Difference between revisions of "SMT201 AY2019-20T1 EX2 Charmine Foo Zhi Min"

From Geospatial Analytics for Urban Planning
Jump to navigation Jump to search
Line 39: Line 39:
 
a short description of not more than 150 words for each view.   
 
a short description of not more than 150 words for each view.   
  
=== Map Layout With Criterion Scores ===
+
== <font face="Lato Black">Part Three: Gombak in 4 Views (Criterion Scores)</font> ==
 
A map layout with four views showing the criterion scores of each factor layers and a short description of not more than 150 words for each view.
 
A map layout with four views showing the criterion scores of each factor layers and a short description of not more than 150 words for each view.
 
[[File:Combined 3 new.png|900px|frameless|center]]   
 
[[File:Combined 3 new.png|900px|frameless|center]]   
  
=== AHP Matrix And Result Report ===
+
== <font face="Lato Black">Part Four: AHP Matrix And Result Report</font> ==
 +
 
 
An Analytical Hierarchical Process input matrix and result report and a short description of not more than 150 words discussing the analysis results.
 
An Analytical Hierarchical Process input matrix and result report and a short description of not more than 150 words discussing the analysis results.
  
=== Map Layout With The Suitability Land Lot(s) ===
+
== <font face="Lato Black">Part Five: Gombak Map Layout With The Suitability Land Lot(s)</font> ==
 +
 
 
A map layout with the suitability land lot(s) and a short description of not more than 200 words commenting on each of the suitable land lot identified.
 
A map layout with the suitability land lot(s) and a short description of not more than 200 words commenting on each of the suitable land lot identified.

Revision as of 15:40, 10 November 2019

Logo.png

TAKE HOME EXERCISE REPORT


Part One: Gombak in 4 Views

  1. Gombak & Target Roads
  2. Gombak & Buildings
  3. Gombak & Target Natural Features
  4. Gombak & Digital Elevation
Combined 1.png

Decision Factors: Economic factor: The selected site should avoid steep slope. This is because construction at steep slope tends to involve a lot of cut-and-fill and will lend to relatively higher development cost. Accessibility factor: The selected site should be close to existing local roads, namely: service roads and tracks. This is to ensure easy transportation of building materials during the construction stage. Health risk factor: The selected site should be away from population i.e. housing areas and offices in order to avoid disease spreading to the nearby population. Natural conservation factor: The selected site should be away from forested land, park and water.

a short description of not more than 100 words for each view.

Part Two: Gombak in 4 Views (Proximity)

  1. Gombak & Proxmity to Target Roads
  2. Gombak & Proximity to Buildings
  3. Gombak & Proximity to Target Natural Features
  4. Gombak & Slope
Combined 2.png

a short description of not more than 150 words for each view.

Part Three: Gombak in 4 Views (Criterion Scores)

A map layout with four views showing the criterion scores of each factor layers and a short description of not more than 150 words for each view.

Combined 3 new.png

Part Four: AHP Matrix And Result Report

An Analytical Hierarchical Process input matrix and result report and a short description of not more than 150 words discussing the analysis results.

Part Five: Gombak Map Layout With The Suitability Land Lot(s)

A map layout with the suitability land lot(s) and a short description of not more than 200 words commenting on each of the suitable land lot identified.