HeaderSIS.jpg

Difference between revisions of "IS480 Team wiki: 2011T1 TheTalkies Midterm"

From IS480
Jump to navigation Jump to search
Line 204: Line 204:
 
|| Leftover from iteration #4  
 
|| Leftover from iteration #4  
 
|| 8 Sep - 13 Sep 2011  
 
|| 8 Sep - 13 Sep 2011  
|| 8 Sep - 12 Sep 2011
+
|| 8 Sep - 13 Sep 2011
 
|| Project Manager Soe Thet and the whole team were able to finish implementing features from previous iteration and Testing.
 
|| Project Manager Soe Thet and the whole team were able to finish implementing features from previous iteration and Testing.
 
|-
 
|-
Line 210: Line 210:
 
|| Tweet/ Report/ Discuss
 
|| Tweet/ Report/ Discuss
 
|| 13 Sep - 21 Sep 2011
 
|| 13 Sep - 21 Sep 2011
|| 13 Sep - 20 Sep 2011
+
|| 13 Sep - 21 Sep 2011
 
|| Aung and Phyo has finished tweet/report and discussion feature in Trend Page and LostnFound Page.
 
|| Aung and Phyo has finished tweet/report and discussion feature in Trend Page and LostnFound Page.
 
|-
 
|-
Line 217: Line 217:
 
|| SOB 3D Model
 
|| SOB 3D Model
 
|| 13 Sep - 21 Sep 2011
 
|| 13 Sep - 21 Sep 2011
|| 13 Sep - 19 Sep 2011
+
|| 13 Sep - 21 Sep 2011
 
|| Khaing was responsible to build School Of Business (SOB) model
 
|| Khaing was responsible to build School Of Business (SOB) model
 
|-
 
|-

Revision as of 15:52, 25 September 2011

Project Progress Summary

  • Between acceptance presentation(10 Aug 2011) and midterm presentation(26 Aug 2011), there were 3 iterations completed.
  • During iteration 3, our team has completed trend page in which users can see top 5 trends in SMU area. We also had completed School of Economics/School of Social Science (SESS) model.
  • During iteration 4, we have completed LostnFound page which is a kind of trending page. In this case, user can report what he has found and search what lost in school from our application, by using location key tags such as #SISL1, #SESSL2, #LIBRARYL3, etc. We also completed Library model.
  • During iteration 5, we had completed Tweet/Discuss and report function, in which both twitter user and non-twitter user can discuss, and report in Trend page and LostnFound page. In the mean time, we had completed School of Business (SOB) model.
  • We finished all the features planned for these 3 iteration at the end of iteration 5, even though, during iterations, we faced some delays and we had been behind schedule for up to a week, the cause of which will be mentioned details in Project Highlights.
  • For the time being, we are in the middle of 6th iteration. With iteration 5 finished, we have completed most of our main features, and in following iterations, we will be implementing back-end features such as statistics collection and fine-tuning of the app to increase the performance and user-friendliness of application. We are confident that our planned features for post mid-term presentation, can be done in time if all team members are putting the same efforts as they are doing right now.


Project Highlights:

Unexpected things happened along the way -

  • Germanium API was updated from 1.3 to 1.5 and our client wants us to use more updated version of API i.e. 1.5.
  • Some delay in schedule and team has put more efforts in order to catch up the schedule. The reason for that delay was mainly because almost all our team members involved in an cultural show event of one of our CCAs which was in first 3 weeks of school term. Although we anticipated some part of tight schedules beforehand, team members were busier and had to commit more effort in organizing the event than expected which led to decrease in individual as well as team efficiency. We had been behind the planned schedule for up to one week (7 days) in iteration 3. In subsequent iteration, we tried to catch up the planned schedule but the delay gap was too wide that we could not manage to be back on schedule as planned. However, we managed to narrow down the gap and the delay was reduced to 5 days which was recorded as further delay in iteration 4. Major catching up happened in iteration 5 when the event was over and the timetables for other classes were not as occupied. We maintained the momentum and the determination to complete the features in time as planned in this iteration. The better commitment from every team member allowed us to finish all the planned features for iteration 5 as well as those leftover tasks from previous iterations. Finally, after iteration 5, our team was back on track as planned in term of time.


Project Management

Provide more details about the status, schedule and the scope of the project. Describe the complexity of the project.

Project Status:

This is our team status on features listed in main wiki page.

Feature Status Confident Level (0-1) Comment
3D Model of school buildings 80% 1 Models of LKCSB, SIS, SESS and library done. SOA pending.
Timeline 90% 1 Fully functional. To add in some buttons according to new UI.
Trends 100% 1 Implemented and final.
LostnFound 90% 1 Implemented. UAT result pending.
Tweet/Discuss/Report 90% 1 Implemented. UAT result pending.
Statistic Collection and Error Logging 0% 0.9 Need to check server resources.
Friend Stream 0% 0.9 Need to research on twitter api
UI revamp 0% 1


Project Schedule (Plan Vs Actual):

Our team's project scope remains constant from the beginning to present stage. Until now, we implemented features according to plan and in iteration 6, we would be implementing Logging and Statistic function and building School Of Accountancy (SOA) model as plan. In iteration 7, we will implement UI revamp and Friend Stream function in following iteration.

