== <font face="Lato Black">Part One: Gombak in 4 Views</font> ==
 
== <font face="Lato Black">Part One: Gombak in 4 Views</font> ==
  
# <font face="Helvetica">Gombak & Target Roads</font>  
+
=== <font face="Lato Black">Study Area: Gombak</font> ===
# <font face="Helvetica">Gombak & Buildings</font>
+
For the purpose of this exercise, the '''Gombak Planning Subzone''' is extracted from the [https://data.gov.sg/dataset/master-plan-2014-subzone-boundary-no-sea Master Plan 2014 Subzone Boundary from URA] which consists of polygon featuring all the planning subzone data of Singapore. In order to do so, the “Select Features by Expression” is used on QGIS.
# <font face="Helvetica">Gombak & Target Natural Features</font>
+
 
# <font face="Helvetica">Gombak & Digital Elevation</font>
 
  
 
[[File:Combined 1.png|900px|frameless|center]]  
 
[[File:Combined 1.png|900px|frameless|center]]  
  
Decision Factors:
 
Economic factor: The selected site should avoid steep slope. This is because construction at steep slope tends to involve a lot of
 
cut-and-fill and will lend to relatively higher development cost.
 
Accessibility factor: The selected site should be close to existing local roads, namely: service roads and tracks. This is to ensure
 
easy transportation of building materials during the construction stage.
 
Health risk factor: The selected site should be away from population i.e. housing areas and offices in order to avoid disease
 
spreading to the nearby population.
 
Natural conservation factor: The selected site should be away from forested land, park and water.
 
 
a short description of not more than 100 words for each view.
 
  
 
== <font face="Lato Black">Part Two: Gombak in 4 Views (Proximity)</font> ==
 
== <font face="Lato Black">Part Two: Gombak in 4 Views (Proximity)</font> ==

Revision as of 16:12, 10 November 2019

Logo.png

TAKE HOME EXERCISE REPORT

The Task

In this exercise, you are tasked to identify a location suitable for building a National Communicable Disease Quarantine Centre. The selected site must be located at Gombak planning subzone, with a contiguous area of at least 10,000m2 and it must meet the following decision factors:

  1. Economic Factor: The selected site should avoid steep slope. This is because construction at steep slope tends to involve a lot of cut-and-fill and will lend to relatively higher development cost.
  2. Accessibility Factor: The selected site should be close to existing local roads, namely: service roads and tracks. This is to ensure easy transportation of building materials during the construction stage.
  3. Health Risk Factor: The selected site should be away from population i.e. housing areas and offices in order to avoid disease spreading to the nearby population.
  4. Natural Conservation Factor: The selected site should be away from forested land, park and water.

Data Sets

  1. Master Plan 2014 Subzone Boundary from URA.
  2. Roads, Buildings and Natural Features data from OpenStreetMap (OSM) data sets.
  3. ASTER Global Digital Elevation Model (GDEM) dataset jointly prepared by NASA and METI, Japan.
  4. Excel-based AHP library - AHP Template provided by SCB Associates

Part One: Gombak in 4 Views

Study Area: Gombak

For the purpose of this exercise, the Gombak Planning Subzone is extracted from the Master Plan 2014 Subzone Boundary from URA which consists of polygon featuring all the planning subzone data of Singapore. In order to do so, the “Select Features by Expression” is used on QGIS.


Combined 1.png


Part Two: Gombak in 4 Views (Proximity)

  1. Gombak & Proxmity to Target Roads
  2. Gombak & Proximity to Buildings
  3. Gombak & Proximity to Target Natural Features
  4. Gombak & Slope
Combined 2.png

a short description of not more than 150 words for each view.

Part Three: Gombak in 4 Views (Criterion Scores)

A map layout with four views showing the criterion scores of each factor layers and a short description of not more than 150 words for each view.

Combined 3 new.png

Part Four: AHP Matrix And Result Report

An Analytical Hierarchical Process input matrix and result report and a short description of not more than 150 words discussing the analysis results.

Part Five: Gombak Map Layout With The Suitability Land Lot(s)

A map layout with the suitability land lot(s) and a short description of not more than 200 words commenting on each of the suitable land lot identified.