− | * | + | *'''Communication''': Regardless of whatever tasks we have been assigned with, I realized that it is of utmost importance for us to communicate amongst one another. On paper, the tasks may cover different aspects of the entire project (coding, designing, testing, documenting etc.) but underneath it all, these are all intricately linked. Without a doubt, we can all still carry out our tasks. However, without constant communication, we may be putting ourselves at a disadvantage instead as we could potentially waste time re-aligning our tasks towards the same deliverables.<br><br> |
− | * | + | |
+ | *'''Only questions which are not asked, are dumb questions''': Whenever you realize you have doubts that require clarifications, get the answers immediately. Questions that are never asked will never be answered. Especially with a tight schedule to be followed, it is necessary for us to keep asking questions in order to stay on the same page constantly, not leaving any one behind. | ||
|- style="background:#02507c; color:white" | |- style="background:#02507c; color:white" |
Revision as of 21:03, 2 October 2012
Contents
Project Progress Summary
You can find our Mid-term presentation slides here
Summary Overview
Team Optimus was formed on 1st of May 2012. Since 13th June 2011, we have gone through 9 Sprints.
In our first 4 Sprints, the team placed much emphasis on the analysis and requirements(functional & non-functional) gathering for our Scorecard project, defining the starting situation, project objectives and scope. It was also crucial that we understood and were familiar with our Client's Infrastructure, Framework and meet their application development standards.
During the past 3 months, our team accomplished the following:
- Picked up Enterprise JavaBeans (EJB), a component-based architecture for developing, deploying, and managing our client's application in a production environment.
- Converting my sql into JPA annotations, understanding the JPA query structure and performing queries using JPQL and JPA
- Designed and planned the blueprint for our Scorecard dashboard
- Responsible for the Initialization, Analysis, Design, Development , Test and Roll out of a RM Qualitative Scorecard that integrates onto the bank's existing platform
- Organizing primary and secondary requirement gathering with Business Development, documenting detailed business requirements, conducting walkthroughs with technology leads and system analysts, designing test scenarios aligned with the bank's standards for testing and planning and managing the upcoming User Test which will involve RMs
- Project based role requiring high degree of interaction with various internal departments and management (Business Development, Development, Business Technology, Delivery Management and Project Portfolio Office
- Developed and Integrated a working application with 60% of the functionalities which are built from scratch leveraging off Liferay Technology
The team is confident of completing the project by Finals
Project Highlights
Value of this project
1 | Eliminate manual workflow |
| |
2 | Enhance Workbench system & save development costs |
| |
3 | Increased security & tighter access rights control |
|
What unexpected events occurred?
- Took 4 weeks to be familiarized with [EJB]
- Took 2 weeks to be familiarized with the Liferay technology(an open sourced collaboration technology)
- Took 3 weeks to learn and convert all MySql Queries to pure [JPA code] (Adhering to Bank's standards)
- Took 3 weeks to Setup and replicate Bank's development Environment (Software and all required plugins) on our machines
- Integration onto the Bank's environment was more complex than expected
- Adhering to the stringent testing procedures / standards of the bank was extremely thorough but time consuming
- Team member dropped laptop, thereafter computer crashed unexpectedly, losing work
- Team member's upgraded RAM was incompatible causing crashes
Intermediate Deliverables
Stage | Specification | Modules |
Project Management | Minutes | Minutes Repository |
Metrics | Bug metrics | |
Requirements | Story cards | [View Excel Files Status][Upload Excel Files][Publish and Revoke Scorecard][Reupload Scorecard with comments][View Scorecard][Modify Scorecard Targets][Submit Scorecard][Manage Comments Trail][View Scorecard Workflow Status][Approve Scorecard][Scorecard Submission Workflow][Compensation Scorecard Submission Workflow] |
Analysis | Use Case | Use Case |
Use Case Specifications | Use Case Specifications | |
Overall System Workflow | [View Detailed Version with Logic ] | |
Screen Shots | HR, Call Reports, Outstanding, Quality, Advisory, Client Base | |
Design | ER Diagram | [v1][v2][v3] |
Testing | User test plan | Instructions |
Project Management
Provide more details about the status, schedule and the scope of the project. Describe the complexity of the project.
