Difference between revisions of "IS480 Team wiki: 2014T1 One Piece Project Midterm Wiki"
Jump to navigation
Jump to search
Hphyu.2011 (talk | contribs) |
Hphyu.2011 (talk | contribs) |
||
Line 71: | Line 71: | ||
<!-- Highlight changes to modules, the completion status (implemented, user testing done, client approved, deployed, etc), the confidence level (0-1 where 0 is no confident of getting it done, 1 is 100% confident in getting it done) and comments (who has been assigned to do it, new scope, removed scoped, etc). Please use a table format to summarize with links to function details. --> | <!-- Highlight changes to modules, the completion status (implemented, user testing done, client approved, deployed, etc), the confidence level (0-1 where 0 is no confident of getting it done, 1 is 100% confident in getting it done) and comments (who has been assigned to do it, new scope, removed scoped, etc). Please use a table format to summarize with links to function details. --> | ||
− | + | = Primary = | |
{| class="wikitable" | {| class="wikitable" | ||
|- | |- | ||
Line 176: | Line 176: | ||
|} | |} | ||
+ | = Secondary = | ||
{| class="wikitable" | {| class="wikitable" | ||
Line 214: | Line 215: | ||
|- | |- | ||
|width="300"| Scale/Rotate/Zoom/3D features for text editor modules | |width="300"| Scale/Rotate/Zoom/3D features for text editor modules | ||
− | |width="240"| | + | |width="240"| Task after mid term |
|width="140" align="center"| 1 | |width="140" align="center"| 1 | ||
|width="200" align="center"| Ila | |width="200" align="center"| Ila | ||
Line 220: | Line 221: | ||
|- | |- | ||
|width="300"| Transition path feature for text editor module | |width="300"| Transition path feature for text editor module | ||
− | |width="240"| | + | |width="240"| Task after mid term |
|width="140" align="center"| 1 | |width="140" align="center"| 1 | ||
|width="200" align="center"| Ila | |width="200" align="center"| Ila | ||
Line 234: | Line 235: | ||
|width="240"| 40% | |width="240"| 40% | ||
|width="140" align="center"| 1 | |width="140" align="center"| 1 | ||
− | |width="200" align="center"| Chenguang | + | |width="200" align="center"| Chenguang & Ila |
|width="140" align="center"| | |width="140" align="center"| | ||
|- | |- | ||
Line 244: | Line 245: | ||
|- | |- | ||
|width="300"| View trainee performance statistic by different categories and combination | |width="300"| View trainee performance statistic by different categories and combination | ||
− | |width="240"| | + | |width="240"| Task after mid term |
|width="140" align="center"| | |width="140" align="center"| | ||
|width="200" align="center"| | |width="200" align="center"| | ||
Line 251: | Line 252: | ||
|} | |} | ||
+ | = Additional = | ||
{| class="wikitable" | {| class="wikitable" | ||
|- | |- | ||
Line 260: | Line 262: | ||
|- | |- | ||
|width="300"| Generate defaulted trainee overview report | |width="300"| Generate defaulted trainee overview report | ||
− | |width="240"| | + | |width="240"| Task after mid term |
− | |width="140" align="center"| | + | |width="140" align="center"| 1 |
|width="200" align="center"| | |width="200" align="center"| | ||
|width="140" align="center"| | |width="140" align="center"| |
Revision as of 18:50, 2 October 2014
BPAcademy is to enable online training
for corporate employees and increase efficiency in organizations
by ensuring compulsive learning.
Back to Home Page |
WORKING IN PROGRESS PAGE!
Project Progress Summary
Our project schedule is divided into 12 iterations.
- Till date of 2 September 2014, we have completed ...... of our project
- Five user testings have been conducted.
- Two usability testings with school mates
- One user validation testing with clients
- One functionality testing with clients
- One functionality A/B testing with school mates
- Next Iteration - Iteration 8 (2 October - 30 October)
- Midterm slides: [[Media:| Midterm Presentation Slides]]
- Deployed site link:
Notes:
Project Highlights:
- Team members are busy with other school commitments and events such as career recruitment talk, CCA responsibility and job applications.
- Text Editor and Impressify JS technical complexity is more sophisticated than expected and take way longer.
- Aniket's laptop died on 5 September. He bought a new one. (Iteration 6) Luckily, it did not seriously effect the project progress.
