Metrics
Formula:
Total = 1 x num (low) + 5 x num (high) + 10 x num (critical)
*Bug Index: The sum of bug points for all the unresolved bugs in each case.
Additional Remarks: Project Manager are required to check the Bug Index continuously and ensure that bugs are resolved within the time frame.