Timeline:
will be updated
Milestones:
will be updated
Project Scope:
will be updated
Scope |
Environment Setup |
Human Resource |
Call Reports |
Outstanding Deficiencies |
Client Base |
Advisory Suitability Checks |
Quality |
Admin Release Scorecard |
Admin View Uploaded Files |
Access Control Menu for Filter |
Excel Upload |
Comments |
Workflow |
Portlet's detailed view and Account numbers |
Quarterly Targets Indicators |
Compensation Scorecard (New!) |
Admin View Scorecard submission status (New!) |
Project Status Overview
will be updated
Scope | Status | Confidence Level |
Environment Setup | Completed | |
Human Resource | Completed | |
Call Reports | Completed | |
Outstanding Deficiencies | Completed | |
Client Base | Completed | |
Advisory Suitability Checks | Completed | |
Quality | Completed | |
Admin Release Scorecard | Completed | |
Admin View Uploaded Files | Completed | |
Access Control Menu for Filter | Completed | |
Excel Upload | In-Progress (Analysis) | 1 |
Comments | In-Progress (Analysis) | 1 |
Workflow | In-Progress (Analysis) | 1 |
Portlet's detailed view and Account numbers | In-Progress (Analysis) | 1 |
Quarterly Targets Indicators | In-Progress (Analysis) | 1 |
Compensation Scorecard (New!) | Not Started | 1 |
Admin View Scorecard submission status (New!) | Not Started | 1 |
Project Status Detailed View:
will be updated
OPTIMUS's Detailed Project Status XLS
Highlight changes to modules, the completion status (implemented, user testing done, client approved, deployed, etc), the confidence level (0-1 where 0 is no confident of getting it done, 1 is 100% confident in getting it done) and comments (who has been assigned to do it, new scope, removed scoped, etc). Please use a table format to summarize with links to function details.
Task/function/features, etc | Status | Confidence Level (0-1) | Comments |
Create Access Control Menu for Filter (Select EAM, Select RM, Select Quarter, Refresh) | 100% / Integrated / Not Tested | 0.1 | Weng has to lias with our client's developers that is responsible for IAFS (an in house user access control system) to understand how we can integrate Scorecard and utilize the RM's teaming |
Create Human Resource UI | 100% / Integrated / Tested | 0.1 | Weng is researching on how to display outputs - This is the first time the team is exposed to the Liferay technology that we are utilizing, thus the low confidence level. Learning curve is steep. Necessary to figure out the creation of rows and columns |
Create Call Reports UI | 100% / Integrated / Tested | 0.5 | Weng - Not fully confident as we are still familiarizing ourselves with the Liferay technology of creating rows and columns that are similar to that of Human Resource and Call Report Portlets. |
Create Quality UI | 100% / Integrated / Tested | 0.3 | Weng - Quality portlet requires the use of tab views on the front end. This is the first time we are implementing this on Liferay. Not used in Human Resource or Call Reports portlet. Thus the low confidence level |
Create Outstanding UI | 100% / Integrated / Tested | 0.6 | Weng - Outstanding Deficiencies is a huge portlet with an additional pop-up when the "blue Info" button is clicked. This presents a detailed breakdown with more parameters of measurement. Multiple rows and columns required. Very tedious and time consuming. First time exploring the creation of pop ups in Liferay |
Create Advisory UI | 100% / Integrated / Tested | 1 | Weng - Normal Portlet with rows and columns |
Create Client Base UI | 100% / Integrated / Tested | 0.7 | Weng - Client Base portlet is similar to outstanding Deficiencies. It is a gigantic portlet with addition pop-ups with tab viewing that presents detailed breakdown of more parameters that are meaningful to the RM. |
Create Compensation Scorecard UI | Not Started | 0.8 | Muar - We Intend to commence this function during our recess break. Since the team has no other commitments, we are dedicating all resources to completing this function. In addition, we have gathered all the necessary requirements from front end users, stating what they want to see in the Compensation Scorecard and how the data would be presented. |
Create Comments (Compensation Scorecard and also Quarterly Scorecard UI) | Not Started | 0.6 | Muar - Comments incorporates workflow which is something that the team has yet to explore. We will utilize the recess week to develop this function |
Create Alerts / Notification (Pop-ups, alert portlet) UI | Not Started | 0.3 | Muar - Alerts are being populated every time a Scorecard is being sent for approval to a manager. Utilize recess week to complete this function |
Create Administrator (View Uploaded Excel Files) UI | 80% / Not Integrated | 0.7 | Weng - We have partially developed the front end view that allows the administrator to view the excel files which have been uploaded, populating a "Green Tick" if upload has been completed, a "Red Tick" otherwise. |
Create Administrator / Data Owner (Upload Excel Files)UI | 80% / Not Integrated | 0.8 | Weng / Yan Xin - Create a view that allows users to upload excel files. |
Create Administrator function to (Release Scorecard / Revoke Scorecard) UI | 100% / Not Integrated | 1 | Weng - We have partially developed this function, allows the administrator to view the release scorecard button when the necessary files (IT_Relationships) is in. The revoke feature is used to retract that particular's quarter's Scorecard. |
Quarterly Target Indicators | Not Started | 1 | Weng - to populate a trend indicator based on previous and current quarter's data |
Quarterly Remarks - Truncate and read more | 100% / Integrated / Tested | 1 | Weng - was requested as a new function by the front office people, to ensure that the Liferay dashboard does not look too cluttered. When Read more is being clicked, it will display more comments. |
Call Reports - Total Number per Quarter | 100% / Integrated /Tested | 0.5 | An - Having been familiar with JPA and EJB and the Liferay framework. we have identified which database it would be pulling data from and displayed |
Call Reports - Average Per Relationship | 100% / Integrated /Tested | 0.5 | An |
Call Reports - Number of relationships without CR for the last 6 months | 100% / Integrated /Tested | 0.5 | An |
Quality (Account Applications) - Total Submitted | 100% / Integrated /Tested | 0.5 | An |
Quality (Account Applications) - Number sent back by L&C (due to insufficient KYC info) | 100% / Integrated /Tested | 0.5 | An |
Quality (Account Applications) - % of applications sent back by L&C (due to insufficient KYC info) | 100% / Integrated /Tested | 0.5 | An |
Quality (Credit Exposure) - Number of cases of Credit exposure without prior credit approval | 100% / Integrated /Tested | 0.5 | An |
Quality (Operational Gain & Loss) - Loss (Amt in CHF) | 100% / Integrated /Tested | 0.5 | An |
Quality (Operational Gain & Loss) - Loss (No. of Events) | 100% / Integrated /Tested | 0.5 | An |
Quality (Operational Gain & Loss) - Gain (Amt in CHF) | 100% / Integrated /Tested | 0.5 | An |
Quality (Operational Gain & Loss) - Gain (No. of Events) | 100% / Integrated /Tested | 0.5 | An |
Quality (Waivers & Refunds) - Amt (in CHF) | 100% / Integrated /Tested | 0.5 | An |
Quality (Waivers & Refunds) - No. of events | 100% / Integrated /Tested | 0.5 | An |
Outstanding (Mandatory Docs MAS 626) - No. of Documents >120 & Total | 100% / Integrated /Tested | 0.8 | An - multiple columns/rows and tabs, each row and tab requires a different logic and query |
Outstanding (Mandatory Docs MAS 626) - No. and % of Accounts with Deficiencies > 120 | 100% / Integrated /Tested | 0.8 | An - multiple columns/rows and tabs, each row and tab requires a different logic and query |
Outstanding (Mandatory Docs NON-MAS 626) - No. of Documents >120 & Total | 100% / Integrated /Tested | 0.8 | An - multiple columns/rows and tabs, each row and tab requires a different logic and query |
Outstanding (Mandatory Docs NON-MAS 626) - No. and % of Accounts with Deficiencies > 120 | 100% / Integrated /Tested | 0.8 | An - multiple columns/rows and tabs, each row and tab requires a different logic and query |
Outstanding (Outstanding Written Confirmations) - 1- 12 months / >12 months / Total | 100% / Integrated /Tested | 0.8 | An - multiple columns/rows and tabs, each row and tab requires a different logic and query |
Outstanding (No. of Accounts with Outstanding Written Confirmations) - 1- 12 months / >12 months / Total | 100% / Integrated /Tested | 0.8 | An - multiple columns/rows and tabs, each row and tab requires a different logic and query |
Outstanding (Outstanding Investment Profiles) - >90 days / Total | 100% / Integrated /Tested | 0.8 | An - multiple columns/rows and tabs, each row and tab requires a different logic and query |
Outstanding (AMLS Comments Overdue) - % of AMLS comments overdue (RM and Superior Level) | 100% / Integrated /Tested | 0.8 | An - multiple columns/rows and tabs, each row and tab requires a different logic and query |
Outstanding (Risk Based Clients Reviews Overdue) - Total and % of Number of accounts with reviews overdue | 100% / Integrated /Tested | 0.8 | An - multiple columns/rows and tabs, each row and tab requires a different logic and query |
Outstanding (Mandatory Docs MAS 626 - Detailed view) - Total Outstanding / 0-60 days / 61-120 days / >120 days | 100% / Integrated /Tested | 0.8 | An - multiple columns/rows and tabs, each row and tab requires a different logic and query |
Outstanding (Mandatory Docs MAS 626 - Detailed view) - Number of documents outstanding / 0-60 days / 61-120 days / >120 days | 100% / Integrated /Tested | 0.8 | An - multiple columns/rows and tabs, each row and tab requires a different logic and query |
Outstanding (Mandatory Docs NON MAS 626 - Detailed view) - Number & % of accounts with deficiencies 0-60 days / 61-120 days / >120 days | 100% / Integrated /Tested | 0.8 | An - multiple columns/rows and tabs, each row and tab requires a different logic and query |
Outstanding (Mandatory Docs NON MAS 626 - Detailed view) - Pending Documents total / 0-60 days / 61-120 days / >120 days | 100% / Integrated /Tested | 0.8 | An - multiple columns/rows and tabs, each row and tab requires a different logic and query |
Outstanding (Outstanding written confimations - Detailed view) - total / outstanding <6 months /6-12 months / >12 months | 100% / Integrated /Tested | 0.8 | An - multiple columns/rows and tabs, each row and tab requires a different logic and query |
Outstanding (Outstanding Investment Profiles - Detailed view) - total / 0-90 / >90 days | 100% / Integrated /Tested | 0.8 | An - multiple columns/rows and tabs, each row and tab requires a different logic and query |
Outstanding (AMLS comments - Detailed view) - No. and % of comments overdue (RM) and (Superior) | 100% / Integrated /Tested | 0.8 | An - multiple columns/rows and tabs, each row and tab requires a different logic and query |
Outstanding (Risk Based Clients Reviews Overdue - Detailed view) - Total number and % of accounts with reviews overdue | 100% / Integrated /Tested | 0.8 | An - multiple columns/rows and tabs, each row and tab requires a different logic and query |
Human Resource - Attendance for mandatory trainings | 100% / Integrated /Tested | 0.1 | An is researching on Java Persistence API (JPA) and Enterprise JavaBeans (EJB). These are new technologies to us, having to learn the liferay framework from scratch, do self testing. It is also necessary that a good overview and understanding of the system is clarified, where the data will be pulled from and how to form the Queries necessary. |
Human Resource - Amount of CPD hours | 100% / Integrated /Tested | 0.1 | An |
Human Resource - PARC Year-end review | 100% / Integrated /Tested | 0.1 | An |
Human Resource - PARC Goal Setting | 100% / Integrated /Tested | 0.1 | An |
Client Base - Total number of relationships | 100% / Integrated / Tested | 1 | An |
Client Base - Number of accounts | 100% / Integrated / Tested | 1 | An |
Client Base - % of Total AuM booked in Singapore | 100% / Integrated / Tested | 1 | An |
Client Base - Unfunded & inactive relationships | 100% / Integrated / Tested | 1 | An |
Client Base - Relationships > 12 months old | 100% / Integrated / Tested | 1 | An |
Client Base -Relationship Type(Detailed view) - Unfunded | 100% / Integrated / Tested | 1 | An |
Client Base -Relationship Type(Detailed view) - Unfunded and Inactive | 100% / Integrated / Tested | 1 | An |
Client Base -Relationship Type(Detailed view) - <CHF 250k | 100% / Integrated / Tested | 1 | An |
Client Base -Relationship Type(Detailed view) - <CHF 250k and >12 months | 100% / Integrated / Tested | 1 | An |
Client Base -Relationship Type(Detailed view) - CHF 250k - 1 million | 100% / Integrated / Tested | 1 | An |
Client Base -Relationship Type(Detailed view) - CHF 250k - 1 million and > 12 months | 100% / Integrated / Tested | 1 | An |
Client Base -Relationship Type(Detailed view) - >= CHF 1 million | 100% / Integrated / Tested | 1 | An |
Client Base -Funding/Activity of Account(Detailed view) Total no. of accounts/Funded/Unfunded/Unfunded & >12 months old/Inactive | 100% / Integrated / Tested | 1 | An |
Client Base - Wealth Bracket of Relationships(Detailed view) Unfunded / Unfunded and Inactive | 100% / Integrated / Tested | 1 | An |
Client Base - Wealth Bracket of Relationships(Detailed view)- <CHF 250k/<CHF250k and >12months/CHF 250k-1 million/CHF 250k-1million and > 12months / >=CHF 1 million | 100% / Integrated / Tested | 1 | An |
Advisory - Advisory Framework Suitability Checks (Number and % of accounts with alerts) | 100% / Integrated / Tested | 1 | An |
Advisory - Advisory Framework Suitability Checks (Number and % of accounts with overdue alerts) | 100% / Integrated / Tested | 1 | An |
Advisory - Type of overdue alerts (Product Risk, Complexity, Equity Allocation, Al Allocation, Leverage,Downside Derivative Purposes, Concentration Risk, Mandate) | 100% / Integrated / Tested | 1 | An |
Compensation Scorecard - Client Documentation (% of accounts with Mandatory Documents (regulatory defined) outstanding for > 120 days | Not Started | 1 | Muar - will use the recess week to complete this function, |
Compensation Scorecard - Client Documentation | Not Started | 1 | Muar - will use the recess week to complete this function, |
Compensation Scorecard - Compliance Monitoring | Not Started | 1 | Muar - will use the recess week to complete this function, |
Compensation Scorecard - Training | Not Started | 1 | Muar - will use the recess week to complete this function, |
Compensation Scorecard - Client Excellence | Not Started | 1 | Muar - will use the recess week to complete this function, |
Compensation Scorecard - Comments / Submit Scorecard | Not Started | 1 | Muar - will use the recess week to complete this function, |
Workflow - Submitting of comments for quarterly scorecard review | Not Started | 1 | Muar - Will use recess week to complete this function |
Workflow - Approve / Review Scorecard | Not Started | 1 | Muar - Will use recess week to complete this function |
Admin - View Scorecard submission status | 80% / Not Integrated | 1 | Weng - We have partially developed the front end view that allows the administrator to view the excel files which have been uploaded, populating a "Green Tick" if upload has been completed, a "Red Tick" otherwise. |
Portlet's detailed view of accounts and percentages | Not Started | 1 | Weng / An - To give a detailed breakdown view of what the numbers make up (ie which account number, how many of such documents etc) |
Project Schedule (Plan VS Actual)
Planned | Actual | |||||
Sprint | Task | Start | End | Start | End | Comment |
4 - Starts 16 July 2012 | Setting up of Environment on our laptops | 16/7/12 | 25/7/12 | 18/7/12 | 29/7/12 | We started the setting up of the environment 2 days late, had to get security clearance from Head of Security to extract the necessary files (Liferay, Eclipse, necessary plugins and configurations(Maven and Jboss, Java 1.5 and IE 8) from USB ports. USB ports are all disabled in the bank. It took us 4 days longer than expected to learn and familiarize ourselves with Client's development environment |
Setting up of Databases and defining Database structure | 27/7/12 | 31/7/12 | 27/7/12 | 03/8/12 | - | |
5 - Starts 30 July 2012 | Develop Human Resource UI | 30/7/12 | 02/8/12 | 30/7/12 | 05/8/12 | Took 3 days longer than planned, had to self learn how to display outputs on Liferay - This is the first time the team is exposed to the Liferay technology that we are utilizing. Learning curve is steep. Necessary to figure out the creation of rows and columns. Had to meet the 6th August deadline as we had a pre-project acceptance meeting scheduled with Prof Ben Gan. |
Develop Call Report UI | 31/7/12 | 03/8/12 | 05/8/12 | 05/8/12 | Started on this portlet 5 days late, due to the delay in understanding how to display outputs on Liferay (Human Resource UI) Completed this portlet on the same day we started | |
Develop Human Resource Logic | 30/7/12 | 02/8/12 | 30/7/12 | 05/8/12 | Took 3 days longer than planned, had to research on Java Persistence API (JPA) and Enterprise JavaBeans (EJB). These are new technologies to us, having to learn the liferay framework from scratch, do self testing. It is also necessary that a good overview and understanding of the system is clarified, where the data will be pulled from and how to form the Queries necessary. Was stuck and unable to display data dynamically from DB to Liferay (Highlighted to supervisor) | |
Develop Call Report Logic | 31/7/12 | 03/8/12 | 05/8/12 | 05/8/12 | Still familarizing ourselves with JPA and EJB and the Liferay framework used in Human Resource portlet. we have also identified which database it would be pulling data from and displayed. Requirements gathered were clear. As above we were unable to display data dynamically (We eventually solved this issue 2 days later) | |
Creation of Entity Classes with getters and setters | 30/7/12 | 03/8/12 | 30/7/12 | 03/8/12 | - | |
Mapping of Staging DB and Data Cache | 30/7/12 | 03/8/12 | 30/7/12 | 03/8/12 | - | |
Develop Quality UI | 14/08/12 | 17/08/12 | 14/08/12 | 19/08/12 | Completed Quality portlet 2 days late.Quality portlet requires the use of tab views on the front end. This is the first time we are implementing this on Liferay. Not used in Human Resource or Call Reports portlet. Under-estimated the complexity of task and over-estimated the capability of tasked resource | |
Develop Advisory Excellence Suitability checks UI | 18/08/12 | 20/08/12 | 18/08/12 | 20/08/12 | - | |
6 - Starts 21 August 2012 | Develop Outstanding Deficiencies UI | 21/08/12 | 22/08/12 | 21/08/12 | 21/08/12 | Function was completed on the same day it started |
Develop Client Base UI | 22/08/12 | 23/08/12 | 21/08/12 | 21/08/12 | Function was completed on the same day that Outstanding Deficiencies UI started. | |
Develop Excel upload UI | 23/08/12 | 26/08/12 | 23/08/12 | 26/08/12 | More time was allocated to the development of the Excel upload interface (Task complexity high) | |
Develop CSV validation | 22/08/12 | 05/09/12 | 22/08/12 | 07/09/12 | 2 Days late - The conversion from SQL to JPA queries took a while as we had to do some reading up (Yan Xin) | |
Develop CSV re-upload with audit trail | 23/08/12 | 09/09/12 | 24/08/12 | 09/09/12 | Had some issues with the last portion of re-upload of excel files with audit trail (weng) | |
7 - Starts 10 September 2012 | Quarterly Remarks - Truncate and read more | 10/09/12 | 11/09/12 | 10/09/12 | 11/09/12 | Weng |
