HeaderSIS.jpg

Difference between revisions of "IS480 Team wiki: 2014T1 One Piece Project Midterm Wiki"

From IS480
Jump to navigation Jump to search
Line 192: Line 192:
 
|-
 
|-
 
|width="300"| Upload .csv files to add multiple users and users group  
 
|width="300"| Upload .csv files to add multiple users and users group  
|width="240"| Completed 80%  
+
|width="240"| Deployed and tested 100%
 
|width="140" align="center"| 1
 
|width="140" align="center"| 1
 
|width="200" align="center"| Siddhant & Mi Mi  
 
|width="200" align="center"| Siddhant & Mi Mi  
Line 212: Line 212:
 
*New requirement by client  
 
*New requirement by client  
 
|width="140" align="center"|
 
|width="140" align="center"|
|-
 
|width="300"|
 
|width="240"|
 
|width="140" align="center"|
 
|width="200" align="center"|
 
|width="140" align="center"|
 
|-
 
|width="300"|
 
|width="240"| 
 
|width="140" align="center"|
 
|width="200" align="center"|
 
|width="140" align="center"| 
 
|-
 
|}
 
 
{| class="wikitable"
 
|-
 
!width="300"|'''Task/function/features, etc'''
 
!width="240" align="center"|'''Status'''
 
!width="140" align="center"|'''Confident Level(0-1)'''
 
!width="200" align="center"|'''Comment'''
 
!width="140" align="center"|'''UI Link (If Available)'''
 
 
|-
 
|-
 
|width="300"| Scale/Rotate/Zoom/3D features for text editor modules  
 
|width="300"| Scale/Rotate/Zoom/3D features for text editor modules  
Line 272: Line 250:
 
|-
 
|-
 
|}
 
|}
 
  
 
{| class="wikitable"
 
{| class="wikitable"
Line 283: Line 260:
 
|-
 
|-
 
|width="300"| Generate defaulted trainee overview report  
 
|width="300"| Generate defaulted trainee overview report  
|width="240"| Task after mid term
+
|width="240"|  
|width="140" align="center"| 1
+
|width="140" align="center"|  
|width="200" align="center"| Mi Mi
+
|width="200" align="center"|  
 
|width="140" align="center"|
 
|width="140" align="center"|
 
|-
 
|-

Revision as of 18:35, 2 October 2014

OnePiece Banner.jpg

BPAcademy is to enable online training
for corporate employees and increase efficiency in organizations
by ensuring compulsive learning.


Back to Home Page

WORKING IN PROGRESS PAGE!

Project Progress Summary

Our project schedule is divided into 12 iterations.

  • Till date of 2 September 2014, we have completed ...... of our project
  • Five user testings have been conducted.
    • Two usability testings with school mates
    • One user validation testing with clients
    • One functionality testing with clients
    • One functionality A/B testing with school mates
  • Next Iteration - Iteration 8 (2 October - 30 October)



  • Midterm slides: [[Media:| Midterm Presentation Slides]]
  • Deployed site link:
  Notes: 


Project Highlights:

  • Team members are busy with other school commitments and events such as career recruitment talk, CCA responsibility and job applications.
  • Text Editor and Impressify JS technical complexity is more sophisticated than expected and take way longer.
  • Aniket's laptop died on 5 September. He bought a new one. (Iteration 6) Luckily, it did not seriously effect the project progress.
  • MiMi's laptop died before acceptance and bought a new one. Unfortunately, her new laptop stopped functioning on 23 September (Iteration 7).

It effects the development of super admin module.

  • List of major requirement changes (Suggested by client, supervisor and member)
    • Optional hint feature for quiz
    • Individual question weightage of the quiz
    • Timer feature disabled after 24 hrs of of first quiz attempt
    • Display and edit users/user groups without searching
    • Schedule publish/recall
    • Time stamp for quiz attempts

Project Management

Project Status:

Task/function/features, etc Status Confident Level(0-1) Comment UI Link (If Available)
Validate Access and direct to the respective platform Deployed and tested 100% 1 Chenguang & Ila
Upload slides with Apache POI and store in the database Deployed and tested 100% 1 MiMi
Create/Modify module details and access rights with validation. Deployed and tested 100% 1 Aniket & Chenguang
Preview uploaded/Modified slides with Impressify Deployed and tested 100% 1 Ila
Publish/Recall modules to/from the trainee platform Deployed and tested 100% 1 Chenguang & Ila
CRUD of timer feature with respective slides Deployed and tested 100% 1 Chenguang & Ila
CRUD of checkpoint feature (Learning Interactive Feature) Tested 100% 1 Chenguang & Ila
View and delete created module/quizzes Deployed and tested 100% 1 Mi Mi & Phyu Phyu
Search feature by multiple parameter and sorting feature by columns for Trainer homepage Implemented and tested 100% 1
  • Aniket
  • Requested changes by client
CRUD of take quiz with min Pass/Fail restriction Deployed and tested 100% 1 Mi Mi and Chenguang
Assign question weightage in create and edit quiz Deployed and tested 100% 1
  • Phyu Phyu
  • New requirement by client
View pending/completed modules and new quizzes Deployed and tested 100% 1 Aniket
Search feature by multiple parameter and sorting feature by columns for Trainee homepage Deployed and tested 100% 1 Aniket
Take Module feature by Trainee Deployed and tested 100% 1 Aniket Click Here
Take/Retake quizzes online and review performance status Deployed and tested 100% 1 Aniket


Task/function/features, etc Status Confident Level(0-1) Comment UI Link (If Available)
CRUD of user groups and single user Deployed and tested 100% 1 Siddhant & Mi Mi
Upload .csv files to add multiple users and users group Deployed and tested 100% 1 Siddhant & Mi Mi
Optional and Mandatory names for editing of single users Implemented and tested 100% 1
  • Siddhant & Mi Mi
  • Suggested by Aniket and client has approved for changes
Display and edit usergroups without searching in Super Admin Module Implemented and tested 100% 1
  • Mi Mi & Phyu Phyu
  • New requirement by client
Scale/Rotate/Zoom/3D features for text editor modules 1 Ila
Transition path feature for text editor module 1 Ila
Text enhancing features Task after mid term 1 Ila
CRUD of audio/video files 40% 1 Chenguang and Ila
Add/Edit Additional slide contents 40% 1
View trainee performance statistic by different categories and combination
Task/function/features, etc Status Confident Level(0-1) Comment UI Link (If Available)
Generate defaulted trainee overview report

Project Schedule (Plan Vs Actual):

ActualVSplan OnePiece.jpg

Project Metrics:

Project Risks:

Technical Complexity:

Quality of product

Intermediate Deliverables:

There should be some evidence of work in progress.

Stage Specification Modules
Project Management Meeting Minutes Client, supervisor & team meetings
Metrics Schedule & bug metrics (Iteration 1 - 7)
Requirements Paper Prototype (Lo Fi) & Improved Prototype (Hi Fi) Prototype
Analysis Use case overall
System Sequence Diagram client, server
Business Process Diagram Here
Screen Shots CRUD Customer, Trend Analysis
Design ER Diagram 1, 2, 3
Class Diagram 1, 2, 3
Testing User Testings User test plan

Not all parts of the deliverables are necessary but the evidence should be convincing of the progress. Try to include design deliverables that shows the quality of your project.

Deployment:

Testing:

Reflection

Team Reflection:

Supervisor Reflection: