===Project Schedule (Plan Vs Actual):===
 
===Project Schedule (Plan Vs Actual):===
 
====<div style="font-size:16px; font-family:Roboto Condensed">Planned Project Schedule</div>====
 
====<div style="font-size:16px; font-family:Roboto Condensed">Planned Project Schedule</div>====
<center>[[Image:Kinetic_TImeline_V8.png|1000px|]]</center>
+
<center>[[Image:Kinetic_Timeline_V6.png|1000px|]]</center>
  
 
====<div style="font-size:16px; font-family:Roboto Condensed">Actual Project Schedule</div>====
 
====<div style="font-size:16px; font-family:Roboto Condensed">Actual Project Schedule</div>====
<center>[[Image:Kinetic_Timeline_V6.png|1000px|]]</center>
+
<center>[[Image:Kinetic_TImeline_V8.png|1000px|]]</center>
  
 
====<div style="font-size:16px; font-family:Roboto Condensed">Changes In Schedule</div>====
 
====<div style="font-size:16px; font-family:Roboto Condensed">Changes In Schedule</div>====
Line 281: Line 281:
 
| Delay in deployment of application due to effort required for Funding and Repayments module
 
| Delay in deployment of application due to effort required for Funding and Repayments module
 
| Postpone UAT to 29 Sept to allow for deployment and sufficient preparation
 
| Postpone UAT to 29 Sept to allow for deployment and sufficient preparation
 +
|-
 +
| 10
 +
| 30 Oct 2017
 +
| Added new feature (timed quiz) in gamification module
 +
| Sponsor request to add timed quiz to improve value proposition of Kinetic Loans as a learning platform. Team reviewed and accepted addition of feature
 +
| PM and Backend team re-estimated their efforts for iteration and assigned tasks accordingly.
 +
|-
 
|}
 
|}
  

Revision as of 23:09, 11 November 2017

Kinetic.png


Project Progress Summary


Kinetic Snapshot.png
Finals Slides Deployed Site
Kinetic PresentationIcon.jpg Kinetic Loans Logo.png

Project Highlights:


Kinetic Highlights.png


Project Challenges:

Kinetic Challenges.png

Project Achievements:

Kinetic Achievements.png

Project Management

Project Status:

Kinetic Status.png
Iteration Scope Module Task Planned/New feature? Status Confidence Level (0-1) Comments
2 Core Account Module Login/Logout Planned Fully deployed and tested 100% 1 Reviewed and accepted by sponsor
2 Core Account Module Signup Planned Fully deployed and tested 100% 1 Reviewed and accepted by sponsor
2 Core Account Module User Account Settings Planned Fully deployed and tested 100% 1 Reviewed and accepted by sponsor
3 Core Loan Initiation Module Request New Loan Planned Fully deployed and tested 100% 1 Reviewed and accepted by sponsor
4 Core Loan Initiation Module Re-List loan Planned Fully deployed and tested 100% 1 Reviewed and accepted by sponsor
4 Core Loan Search Module Search loan with filters Planned Fully deployed and tested 100% 1 Reviewed and accepted by sponsor
5 Core Portfolio Module Create/Manage loan portfolio Planned Fully deployed and tested 100% 1 Reviewed and accepted by sponsor
5 Core Fund Loan Module Fund listed loan Planned Fully deployed and tested 100% 1 Reviewed and accepted by sponsor
6 Core Admin Module Default tracker Planned Fully deployed and tested 100% 1 Reviewed and accepted by sponsor
6 Core Admin Module Check user/loan eligibility Planned Fully deployed and tested 100% 1 Reviewed and accepted by sponsor
6 Core Admin Module Check available loans Planned Fully deployed and tested 100% 1 Reviewed and accepted by sponsor
7 Secondary Funding and Repayments Module Process Usage Fees Planned Fully deployed and tested 100% 1 Reviewed and accepted by sponsor
7 Secondary Funding and Repayments Module Update Collection Amount Planned Fully deployed and tested 100% 1 Reviewed and accepted by sponsor
8 Secondary Learning Module Hover Icon Questions Planned Fully deployed and tested 100% 1 Reviewed by sponsor
8 Secondary Learning Module Pre/Post Lab Quiz New Fully deployed and tested 100% 1 Reviewed by sponsor
9 Secondary Analytics Module Borrower and Investor Dashboard Planned Fully deployed and tested 100% 1 Reviewed by sponsor
9 Secondary Analytics Module Timeline/Charts for borrower and investor Planned Fully deployed and tested 100% 1 Reviewed by sponsor
10 Secondary Credit Score Module Calculation of credit Score Planned Fully deployed and tested 100% 1 Reviewed by sponsor
10 Secondary Credit Score Module Calculation of loan risk grade Planned Fully deployed and tested 100% 1 Reviewed by sponsor
11 Secondary Analytics Module Simulation Settings Planned Tested 1 Reviewed by sponsor
11 Tertiary Gamification Module Timed Quizzes New Tested 1 Reviewed by sponsor