Create Administrator (View Uploaded Excel Files) UI | - | - | 12/09/12 | 12/09/12 | Weng | |
Create Administrator function to (Release Scorecard / Revoke Scorecard) UI | - | - | 12/09/12 | 14/09/12 | Weng | |
Revise Logic for Human Resource | 10/09/12 | 12/09/12 | 10/09/12 | 12/09/12 | An | |
Revise Logic for Call Report | 13/09/12 | 14/09/12 | 13/09/12 | 14/09/12 | An | |
Create Logic for Quality | 15/09/12 | 19/09/12 | 15/09/12 | 19/09/12 | An | |
Create Logic for Advisory | 20/09/12 | 21/09/12 | 20/09/12 | 21/09/12 | An | |
Integration of 6 portlets UI onto Clients environment | 18/09/12 | 18/09/12 | 18/09/12 | 18/09/12 | Integration of 6 portlets onto Clients environment | |
8 - Starts 24 September 2012 | Create Logic for Outstanding | 24/09/12 | 26/09/12 | 24/09/12 | 28/09/12 | 2 days longer. An's computer crashed, did not save files |
Create Logic for Client Base | 26/09/12 | 30/09/12 | 26/09/12 | 30/09/12 | ||
Create Access Control Menu for Filter (Select EAM, Select RM, Select Quarter, Refresh) | 28/09/12 | 30/09/12 | 28/09/12 | 01/10/12 | The integration of Access Control Menu onto client's environment was more complex than expected.We realised we had to code this function on Client's environment,we had no access to the office on Sunday (30/09/12) thus this function was delayed by a day | |
9 - Starts 08 October 2012 (Recess Week) | Quarterly Targets Logic (display of trend indicators) | 08/10/12 | 08/10/12 | Wengs (action item) | ||
Portlet's detailed view of accounts and percentages | 08/10/12 | 10/10/12 | Wengs(action item) | |||
Complete Excel Upload Function | 11/10/12 | 11/10/12 | Wengs(action item) | |||
Compensation Scorecard UI | 08/10/12 | 08/10/12 | Muar (action item) | |||
Comments (Quarterly,Compensation Scorecard UI) | 08/10/12 | 08/10/12 | Muar (action item) | |||
Compensation Scorecard Logic | 09/10/12 | 09/10/12 | Muar (action item) | |||
Comments (Compensation Scorecard logic) | 09/10/12 | 11/10/12 | Muar (action item) | |||
Comments (Quarterly logic) | 11/10/12 | 12/10/12 | Muar (action item) | |||
Workflow Status Logic | 13/10/12 | 14/10/12 | Muar (action item) | |||
Admin - View Scorecard submission status (submitted or pending submission) | 12/10/12 | 14/10/12 | Wengs (action item) |
Project Metrics:
will be updated
Project Risks:
Technical Complexity:
will be updated
Deployment:
In an iterative approach, ready to use system should be available (deployed) for client and instructions to access the system described here (user name). If necessary, provide a deployment diagram link.
Testing
Optimus has planned for the Functionality Testing (FT) to be carried out for the integration of the six portlets and IAFS on the bank’s server. We have obtained paper-based data/results from the bank for comparison to data/results derived from back-end logic we have developed on our own. Essentially, we will be checking our derived results against those of the bank’s to observe if our outputs are accurate.
As for User Testing (UT), users will receive a copy of our designed test cases prior to the implementation of testing. After which, they will log into their respective accounts (as admin) and view a given RM’s account, checking his/her relevant data against the expected output (paper-based data/results). Users will then proceed to record down the actual (displayed) results in the test case, and indicate if the functions passes or fails that particular testing.
You can download our documents below:
Documents | Link |
Test Plan | will be updated |
Test Cases | will be updated |
Test Results/Analysis | will be updated |
Reflections
Individual Reflections
Optimus's Contributions on IS480 Wiki:
Optimus's lessons learnt and take-aways shared on the IS480 Wiki knowledge base
1. Liferay portal
[Liferay vs Sharepoint]
2. Spring Framework
[Advantages of Spring Framework]
3. Spring Features
[Spring Features]
4. Java Persistence API (JPA)
[JPA]
5. Enterprise JavaBeans (EJB)
[EJB]
[Types of EJB]