It is all about the system
Main Page: IS480 Team wiki: 2010T2 Good Mix
Contents
System Architecture
RIBA is structured in 3-tier architecture. Accessing to RIBA will be easy once it is hosted on the internet. This is because end users only have to ensure that they get the latest Flash Player installed in their laptop.
|
Technical Specifications
Use Case & Its Description
End User:
System Administrator:
Media:Use Case Description.pdf
Deployment
1) Deployment Guide for our client KOOPrime: Media:Deployment Guide.pdf
2) Screenshots of what is inside the RIBA Installation Pack:
The lines depict the other sub folders or files when the folder is opened up. The test folder is for the deployment guide which address the maintenance issue of uploading shapefiles which are spatial layers and adding new symbols for layers.
3) Deployment Diagram:
UAT
3 usability study sessions with Kooprime client and National Parks end users were conducted throughout this FYP. During these sessions, we will demonstrate our system and sometimes let them hands-on to get user feedback.
The usability sessions are: 27th September, 08 September and 23 August
UAT was conducted on 10th November where participants are divided into 2 groups - client and end users.
Our client, KOOPrime, will be the administrators of RIBA. They are given deployment guide and installation pack CD to test the process out. This is to clarify any doubts and ensure that our client is able to deploy RIBA. Unfortunately, they are not able to get an internet connection from school and thus have to bring back the materials to try out on their own.
The other group is the end users from National Parks Biodiversity Centre. There are 4 members representing different departments to go through the Test Plan and test our RIBA. They include Director of National Parks, Project Senior Officer, Biodiversity Officers and Informatics Manager
This is the test plan we used during UAT. It might take a while to load: Media:Test Plan.pdf
Disclaimer: All images and content on this page are done by Good Mix and should not be published without their permission.
Main Page: IS480 Team wiki: 2010T2 Good Mix