HeaderSIS.jpg

SColutions Supervisor Meeting Minutes

From IS480
Revision as of 22:05, 26 August 2014 by Ml.ren.2012 (talk | contribs)
Jump to navigation Jump to search

Scolutions.png

Scolutions-Pen.png Overview Scolutions-Charts.png Proj Mgmt Scolutions-Doc.png Documentation Scolutions-Overview.png Team Resource


Sponsor Meeting Mins

Supervisor Meeting Minutes

Team Meeting Minutes



Acceptance Presentation Feedback.pdf

S/N

Date

Supervisor

Agenda

Documents

1

2 July 2014

Prof Benjamin Gan

  • Team should test system on SMU students. Focus on a small community first
  • Blogshop owners are good but full-fledged vendors will be the better choice. Shows more substance
  • Look into the possibility of using already built libraries to build e-commerce shopping cart
  • Engage supervisor on feedback
  • Update wiki to allow supervisor get more visibility on project
  • Update risks to be more specific and more numbers oriented

Supervisor Meeting (2 July)

2

22 July 2014

Prof Steven Hoi & Prof Benjamin Gan

  • Prof Gan mentioned for the team to use the domain name that Peter has registered us
  • Conduct survey to find out what are the existing e-commerce products in the market and what are their key characteristics
  • Do up a product comparison to show how the our project is able to differentiate from our competitors
  • Blogshop owners to upload items onto our stores
  • Conduct both observation type testing (IDP) and heuristic testing
  • Update wiki page
  • Prof Gan mentioned that we should not be searching for our own vendors. This should be done by our sponsor. We will only need to focus on running the vendor’s products
  • Need to ask Peter to find the vendor as Prof Gan mentioned that Peter has told him that he has some vendors in mind already

Supervisor Meeting (22 July)

3

6 Aug 2014

Prof Steven Hoi

  • Need to beef up more on analytics section. Discuss in specific what metrics the team is planning to use in the administrator module
  • Make checks on the system to see if it is slow (Might be due to the slow network)
  • Tighten all loose ends on the demo. Prepare a scenario for the demonstration
  • Tidy up wiki and make sure that all content required is filled
  • Check with sponsor if he is free for Acceptance presentation

Supervisor Meeting (22 July)

4

Acceptance Presentation

  • X factor
    • a.Live deployment: To give an estimated number of unique registered users
  • Use-Case diagram:
    • a.Add in 1 more type of user: Buyers who browse and buy from myhubstore without registering for an account
  • In this project, differentiate between which is Our idea and which is Sponsor’s idea
    • E.g. Factors chosen in product comparison: Commission idea belongs to Sponsor
  • UAT and Heuristics after GO LIVE?
    • a. Unsure what was said b. To be included in wiki if it holds true
  • Remove from Risk Assessment:
    • a.Underestimation/Overestimation – Too generic
  • Live Demo:
    • a. Add postal code – to identify store’s location base on postal code b. No. of images uploaded per item to be made flexible c. Explain why some variables are hardcoded e.g. no. of images/item d. Using city and not country for Store e. Using Google Map API to calculate distance between Store and User when User choose to search by location
  • Add layer for 3rd party API (Acceptance Slide #20)
  • Show components of code (By Midterm) and not just the System Architect
  • Test cases to be shown, at least 1 slide, instead of just saying we use Selenium, Show test case and identify if we are doing
    • i.Input/Output Test ii. Validation iii. Range Test
  • Usability Test done by Students and Heuristics done by Experts
  • User Acceptance Testing (Acceptance Slide #26) refers to our Integration Test
    • a. For UAT we need to set goals, what we want to achieve
  • Learning Outcomes to be different from the standard learning outcome from the IS480 course outline