Iterations Planned Actual Comments
3 (11 Aug - 24 Aug 2011) Modelling SESS 11 Aug - 19 Aug 2011 11 Aug - 22 Aug 2011 Aung and Soe Thet are responsible for building School of Social Sciences model and delay by 3 days.
Database 11 Aug - 19 Aug 2011 11 Aug - 19 Aug 2011 Thandar and Khaing come out with database structure and create database.
Server side (Trend Page) 11 Aug - 24 Aug 2011 11 Aug - 31 Aug 2011 Phyo and Thandar faced unexpected difficulties such as learning cron job, changing database structure to update trend keywords.
Client Side (Trend Page) 20 Aug - 24 Aug 2011 11 Aug - 29 Aug 2011 Soe Thet and Khaing need to wait for server side since there is delay in server side.
Germanium (Trend Page) 11 Aug - 24 Aug 2011 11 Aug - 31 Aug 2011 Moe Hein and Aung implement codes to connect the 3D model and the trend page accordingly.
Mock Up 11 Aug - 24 Aug 2011 11 Aug - 24 Aug 2011 Moe Hein and Aung create full mock up pages for wireframing as Sponsor requested.
Test Plan 11 Aug - 17 Aug 2011 11 Aug - 17 Aug 2011 Khaing and Aung create test plan for unit testing.
Misc 11 Aug - 24 Aug 2011 11 Aug - 24 Aug 2011 Khaing and Aung improve wiki based on the Acceptance Presentation Feedback.
4 (25 Aug - 7 Sep 2011) Leftover from iteration #3 25 Aug - 31 Aug 2011 25 Aug - 1 Sep 2011 Project Manager Soe Thet and the whole team were busy with Myanmar Festival Gala on 3rd September and so we delayed further
Server Side (Trend Page) 31 Aug - 7 Sep 2011 1 Sep - 9 Sep 2011 Phyo and Soe Thet finalize server side coding, test cron job and results
Client side (Lost and Found)
  • Filter by time and school
31 Aug - 7 Sep 2011 1 Sep - 10 Sep 2011 Aung and Soe Thet implement time filter in Lost and Found page based on Trend feature
3D Model of Library 31 Aug - 7 Sep 2011 1 Sep - 11 Sep 2011 Khaing and Aung was responsible to draw Library Model
Germanium
  • Port to API 1.5 from 1.3
  • BBL Object
  • Accordion Effect
31 Aug - 7 Sep 2011 1 Sep - 11 Sep 2011 Because of Germanium API changes, Moe Hein and Thandar adjust current codes as well as implement Accordion Effect in BBL Tree Object.
5 (8 Sep - 21 Sep 2011) Leftover from iteration #4 8 Sep - 13 Sep 2011 8 Sep - 13 Sep 2011 Project Manager Soe Thet and the whole team were able to finish implementing features from previous iteration and Testing.
Tweet/ Report/ Discuss 13 Sep - 21 Sep 2011 13 Sep - 21 Sep 2011 Aung and Phyo has finished tweet/report and discussion feature in Trend Page and LostnFound Page.
SOB 3D Model 13 Sep - 21 Sep 2011 13 Sep - 21 Sep 2011 Khaing was responsible to build School Of Business (SOB) model
Germanium (Level, Placemark Position) 13 Sep - 21 Sep 2011 13 Sep - 21 Sep 2011 Thandar set placemark position on Campus Ground and Level according to position #(hash tag).
UI Improvement 13 Sep - 21 Sep 2011 13 Sep - 21 Sep 2011 Moe Hein was responsible for User interface improvement and design changes for UAT1 and Mid-term presentation.


Project Metrics:

Summary of analysis for the metrics collected. You may refer to another page for the details about the metrics and how it is collected. [To be done later]


Project Risks:

No Risk Likelihood of Occurrence Impact on Project Mitigation Strategy
1. Schedule Risk
1.1 Underestimation of the time taken for a task Low (Previously Medium ) High
  • Burn Midnight oil
  • Get Help from the rest of the team members
2. Technical Risk
2.1 Unfamiliarity with twitter and Germanium APIs Low (Previously Medium) Low (Previously Medium)
  • Share information and technical skills with each others
2.2 Integration difficulties with Germanium and twitter (Placemarks) Low (Previously Medium) Low (Previously High)
  • Brainstorm together as a team
3. Performance Risk
3.1 Performance slowing down due to 3D loading and delays in thread pulling from twitter High Medium
  • Team plan to increase the site performance during iteration 7 and 8.
3.2 Twitter server downtimer Medium High
  • Has developed in a way that even the twitter server is down, the site will be running only showing 3D Models


Technical Complexity:

Describe and list the technical complexity of your project in order of highest complexity first.

Twitter can show the live updates with time. Germanium API enables web browsers to load the 3D models with Germanium plugin.

We need to build an application which has the following core features:

  • no fresh
  • dynamic placemark
  • real time update
  • categorising tweets with locations
  • getting trends different from twitter trends

Looping :D

Quality of product

To provide flexibility and maintainability to our application, we planned to have a properties file in which we can modify different configurations of the application without having to look into codes.

Intermediate Deliverables:

Stage Specification Modules
Project Management Minutes Sponsor weeks - 2, 4, 6

Supervisor weeks - 2, 4, 6

Metrics Bug metrics
Features List, Planned Schedule and Actual Schedule Use Cases and Schedules
Requirements Wireframe Wireframe
Testing UAT 1 test plan and test cases UAT 1 Test Plan


Deployment

Our application can be accessed at http://3dsocializer.phpfogapp.com/


Testing:

The First UAT (24-25 Sept)

User Profile

Total Number of UAT Tester

21

Tester Category

Frequent Twitter User

14

Non-Twitter User

7

UAT Survey Results

Reflection

In this section, describe what have the team learn? Be brief. Sometimes, the client writes a report to feedback on the system; this sponsor report can be included or linked from here.

Team Reflection:

Any training and lesson learn? What are the take-away so far? It would be very convincing if the knowledge is share at the wiki knowledge base and linked here.

Benjamin Gan Reflection:

You may include individual reflection if that make sense at this point. The team is uncooperative and did not follow my instructions.