+ | == <font face="Lato Black">The Task</font> == | ||
+ | In this exercise, you are tasked to identify a location suitable for building a National Communicable Disease Quarantine Centre. The selected site must be located at Gombak planning subzone, with a contiguous area of at least 10,000m2 and it must meet the following decision factors: | ||
+ | |||
+ | # '''Economic Factor:''' The selected site should avoid steep slope. This is because construction at steep slope tends to involve a lot of cut-and-fill and will lend to relatively higher development cost. <br /> | ||
+ | # '''Accessibility Factor:''' The selected site should be close to existing local roads, namely: service roads and tracks. This is to ensure easy transportation of building materials during the construction stage. <br /> | ||
+ | # '''Health Risk Factor:''' The selected site should be away from population i.e. housing areas and offices in order to avoid disease spreading to the nearby population. <br /> | ||
+ | # '''Natural Conservation Factor:''' The selected site should be away from forested land, park and water. | ||
== <font face="Lato Black">Data Sets</font> == | == <font face="Lato Black">Data Sets</font> == |
Revision as of 15:59, 10 November 2019
Contents
The Task
In this exercise, you are tasked to identify a location suitable for building a National Communicable Disease Quarantine Centre. The selected site must be located at Gombak planning subzone, with a contiguous area of at least 10,000m2 and it must meet the following decision factors:
- Economic Factor: The selected site should avoid steep slope. This is because construction at steep slope tends to involve a lot of cut-and-fill and will lend to relatively higher development cost.
- Accessibility Factor: The selected site should be close to existing local roads, namely: service roads and tracks. This is to ensure easy transportation of building materials during the construction stage.
- Health Risk Factor: The selected site should be away from population i.e. housing areas and offices in order to avoid disease spreading to the nearby population.
- Natural Conservation Factor: The selected site should be away from forested land, park and water.
Data Sets
- Master Plan 2014 Subzone Boundary from URA.
- Roads, Buildings and Natural Features data from OpenStreetMap (OSM) data sets.
- ASTER Global Digital Elevation Model (GDEM) dataset jointly prepared by NASA and METI, Japan.
- Excel-based AHP library - AHP Template provided by SCB Associates
Part One: Gombak in 4 Views
- Gombak & Target Roads
- Gombak & Buildings
- Gombak & Target Natural Features
- Gombak & Digital Elevation
Decision Factors: Economic factor: The selected site should avoid steep slope. This is because construction at steep slope tends to involve a lot of cut-and-fill and will lend to relatively higher development cost. Accessibility factor: The selected site should be close to existing local roads, namely: service roads and tracks. This is to ensure easy transportation of building materials during the construction stage. Health risk factor: The selected site should be away from population i.e. housing areas and offices in order to avoid disease spreading to the nearby population. Natural conservation factor: The selected site should be away from forested land, park and water.
a short description of not more than 100 words for each view.
Part Two: Gombak in 4 Views (Proximity)
- Gombak & Proxmity to Target Roads
- Gombak & Proximity to Buildings
- Gombak & Proximity to Target Natural Features
- Gombak & Slope
a short description of not more than 150 words for each view.
Part Three: Gombak in 4 Views (Criterion Scores)
A map layout with four views showing the criterion scores of each factor layers and a short description of not more than 150 words for each view.
Part Four: AHP Matrix And Result Report
An Analytical Hierarchical Process input matrix and result report and a short description of not more than 150 words discussing the analysis results.
Part Five: Gombak Map Layout With The Suitability Land Lot(s)
A map layout with the suitability land lot(s) and a short description of not more than 200 words commenting on each of the suitable land lot identified.