Understanding Data

In order to understand the structure of OPMS and ODD data sets, we acquired OPMS and ODD fields definition files from our client. However, we found several issues from the definition files provided, which are listed as following:
 1. certain variables are not being defined;
 2. some variables have different names;
 3. all data fields have no indicated data types.

As such, we decided to load sample data of OPMS and ODD into SAS Enterprise Guide to help us understand the metadata.

We do column summary (e.g. one way frequency) for each field and record the data format. Then we consolidate all information to build data definition files for each data set.

ANLY482AY2017-18T2Group14owf1.png


Data Preparation


Unify ODD Data Format

There are 2 separate data format present in the provided ODD Data.

ANLY482AY2017-18T2Group14unifydataformat1.png
Fig. 1



Our client explained that the difference in formatting was due to the update of the database system. It started to record more variables after 9th of September in 2016.
Although Format 2 is just an extension of Format 1, and the client has clarified with us to use Format 2 as a base for the data fields. The team has encountered a mismatch between column “Account Used” in Format 1 and “ShipperAccount” in Format 2 which contain the same information.
In our cleaning of the ODD Data before inserting into the database, this mismatch must be handled and taken into consideration. Because this data files are scattered across different files, the team consolidated the various data files into 1 or 2 main files to be used for importing into the database.
Because of the 2 formats used, our first step is to consolidate data rows across a single format into a single file. This can be done using JMP’s Concatenate function, which combine rows across different sources.

ANLY482AY2017-18T2Group14Consolidate.png
Fig. 2



Also, since there is no clear date time columns that separate the rows in the ODD data into the different months in the file. The team has decided to add in a new column “RecordMonth” (Format: YYYYMM) to help us better identify the Month-Year/Data File which the record originated from.



Data Exploration and Visualization


Visualization

We have also provided a visualisation of Output 0 in both a Pie Chart and a Tree Map, as shown below. The visualisation comes with a hierarchical view where it can be freely drilled up and down according to the user’s wishes.

ANLY482AY2017-18T2Group14EDA1.png
Fig. 1


ANLY482AY2017-18T2Group14EDA2.png
Fig. 2


We have provided a visualization of Output 1 in both a Pie Chart and a stacked Bar Chart, as shown below.

ANLY482AY2017-18T2Group14EDA3.png
Fig. 3


ANLY482AY2017-18T2Group14EDA4.png
Fig. 4



Challenges


1. Unfamiliarity of MSSQL and Power BI: Prior to this project, we don’t have any prior experience on these tools, Thus, at the beginning of the project, we invested plenty of time in learning and familaring these tools.
2. Lack of domain knowledge: Domain knowledge is essential in understanding the dataset given, due to the incomplete data definition, we spent a lot of time figuring out the meaning of data, consolidating and documenting the data dictionary.
3. Communicate with users have non-IT background: We found it is challenging to communicate with users that have limited IT background. Our project sponsor is from operation management. Thus, when we explain some technical complexity to project sponsor, we need to put it into simple and plain words.
4. Data inconsistency (inconsistent data type, data columns, data values): Data collected from the project sponsor is stored in different places with different formats. Besides, the variable type and variable values are highly inconsistent.


Limitations

1. Existing excel report format is not replicable for ODD 2016 data, as some columns used to produce report are missing in 2016, such as, BU/AH, hasRDcp

ANLY482AY2017-18T2Group14limitation.png
Fig. 1-1



2. The maximum data processing capacity of Power BI is 10 GB, the size of the two-year data is about 28 GB, which is much larger than the limitation.


Next Phase


In the next sprint, we will be continuously working on the excel report output0 to output3. As requested by project sponsor, we will keep the origin format for the management team and at the same time, polish origin report to make it more interactive. We aim to finish this by 15 Mar 2018.

Also, we will start working on insight discovery and identifying possible Insights from the data to recommend to management.