SMT201 AY2019-20T1 EX2 Charmine Foo Zhi Min

From Geospatial Analytics for Urban Planning
Revision as of 15:46, 10 November 2019 by Charminefoo.2018 (talk | contribs)
Jump to navigation Jump to search
Logo.png

TAKE HOME EXERCISE REPORT

Data Sets

  1. Master Plan 2014 Subzone Boundary from URA.

https://data.gov.sg/dataset/master-plan-2014-subzone-boundary-no-sea

  1. Roads, Buildings and Natural Features data from OpenStreetMap (OSM) data sets.

https://download.bbbike.org/osm/bbbike/Singapore/Contents

  1. ASTER Global Digital Elevation Model (GDEM) dataset jointly prepared by NASA and METI, Japan.

https://search.earthdata.nasa.gov/search?m=-7.175!25.59375!1!1!0!0%2C2

Part One: Gombak in 4 Views

  1. Gombak & Target Roads
  2. Gombak & Buildings
  3. Gombak & Target Natural Features
  4. Gombak & Digital Elevation
Combined 1.png

Decision Factors: Economic factor: The selected site should avoid steep slope. This is because construction at steep slope tends to involve a lot of cut-and-fill and will lend to relatively higher development cost. Accessibility factor: The selected site should be close to existing local roads, namely: service roads and tracks. This is to ensure easy transportation of building materials during the construction stage. Health risk factor: The selected site should be away from population i.e. housing areas and offices in order to avoid disease spreading to the nearby population. Natural conservation factor: The selected site should be away from forested land, park and water.

a short description of not more than 100 words for each view.

Part Two: Gombak in 4 Views (Proximity)

  1. Gombak & Proxmity to Target Roads
  2. Gombak & Proximity to Buildings
  3. Gombak & Proximity to Target Natural Features
  4. Gombak & Slope
Combined 2.png

a short description of not more than 150 words for each view.

Part Three: Gombak in 4 Views (Criterion Scores)

A map layout with four views showing the criterion scores of each factor layers and a short description of not more than 150 words for each view.

Combined 3 new.png

Part Four: AHP Matrix And Result Report

An Analytical Hierarchical Process input matrix and result report and a short description of not more than 150 words discussing the analysis results.

Part Five: Gombak Map Layout With The Suitability Land Lot(s)

A map layout with the suitability land lot(s) and a short description of not more than 200 words commenting on each of the suitable land lot identified.