Line 18: Line 18:
 
View our '''[https://docs.google.com/spreadsheet/ccc?key=0AiHB7xA5vDvvdDAzd2xxQlpzaEFxaGJBTFRpWngyOEE#gid=0 Product Backlog]''' to see the Complete Breakdown for each sprint.
 
View our '''[https://docs.google.com/spreadsheet/ccc?key=0AiHB7xA5vDvvdDAzd2xxQlpzaEFxaGJBTFRpWngyOEE#gid=0 Product Backlog]''' to see the Complete Breakdown for each sprint.
  
[[Image:Combined-Timeline.jpg | 1100px| center | ]]
+
[[Image:Combined-Timeline.jpg | 1000px| center | thumb ]]
  
 
===<div style="background: #009999; padding: 13px; font-weight: bold; line-height: 0.3em; text-indent: 20px;font-size:20px;"><font color= #ffffff>Schedule/Burndown Charts</font></div>===
 
===<div style="background: #009999; padding: 13px; font-weight: bold; line-height: 0.3em; text-indent: 20px;font-size:20px;"><font color= #ffffff>Schedule/Burndown Charts</font></div>===

Revision as of 21:08, 19 February 2013

Project Progress Summary

View our Midterm Slides here,,,.

View our Project Overview & Description.

Project Status

  • Currently at Sprint 6 (14 Feb 2013 to 21 Feb 2013). View our Sprint Progress here.
  • Completed approx 60% of our Project.
  • Usability Testing conducted on Sprint 5. View our UT Results here.
  • Last Client Feedback Session on Sprint 4 (25 Jan 2013). View the Meeting Minutes here.
  • Upcoming Sprint 7 (21 Feb 2013 to 28 Feb 2013). Sprint 7 have not started, view our Product Backlog here.

Project Management

Overview of Project Schedule

Our Project currently has 9 Sprints in total. Below is the comparison between our current schedule and our initial schedule we drafted at acceptance.

View our Product Backlog to see the Complete Breakdown for each sprint.

Combined-Timeline.jpg

Schedule/Burndown Charts

Below are all our Burndown chart since inception. These Burndown chart tracks how much work has been completed and the rate at which we complete our tasks during the sprint.

View our Logiciel Project Management Wikipage to see the breakdown of task for each sprint.

Overall Burndown Chart

Logiciel Overall Burndown.png

Sprints Burndown Comparison

Logiciel-Sprint-Velocity.png
Logiciel-Uncompleted-Schedule.png
Burndown Spreadsheets
Sprint 0 Sprint 1 Sprint 2 Sprint 3 Sprint 4 Sprint 5 Sprint 6
Logiciel Burndown Comparison.jpg

Bug Metrics

Risk Management Plan & Risk Backlog

The table below showcase our Outstanding Risks as of the current Sprint, Sprint 6.

View our Risk Backlog to see our mitigated Risks.

View our Risk Management Plan to find out how we identify Risks and formulate our action plan.

Risk Resolve-By Date Risk Score Action Plan Contingency Plan Current Status / Updates
Adoption resistance One risk our project faces is that of resistance in adopting our portal as a strategy formulation tool – to be used concurrently with SalesForceDotCom. As the use of SFDC is entrenched into our client’s business process, and managers and senior management are used to their usual modes of reporting and gathering data, a problem will be to integrate the use of our portal in a way that is as seamless as possible 26/4/2013 8 Dedicating a portion of the UAT to finding out the preferences of our client; assessing the tweaks or things we should implement to aid adoption Hold training and briefing sessions, as well as provide demonstrations of the use of our portal so as to allow the main groups of users to be familiarized with the portal. This will be more so catered when we hand over the project – should not all the groups be available, we will conduct the briefing/handover to the IT team at TR. NIL
Graphs Rendering Response time for graphs may be unacceptable by client. Usually graphs render under 1s, but it can take 3s sometimes 14/3/2013 6 Do caching for graphs. Have separate table that stores requests for json data, so that identical requests will read from the same data. If we are unable to implement caching, we will need to negotiate Quality Attributes with the client. If the change does not produce significant results, we will need to do logging to find out where is the delay NIL
Sentimental Analysis Library maui, may not be able to run effective topic extraction and possible polarity analysis on answers 21/2/2013 4 Perform thorough research on the functions to become more familiar with the technology Look for other implementations of KEA, or consider using vanilla KEA to perform task. Also consider dropping polarity of topic analysis Research in progress
Search Engine Apache Solr, may not be able to implement multiple document types on a single page 21/2/2013 4 Perform thorough research on the functions to become more familiar with the technology Stick with single document type for Solr Research in progress

Development Overview & Technical Summary

Technical Complexities

Summary of Adapted Technologies

Technology Blog

Testing

Recent Usability test was conducted in Sprint 5, 30 Jan 2013 to 1 Feb 2013.

No. Objectives of Test
1 Find out the Clarity of our Graphs
2 Find out whether is the Graph Interaction Intuitive
3 Overall Look & Feel of the Application
4 Find Bugs in the Application
Scope of Test
Functionalities Graph Drilldown Result
Team Performance Tested Tested NA
Revenue by Location Tested Scheduled for Client UAT NA
Losses by Location Tested Scheduled for Client UAT NA
Product by Sales Tested Tested NA
Sales Factor Graphs Tested Scheduled for Client UAT NA
Search NA NA Tested

Qualitative Test Findings

Quantitative Test Findings

Upcoming Client UAT

We have 2 Upcoming User Acceptance Tests (UAT). For more Details on our testing schedule, view our team Logiciel Testing Schedule.

  • UAT Phase 1 (27 Feb 13 or 6 Mar 13)
  • UAT Phase 2 (14 Mar 13 or 21 Mar 13)
User Acceptance Test Phase 1 User Acceptance Test Phase 2
Testers Amt. Testers Amt.
Taiwanese Sales Manager 1 Regional Sales Manager 2
Korean Sales Manager 1 Sales Representatives 2
Customer Interviewers 2
Administrators 2

User Acceptance Test Scope (Phase 1 Only)

Functionalities Graph Drilldown
Revenue by Location Completed in UT Yes
Losses by Location Completed in UT Yes
Sales Factor Completed in UT Yes
Competitor Trend Yes Yes
Export Yes No Export function in Drilldown page
Account Login Only Sales Manager can see Graph Dashboard Only Sales Manager can see Drilldown
Feedback Form Only Sales Representatives & Customer Interviewer Only Sales Representatives & Customer Interviewer
Manage Accounts Only Admins Only Admins
Manage Questions Only Admins Only Admins

Team Learning Outcomes

Amelia Low

Amelia-Photo.jpg

Elvin Lim

Elvin-Photo.jpg

Frank Lim

Frank-Photo.jpg

Ryan Ng

Ryan-Photo.jpg

Qian Hui

QH-Photo.jpg

Vernon Lek

Vernon-Photo.jpg