 01/01/2015 31/01/2015 31 days 01/01/2015 31/01/2015 0 days NA
Leaflet and mapping 31 days 01/01/2015 31/01/2015 31 days 01/01/2015 31/01/2015 0 days NA
Geo-Visualization Module
Search bar for postal code, district, planning area, price range, size range 3 days 06/01/2015 08/01/2015 3 days 06/01/2015 08/01/2015 0 days NA
Localized search in the map 2 days 09/01/2015 10/01/2015 2 days 09/01/2015 10/01/2015 0 days NA
Data-Visualization Module
Line Chart 4 days 06/01/2015 09/01/2015 8 days 06/01/2015 13/01/2015 4 days Stopped development and solved bug.
Histogram 3 days 14/01/2015 16/01/2015 3 days 14/01/2015 16/01/2015 0 days NA
Box Plot New task 4 days 16/01/2015 19/01/2015 0 days
Pie Chart New task 4 days 20/01/2015 23/01/2015 0 days NA
Testing and Debugging
Testing: User Experience Test at URA 1 day 28/01/2015 28/01/2015 1 day 28/01/2015 28/01/2015 0 days NA
Debugging 3 days 29/01/2015 31/01/2015 3 days 29/01/2015 31/01/2015 0 days NA
Phase 4: Architecture Designs
Task Planned Duration Planned Start Planned End Actual Duration Actual Start Actual End Delay Comments
Iteration 4 21 days 01/02/2015 21/02/2015 21 days 01/02/2015 21/02/2015 0 days NA
Geo-Processing Module
Design and develop database 2 days 01/02/2015 02/02/2015 3 days 01/02/2015 03/02/2015 1 day This belongs to scripting instead of diagram.
Converting Geo JSON to X,Y Coordinates 2 days 03/02/2015 04/02/2015 2 days 04/02/2015 05/02/2015 0 days NA
Import facility database 2 days 05/02/2015 06/02/2015 4 days 06/02/2015 09/02/2015 0 days NA
Implement geospatial joint 3 days 07/02/2015 09/02/2015 3 days 10/02/2015 12/02/2015 0 days NA
Import result into database 1 day 10/02/2015 10/02/2015 Pushed to next iteration 0 days NA
Geo-Visualization Module
Generate heatmap for accessibility index 2 days 11/02/2015 12/02/2015 Pushed to next iteration 0 days NA
Polygon selection on map with dynamic charting New Task 7 days 11/02/2015 15/02/2015 0 days NA
Data-Visualization Module
Time Series Charts with horizontal line to reflect on percentile level 2 days 07/02/2015 08/02/2015 3 days 07/02/2015 09/02/2015 0 days NA
Box plot with cross-filter 3 days 10/02/2015 12/02/2015 4 days 10/02/2015 13/02/2015 0 days NA
Dynamic charting per region interacting with map 2 days 17/02/2015 19/02/2015 2 days 17/02/2015 19/02/2015 0 days NA
Scatter plot on price vs accessibility index 3 days 14/02/2015 16/02/2015 Pushed to next iteration 0 days NA
Testing and Debugging
Testing: User Experience Test at URA 1 day 12/02/2015 12/02/2015 1 day 12/02/2015 12/02/2015 0 days NA
Debugging 4 days 13/02/2015 16/02/2015 4 days 13/02/2015 16/02/2015 0 days NA