- MiMi's laptop died before acceptance and bought a new one. Unfortunately, her new laptop stopped functioning on 23 September (Iteration 7).
It effects the development of super admin module.
- List of major requirement changes (Suggested by client, supervisor and member)
- Optional hint feature for quiz
- Individual question weightage of the quiz
- Timer feature disabled after 24 hrs of of first quiz attempt
- Display and edit users/user groups without searching
- Schedule publish/recall
- Time stamp for quiz attempts
Project Management
Project Status:
Primary
Task/function/features, etc | Status | Confident Level(0-1) | Comment | UI Link (If Available) |
---|---|---|---|---|
Validate Access and direct to the respective platform | Deployed and tested 100% | 1 | Chenguang & Ila | |
Upload slides with Apache POI and store in the database | Deployed and tested 100% | 1 | MiMi | |
Create/Modify module details and access rights with validation. | Deployed and tested 100% | 1 | Aniket & Chenguang | |
Preview uploaded/Modified slides with Impressify | Deployed and tested 100% | 1 | Ila | |
Publish/Recall modules to/from the trainee platform | Deployed and tested 100% | 1 | Chenguang & Ila | |
CRUD of timer feature with respective slides | Deployed and tested 100% | 1 | Chenguang & Ila | |
CRUD of checkpoint feature (Learning Interactive Feature) | Tested 100% | 1 | Chenguang & Ila | |
View and delete created module/quizzes | Deployed and tested 100% | 1 | Mi Mi & Phyu Phyu | |
Search feature by multiple parameter and sorting feature by columns for Trainer homepage | Implemented and tested 100% | 1 |
|
|
CRUD of take quiz with min Pass/Fail restriction | Deployed and tested 100% | 1 | Mi Mi and Chenguang | |
Assign question weightage in create and edit quiz | Deployed and tested 100% | 1 |
|
|
View pending/completed modules and new quizzes | Deployed and tested 100% | 1 | Aniket | |
Search feature by multiple parameter and sorting feature by columns for Trainee homepage | Deployed and tested 100% | 1 | Aniket | |
Take Module feature by Trainee | Deployed and tested 100% | 1 | Aniket | Click Here |
Take/Retake quizzes online and review performance status | Deployed and tested 100% | 1 | Aniket |
Secondary
Task/function/features, etc | Status | Confident Level(0-1) | Comment | UI Link (If Available) |
---|---|---|---|---|
CRUD of user groups and single user | Deployed and tested 100% | 1 | Siddhant & Mi Mi | |
Upload .csv files to add multiple users and users group | Deployed and tested 100% | 1 | Siddhant & Mi Mi | |
Optional and Mandatory names for editing of single users | Implemented and tested 100% | 1 |
|
|
Display and edit usergroups without searching in Super Admin Module | Implemented and tested 100% | 1 |
|
|
Scale/Rotate/Zoom/3D features for text editor modules | Task after mid term | 1 | Ila | |
Transition path feature for text editor module | Task after mid term | 1 | Ila | |
Text enhancing features | Task after mid term | 1 | Ila | |
CRUD of audio/video files | 40% | 1 | Chenguang & Ila | |
Add/Edit Additional slide contents | 40% | 1 | ||
View trainee performance statistic by different categories and combination | Task after mid term |
Additional
Task/function/features, etc | Status | Confident Level(0-1) | Comment | UI Link (If Available) |
---|---|---|---|---|
Generate defaulted trainee overview report | Task after mid term | 1 |
Project Schedule (Plan Vs Actual):
Project Metrics:
Project Risks:
Technical Complexity:
Quality of product
Intermediate Deliverables:
There should be some evidence of work in progress.
Stage | Specification | Modules |
Project Management | Meeting Minutes | Client, supervisor & team meetings |
Metrics | Schedule & bug metrics (Iteration 1 - 7) | |
Requirements | Paper Prototype (Lo Fi) & Improved Prototype (Hi Fi) | Prototype |
Analysis | Use case | overall |
System Sequence Diagram | client, server | |
Business Process Diagram | Here | |
Screen Shots | CRUD Customer, Trend Analysis | |
Design | ER Diagram | 1, 2, 3 |
Class Diagram | 1, 2, 3 | |
Testing | User Testings | User test plan |
Not all parts of the deliverables are necessary but the evidence should be convincing of the progress. Try to include design deliverables that shows the quality of your project.