Line 222: Line 222:
 
<b><u>Task Metrics:</u></b>
 
<b><u>Task Metrics:</u></b>
 
<br>
 
<br>
[[File:Renew MidtermTaskMetrics.png|800px]]<br>
+
[[File:Renew MidtermTaskMetrics.png|center|800px]]<br>
 
<br>
 
<br>
 
<b><u>Bug Metrics:</u></b>
 
<b><u>Bug Metrics:</u></b>
 
<br>
 
<br>
[[File:Renew MidtermBugMetrics.png|800px]]
+
[[File:Renew MidtermBugMetrics.png|center|800px]]
 
<br>
 
<br>
 
<h4 style="background:#CAD4EC; padding: 10px; line-height: 1em; text-indent: 0px; font-size: 18px">Project Risks</h4>
 
<h4 style="background:#CAD4EC; padding: 10px; line-height: 1em; text-indent: 0px; font-size: 18px">Project Risks</h4>

Revision as of 12:24, 28 September 2017

Renew.png


HOME

ABOUT US

PROJECT OVERVIEW

PROJECT MANAGEMENT

DOCUMENTATION


Project Progress Summary

Deployed Site Link

Link here!

Midterm Slides

Link here!

Deployment Progress
  • Current Iteration: Iteration 8
  • Iteration Period: 9 October 2017 - 22 October 2017
  • Major Milestones: Midterm Presentation (10 October)
  • Functions: Blog, Roster


Project Highlights

  • Multiple changes in scope since our original start, even after acceptance.
  • The design aspect of our public facing website is constantly changing.
  • Related to the above point, design is equally important to functionality as our client is a fashion retailer thus necessitating a different approach to building the project.
  • Our end client has changed constantly throughout the project from the IT director to the IT department to the HR director to the HR department.
  • We had problems deploying to the server provided by the client and learnt about the server provided to us.
  • The team is consistently thinking of ways to value add to our project, even up to midterms.


Project Management

Project Status


Module Status Confidence Level (0-1) Comment
Job 100% 1 Nil
Admin 100% 1 Nil
Account 100% 1 Nil
Welfare 100% 1 Nil
Engagement 100% 0.95 There are concerns arising from our UAT regarding the design.
Reward 100% 0.9 There is a need to integrate with an existing POS system we have no control over.
Reporting 100% 0.9 Suggestions to improve this design-wise was raised in both UAT and supervisor meetings and the design has been altered but has not gone through UAT.
CMS 90% 0.8 Content is still being changed by the Client.
Communication 85% 0.75 Not tested in UAT.
Blog 0% 0.5 Future Development
Roster 0% 0.5 Future Development



Project Scope Changes


Planned

Midterm Scope Old.png


Actual

Midterm Scope New.png


S/N Function Module Function Type Type of Change Reason
1 a. Viewing of Exclusive Deals
b. Viewing of Leave Entitlement
Welfare Secondary Addition of Function Request from Client.
2 Email Previous Applicants of New Jobs Communication Secondary Removal of Function Request from Client.
3 Beeline Third Parties Good-To-Have Removal of Module After discussion with the Client, what Beeline can offer does not meet the Client's requirement hence the request to remove it.
4 a. Blog for Staff to Upload Newsletters
b. Ability to add videos to posts
Blog Good-To-Have Addition of Module Request from Client.


Project Schedule Changed

Planned (from Acceptance)

Renew Timeline 10Aug Ver 3.png


Actual

Renew ScheduleChangesHighlighted.png


Changes since Acceptance:

Previous Iteration New Iteration Change(s) Reason(s)
Iteration 6 Iteration 7 Job (III) module was pushed to Iteration 7 Underestimated the time needed to complete this module due to the notifications task.
Iteration 7 Iteration 7 Date where website goes live was pushed forward This was suggested during acceptance presentation to ensure more data can be collected
Iteration 8 Iteration 8 Midterms date was finalised Booking of midterms was opened
Iteration 8 Iteration 8 Third party module was replaced by Blog module Change in sponsor's needs led to the removal of the planned third party module, and the addition of the blog module


Project Metrics

For a complete breakdown of how we calculated our metrics, do take a look at Renew Metrics

Task Metrics:

Renew MidtermTaskMetrics.png



Bug Metrics:

Renew MidtermBugMetrics.png


Project Risks


Technical Complexity


Quality of Product

Intermediate Deliverables

Deployment

Tessa


Reflections


Team Reflections

Individual Reflections