Difference between revisions of "SMT201 AY2019-20G1 EX2 Tan Kin Meng"

From Geospatial Analytics for Urban Planning
Jump to navigation Jump to search
Line 16: Line 16:
  
 
=== Target roads ===
 
=== Target roads ===
Description
+
For the target roads layer, we are tasked to analyse only service roads and track. Hence, I extracted the service and track layers and clip them with the Bukit Gombak study area, already extracted, to create the layer for target roads. As evident from the map, service road networks are more extensive in the North Eastern parts of Bukit Gombak.
 +
 
 
=== Buildings ===
 
=== Buildings ===
Description
+
For the buildings layer, there are only a few types of buildings in the area and they are namely garage, construction sites, residential areas and public institutions. However, there are many buildings that are categorized under “Others” and by using the Open Street Map view, I can identify that some of these land uses are used by the military. This is relevant for the analysis later as we need to be aware that we might be building the quarantine area in the military camp.
 +
 
 
=== Target Natural Features ===
 
=== Target Natural Features ===
Description
+
For targeted natural features, I simply extracted the selected areas by clipping to the study area Bukit Gombak.
 +
 
 
=== Digital Elevation ===
 
=== Digital Elevation ===
Description
+
For the digital elevation layer, it was created by extracting the ASTER Global Digital Elevation Model (GDEM) dataset jointly prepared by NASA and METI, Japan according to the study area Bukit Gombak. After which, I used singleband grey for band rendering to show the elevation of Bukit Gombak. The map shows that the elevation increases gradually from north to the south of Bukit Gombak and peaks in Bukit Panjang camp as seen in the Open Street Map (OSM)
  
 
== Proximity and slope ==
 
== Proximity and slope ==

Revision as of 16:08, 10 November 2019

Contents

Objective: Identify a location suitable for building a national Communicable Disease Quarantine Centre in Bukit Gombak (Singapore)

The selected site must be located at Gombak planning subzone, with a contiguous area of at least 10,000m2 and it must meet the following decision factors:

  • Economic factor: The selected site should avoid steep slope. This is because construction at steep slope tends to involve a lot of cut-and-fill and will lend to relatively higher development cost.
  • Accessibility factor: The selected site should be close to existing local roads, namely: service roads and tracks. This is to ensure easy transportation of building materials during the construction stage.
  • Health risk factor: The selected site should be away from population i.e. housing areas and offices in order to avoid disease spreading to the nearby population.
  • Natural conservation factor: The selected site should be away from forested land, park and water.


Target roads, Buildings, Target Natural Features and Digital Elevation

Initial findings

A short description of not more than 100 words for each view.

Target roads

For the target roads layer, we are tasked to analyse only service roads and track. Hence, I extracted the service and track layers and clip them with the Bukit Gombak study area, already extracted, to create the layer for target roads. As evident from the map, service road networks are more extensive in the North Eastern parts of Bukit Gombak.

Buildings

For the buildings layer, there are only a few types of buildings in the area and they are namely garage, construction sites, residential areas and public institutions. However, there are many buildings that are categorized under “Others” and by using the Open Street Map view, I can identify that some of these land uses are used by the military. This is relevant for the analysis later as we need to be aware that we might be building the quarantine area in the military camp.

Target Natural Features

For targeted natural features, I simply extracted the selected areas by clipping to the study area Bukit Gombak.

Digital Elevation

For the digital elevation layer, it was created by extracting the ASTER Global Digital Elevation Model (GDEM) dataset jointly prepared by NASA and METI, Japan according to the study area Bukit Gombak. After which, I used singleband grey for band rendering to show the elevation of Bukit Gombak. The map shows that the elevation increases gradually from north to the south of Bukit Gombak and peaks in Bukit Panjang camp as seen in the Open Street Map (OSM)

Proximity and slope

Proximity and Slope

A short description of not more than 150 words for each view.

Proximity to target roads layer

Description

Proximity to buildings layer

Description

Proximity to target natural features layer

Description

The study area and slope layer

Description

A map layout with four views showing the criterion scores of each factor layers and a short description of not more than 150 words for each view

Criterion scores

Economic factor: The selected site should avoid steep slope. This is because construction at steep slope tends to involve a lot of cut-and-fill and will lend to relatively higher development cost

Accessibility factor: The selected site should be close to existing local roads, namely: service roads and tracks. This is to ensure easy transportation of building materials during the construction stage

Health risk factor: The selected site should be away from population i.e. housing areas and offices in order to avoid disease spreading to the nearby population

Natural conservation factor: The selected site should be away from forested land, park and water

Analytical Hierarchical Process (AHP) analysis

An Analytical Hierarchical Process input matrix and result report and a short description of not more than 150 words discussing the analysis results.

AHP analysis on map


Analytical Hierarchical Process input matrix

AHP matrix and calculations


Suitability land lot

A map layout with the suitability land lot(s) and a short description of not more than 200 words commenting on each of the suitable land lot identified.

Land Lot Suitability Assessment

AHP matrix and calculations

Area of land Identified

AHP matrix and calculations


Fulfilling the criterion of a minimum of a contiguous land area of 10000m²

Area of land