Difference between revisions of "SMT201 AY2019-20G1 Ex2 Yiap Mei Lin Andrea"
Jump to navigation
Jump to search
Line 54: | Line 54: | ||
== Part 4: Suitability Land Lot(s) == | == Part 4: Suitability Land Lot(s) == | ||
+ | <br> [[File:Finalz.jpg|900px|center]] <br> |
Revision as of 15:36, 9 November 2019
Contents
Part 1: Map layouts of Gombak planning subzone
with target roads
with buildings
For buildings, I grouped these as offices
- "Bukit Panjang Khek Community Guild"
- "Galisian Family Service Centre",
- "Lee Huat Motor Co" and
- "Econ Medicare Centre"
with target natural features
with digital elevation
Target roads layer proximity
Buildings layer proximity
Target natural features layer proximity
with slope layer
Part 2: Criterion scores of each factor layers
Economic Factor
Accessibility Factor
Health risk Factor
Natural conservation Factor
Part 3: Analytical Hierarchical Process input matrix and result report
From the result, it shows that the consistency index is within the acceptable range of 10% or less. According to the percentage output, this is how I view which has the most importance (the higher, the more important):
- Health Risk
- Accessibility
- Economic
- Natural conservation
Part 4: Suitability Land Lot(s)