Project Metrics

Schedule Metric

REALIS SM index.png

Bugs Metric

Bugs Index Per Iterations
REALIS Bugs index.png


Bugs Score
REALIS Bugs Score.png
Bugs Score
Phase Iteration Total Bugs Score
[1] Requirements Gathering 1 6
[2] Technology Exploration 2 0
[3] Wire-frames and Mockup Designs 3 11
[4] Architecture Designs 4 7
Iteration 1: Requirements Gathering
Error Message Impact Solutions Date of Bug Faced Time of Bug Faced Date of Bug Solved Time of Bug Solved Days for Debug
CSV file containing transaction data is loaded but could not print out JSON string due to null pointer exception. High Impact - 5 Do a thorough cleaning on CSV file to scan for null values 01/11/2014 1000 03/11/2014 1200 3
Interactive legend does not work properly as filtering by only one property types still returns results of multiple property types. Low Impact - 1 Making use of a crossfilter library, dc.js to re-code the legend part in order to achieve correct results. 03/11/2014 1400 04/11/2014 1600 2
Iteration 2: Technology Exploration
Error Message Impact Solutions Date of Bug Faced Time of Bug Faced Date of Bug Solved Time of Bug Solved Days for Debug
No bugs as this iteration consists of only research on technologies used for the project.
Iteration 3: Wire-frames and Mockup Designs
Error Message Impact Solutions Date of Bug Faced Time of Bug Faced Date of Bug Solved Time of Bug Solved Days for Debug
Line graphs disappear when using date filter High Impact - 5 Make use of a new JavaScript cross-filter helper library, reductions, to re-code the line graphs. 09/01/2015 1200 13/01/2015 0200 5
Not aware that coordinates returned by invoking OneMap API are in SVY21 projection system. Hence map points are in wrong positions. High Impact - 5 Make use of external JavaScript libraries for geo-projection conversion, called SVY21(). 09/01/2015 1000 11/01/2015 1200 3
When user keys in a search query, search function might return global results instead of Singapore results. Low Impact - 1 Make the search function localised in Singapore instead of in a global scale. 29/01/2015 1400 31/01/2015 1600 3
Iteration 4: Architecture Designs
Error Message Impact Solutions Date of Bug Faced Time of Bug Faced Date of Bug Solved Time of Bug Solved Days for Debug
Cannot retrieve the data from the PostGis database due to the mismatch of column names. High Impact - 5 Standarise the column name between the the java and javascipt files. 14/02/2015 1400 15/02/2015 1600 2
Inconsistent filter criteria when the pie chart is changed to row chart and vice-versa for the onclick event. Low Impact - 1 Apply the filter criteria to the rendering of the chart for the onclick event. 13/02/2015 0900 14/02/2015 1200 2
Polygon selection of the markers on the map does not affect the chart popup. Low Impact - 1 Change to the correct div id of the chart popup. 15/02/2015 1300 16/02/2015 1600 2

Project Risks

Preparation Phase
Risk Probability Impact Result Mitigation
Bugs in charting library High High A Look for alternative charting
Sponsors unsure of product delivery (they are unsure if analytics module is really needed) High High A Do a prototype first as a proof of concept
Coordinated linked view High High A Use filter for individual module
Stakeholder requirements not effectively communicated High High A Prepare more than what is required as a proof of concept
Using new libraries, such as D3 and leaflet Moderate Moderate B Do Research on the library prior to coding

Technical Complexity

REALIS Technical Diagram.png

Quality of Product

Intermediate Deliverables

Stage Specification Modules
Project Management Minutes Minutes
Schedule Metrics Metrics
Requirements Design Specifications Project Scope
Analysis Use case Use case Diagram
Architecture Diagram Architecture Diagram
Workflow Diagram Workflow Diagram
Design UI Mockups UI Mockups
Testing User test plan User Tests

Testing

29 January 2015 & 12 February 2015 : User Experience Test
Objective Questions Asked Feedback Solution

To gather user experience feedback on the prototype after demonstrating the application to the participants.

  1. What information presented on the tooltip is considered irrelevant to you?
  2. Which charts are redundant?
  3. Which charts are difficult to understand?
  4. Which charts are useful for your analysis?
  5. What charts do you use in your daily job?
  6. Is the layout of the application aesthetically pleasing?
  7. What do you think of the placement of the map and charts?
  8. What other features would you like to see on this application?
  9. Which feature(s) you think is/are useful but needs improvement?

3 Property Analysts and 2 IT System Analysts

  1. Too many graphs/buttons to click on. It is confusing and aesthetically unpleasing. Graphs like bar chart, line chart and pie chart are enough
  2. Selection of base maps is not required. They are good with just one layout
  3. Include search by tenant, district and properties that are nearby and comparable, size of property
  4. PDF download of data in various format
  5. Select an area to choose multiple points
  6. Need to improve on accuracy
  7. Cut down on the amount of information shown in the tool tip to 4-5 lines
  8. Change the x-axis units of the graphs to month instead of days
  9. Fixed layout for the graphs are preferable
  10. Do drop down for categories like districts etc

3 Physical Planners

  1. Good to have an option to search by postal code
  2. Improve on the accuracy in mapping postal code to lat long
  3. Too many different combinations of pictures and colors in markers which are confusing
  4. Draw a polygon on the map to select multiple markers and show the results
  5. Add in the ability to have street view. This is important to the planners
  1. Implement relevant charts based on the Property Analysts/Planners feedback.
  2. Implement a search function for postal codes, planning areas, districts, etc.
  3. Implement a drawing function for selection of multiple markers on the map.

Reflection