SMT201 AY2019-20T1 EX2 Charmine Foo Zhi Min
Contents
Part One: Gombak in 4 Views
- Gombak & Target Roads
- Gombak & Buildings
- Gombak & Target Natural Features
- Gombak & Digital Elevation
Decision Factors: Economic factor: The selected site should avoid steep slope. This is because construction at steep slope tends to involve a lot of cut-and-fill and will lend to relatively higher development cost. Accessibility factor: The selected site should be close to existing local roads, namely: service roads and tracks. This is to ensure easy transportation of building materials during the construction stage. Health risk factor: The selected site should be away from population i.e. housing areas and offices in order to avoid disease spreading to the nearby population. Natural conservation factor: The selected site should be away from forested land, park and water.
a short description of not more than 100 words for each view.
Study Areas in 4 Views (Proximity)
A map layout with four views showing: the study area and proximity to target roads layer, the study area and proximity to buildings layer, the study area and proximity to target natural features layer, the study area and slope layer, and a short description of not more than 150 words for each view.
Map Layout With Criterion Scores
A map layout with four views showing the criterion scores of each factor layers and a short description of not more than 150 words for each view.
AHP Matrix And Result Report
An Analytical Hierarchical Process input matrix and result report and a short description of not more than 150 words discussing the analysis results.
Map Layout With The Suitability Land Lot(s)
A map layout with the suitability land lot(s) and a short description of not more than 200 words commenting on each of the suitable land lot identified.