HeaderSIS.jpg

Difference between revisions of "2010T2 B.I. JOE : Final Presentation"

From IS480
Jump to navigation Jump to search
Line 2: Line 2:
 
After Mid Term Presentation, reviews various stakeholders were collated and reviewed within the team. Improvements and changes were made to different portions of the system. Towards the end of the development, a series of User Acceptance Tests were conducted. The purpose is to ensure the system is fully functional ready for deployment and handing over to the client. At the same time, we would make use of this opportunity to further enhance the user interface design of the application.
 
After Mid Term Presentation, reviews various stakeholders were collated and reviewed within the team. Improvements and changes were made to different portions of the system. Towards the end of the development, a series of User Acceptance Tests were conducted. The purpose is to ensure the system is fully functional ready for deployment and handing over to the client. At the same time, we would make use of this opportunity to further enhance the user interface design of the application.
 
===<div style="background: #b8ffef; padding: 12px; font-weight: bold"><font color="black" size="4" face="hobo std">Project Highlights</font></div>===
 
===<div style="background: #b8ffef; padding: 12px; font-weight: bold"><font color="black" size="4" face="hobo std">Project Highlights</font></div>===
 +
[[Image:Bijoe-jessica.jpg|900px|center]]
 +
 
===<div style="background: #b8ffef; padding: 12px; font-weight: bold"><font color="black" size="4" face="hobo std">Project Challenges</font></div>===
 
===<div style="background: #b8ffef; padding: 12px; font-weight: bold"><font color="black" size="4" face="hobo std">Project Challenges</font></div>===
 
===<div style="background: #b8ffef; padding: 12px; font-weight: bold"><font color="black" size="4" face="hobo std">Project Achievements</font></div>===
 
===<div style="background: #b8ffef; padding: 12px; font-weight: bold"><font color="black" size="4" face="hobo std">Project Achievements</font></div>===

Revision as of 22:46, 11 April 2011

Project Progress Summary

After Mid Term Presentation, reviews various stakeholders were collated and reviewed within the team. Improvements and changes were made to different portions of the system. Towards the end of the development, a series of User Acceptance Tests were conducted. The purpose is to ensure the system is fully functional ready for deployment and handing over to the client. At the same time, we would make use of this opportunity to further enhance the user interface design of the application.

Project Highlights

Bijoe-jessica.jpg

Project Challenges

Project Achievements

Project Management

Project Scheduled (Actual vs Planned)

Project Metrics

Project/Technical Complexity

Quality of Project

Project Deliverables

Quality

Deployment

Testing

Reflection

Team Reflection

Individual Reflection

Sim Sing Hong

Isaac Lim

Ng Wei Quan

Tan Ying Da

Marcus Yap

Client's Comment