Project Schedule (Plan Vs Actual):

Planned Project Schedule

Kinetic Timeline V6.png

Actual Project Schedule

Kinetic TImeline V8.png

Changes In Schedule

Iteration Date of Schedule Revision Change in Schedule Reason Mitigation
6 3 Sept 2017 Switched iteration 7 features (Learning Module) and iteration 8 (Payments Module) Payments module had the higher technology risk (sponsor given payments API integration) and hence required by team to tackle earlier. All preparation (API given by sponsor, understanding of payments API by development team) was done and team is ready to implement payments in iteration 7.
7 17 Sept 2017 Added new feature (pre/post lab quiz) in learning module Sponsor request to add pre/post lab quiz to improve value proposition of KineticLoans as a learning platform. Team reviewed and accepted addition of feature Analytics module features were pushed to iteration 9. PM and Backend team re-estimated their efforts for iteration and assigned tasks accordingly.
7 17 Sept 2017 AWS Deployment date was shifted from 18 Sept to 21st Sept. Effort required for Funding and Repayments module exceeded expectations. Team postponed AWS deployment date to 21st Sept (iteration 8) to allow completion of module
7 18 Sept 2017 UAT 2 date was shifted from 21 Sept to 29 Sept Delay in deployment of application due to effort required for Funding and Repayments module Postpone UAT to 29 Sept to allow for deployment and sufficient preparation
10 30 Oct 2017 Added new feature (timed quiz) in gamification module Sponsor request to add timed quiz to improve value proposition of Kinetic Loans as a learning platform. Team reviewed and accepted addition of feature PM and Backend team re-estimated their efforts for iteration and assigned tasks accordingly.


Project Metrics:

Summary of analysis for the metrics collected. You may refer to another page for the details about the metrics and how it is collected.

Technical Complexity:

Describe and list the technical complexity of your project in order of highest complexity first. For example, deploying on iPhone using Objective-C, customizing Drupal with own database, quick search for shortest flight path, database structure, etc.

Quality of product

Provide more details about the quality of your work. For example, you designed a flexible configurable system using XML.config files, uses Strategy Design Pattern to allow plugging in different strategy, implement a regular expression parser to map a flexible formula editor, etc.

Project Deliverables:

List the artifacts produced for this project. The entire deliverable can be submitted in a separate thumb drive, web repository or place in the IS480 team wiki.

Stage Specification Modules
Project Management Minutes Sponsor weeks -10 -5 3 7 Supervisor weeks -2 3 5 7
Metrics Bug metrics
Requirements Story cards CRUD Customer, Trend Analytic
Analysis Use case overall
System Sequence Diagram client, server
Business Process Diagram
Screen Shots CRUD Customer, Trend Analysis
Design ER Diagram 1, 2, 3
Class Diagram 1, 2, 3
Testing Test plan instructions
Handover Manuals User tutorial, Developer manual, Setup manual
Code client server
Deployment Diagram instructions

Not all parts of the deliverables are necessary but the evidence should be convincing of the scope.

Quality:

Explain the quality attributes (non functional) of your project deliverables. Have you designed the architecture, use a design pattern, etc? Does your architecture address scalability, performance, reliability, availability, fault tolerance, usability, etc. Does your design address maintainability, flexibility, configurability, etc. Be brief here but you can link to diagrams or code detail pages. Do not repeat the technical complexity part, link to it if necessary.

Deployment:

In an iterative approach, ready to use system should be available (deployed) for client and instructions to access the system described here (user name). If necessary, provide a deployment diagram link.

Testing:

Describe the testing done on your system. For example, the number of user testing, tester profile, test cases, survey results, issue tracker, bug reports, etc.

Reflection

Compile common lessons and reflection for the team and for each team member. Be brief.

Team Reflection:

Key lessons learned – indicating where the team improved, or would do things differently next time. You may refer to the learning outcome summary in your proposal. A very short checklist style will suffice. It would be very convincing if the knowledge is share at the wiki knowledge base and linked here.

Individual Reflection:

Describe in a paragraph, the key areas of learning or improvement. These should be personal areas of growth or learning. Each individual should list his/her effort, responsibility, actual contributions and personal reflection. Do not repeat team project contributions or member roles. Link if necessary.

Sometimes, the client writes a report to feedback on the system; this sponsor report can be included or linked from here.