HeaderSIS.jpg

Difference between revisions of "IS480 Team wiki: 2017T1 PlusMinus TestResults"

From IS480
Jump to navigation Jump to search
(uploaded test scripts for UAT)
(uploaded sprint 13 test cases)
 
(2 intermediate revisions by the same user not shown)
Line 236: Line 236:
  
  
<font face="Century Gothic" size=5px color="#354458">User Acceptance Test (UAT) - Sprint 13 [UPCOMING]</font>
+
<font face="Century Gothic" size=5px color="#354458">User Acceptance Test (UAT) - Sprint 13 [COMPLETED]</font>
 
<br/>
 
<br/>
 
<table>
 
<table>
Line 321: Line 321:
 
<tr>
 
<tr>
 
<td><font face="Century Gothic" size=3px color="#d1b195">- Download UT Results: </font></td>
 
<td><font face="Century Gothic" size=3px color="#d1b195">- Download UT Results: </font></td>
<td>[[Media:xxx|UAT Results]] </td>
+
<td>[[Media:plusminus_UAT_Results.pdf|UAT Results]] </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td><font face="Century Gothic" size=3px color="#d1b195">- Download Meeting Minutes: </font></td>
 
<td><font face="Century Gothic" size=3px color="#d1b195">- Download Meeting Minutes: </font></td>
<td>[[Media:xxx|UAT Meeting Minutes]] </td>
+
<td>[[Media:11ThyeHuaKwanHospitalMeeting08112017.docx.pdf|UAT Meeting Minutes]] </td>
 
</tr>
 
</tr>
 
</table>
 
</table>
Line 377: Line 377:
 
<tr>
 
<tr>
 
<td><center>12</center></td><td><center>05/11/2017</center></td><td><center>[[Media:Plusminus_TestCases_Sprint_12.xlsx |Sprint 12]]</center></td>
 
<td><center>12</center></td><td><center>05/11/2017</center></td><td><center>[[Media:Plusminus_TestCases_Sprint_12.xlsx |Sprint 12]]</center></td>
 +
</tr>
 +
<tr>
 +
<td><center>13</center></td><td><center>17/11/2017</center></td><td><center>[[Media:Plusminus_TestCases_Sprint13.xlsx |Sprint 13]]</center></td>
 
</tr>
 
</tr>
 
</table>
 
</table>

Latest revision as of 23:52, 17 November 2017


Plusminuslogo.png
PlusMinus Homepage.png

HOME

  PlusMinus About-us.png

ABOUT US

  PlusMinus projectOverview.png

PROJECT OVERVIEW

  PlusMinus Checklist.png

PROJECT MANAGEMENT

  PlusMinus Documentation.png

DOCUMENTATION

 
Persona Scenario Diagrams Test Results Plusminus Subplane.PNG Meeting Minutes Presentation



User Test 1 - Sprint 6 [COMPLETED]

Date of UT: 10 August 2017
Time of UT: 1.30pm - 3.30pm
Location: Ang Mo Kio Thye Hua Kwan Hospital
# of Users: 4
Roles Assigned: Super User (2), Course Creator (1), HR Admin (1)


Objectives:
1. To ensure that the portal is aligned with the requirements of the client
2. To receive feedback from client


Scope:
1. Login
2. eLearn - Courses
2. AI ChatBot


Documents:
- Download User Test Case: UT 1 Script
- Download Feedback Form: UT 1 Feedback
- Download User Test Slides: UT 1 PPT
- Access to Issues Log: Issue Log Google Sheet
- Download UT Results: UT 1 Results
- Download Meeting Minutes: UT 1 Meeting Minutes


User Test 2 - Sprint 9 [COMPLETED]

Date of UT: 20 September 2017
Time: 3.30pm to 6.30pm
Location: Ang Mo Kio Thye Hua Kwan Hospital
# of Users: 4
Roles Assigned: Super User (2), Course Creator (1), HR Admin (1)


Objectives:
1. To ensure that the newer functions developed is aligned with the requirements of the client
2. To receive feedback from client
3. To update client on team's progress


Scope:
1. Login
2. eLearn - Courses
3. AI ChatBot
4. eLearn - Quiz
5. Account Settings
6. User Management


Documents:
- Download User Test Case: UT 2 Script
- Download Feedback Form: UT 2 Feedback
- Download User Test Slides: UT 2 PPT
- Access to Issues Log: Issue Log Google Sheet
- Download UT Results: UT 2 Results
- Download Meeting Minutes: UT 2 Meeting Minutes



User Acceptance Test (UAT) - Sprint 13 [COMPLETED]

Date: 08 November 2017
Time: 3pm to 5pm
Location: Ang Mo Kio Thye Hwa Kuan Hospital
# of Users: 10


Objectives:
1. To ensure that all functions developed is aligned with the requirements of the client
2. To ensure that all bugs are found
3. To prepare for Handover/Sign-off


Scope:
1. eLearn (Course, Quiz, Learning Materials)
2.AI Chatbot
3. Account Settings
4. Resources/Content
5. User Management


Documents:
- Download User Acceptance Test Cases: UAT Script
- Download Feedback Form: UAT Feedback
- Download User Acceptance Test Slides: UAT PPT
- Access to Issues Log: Issue Log Google Sheet
- Download UT Results: UAT Results
- Download Meeting Minutes: UAT Meeting Minutes



Individual Sprint's Test Case
Test Plan: Download Test Plan

Sprint Date Test Case
1
-
2
18/06/2017
Sprint 2
3
02/07/2017
Sprint 3
4
16/07/2017
Sprint 4
5
30/07/2017
Sprint 5
6
13/08/2017
Sprint 6
7
27/08/2017
Sprint 7
8
10/09/2017
Sprint 8
9
24/09/2017
Sprint 9
10
08/10/2017
Sprint 10
11
22/10/2017
Sprint 11
12
05/11/2017
Sprint 12
13
17/11/2017
Sprint 13




User Test 1 - Unexecuted
Reasons to failure of UT Execution:
Meeting was used to discuss about the change in project scope.

Date: 27 Jun 2017
Time: 7.30pm
Location: SIS Meeting Room 4-1
# of Users: 4


Objectives:
1. Gather feedback on portal colour scheme and design
2. Check on the logic of Individual Approval Route Workflow


Scope:
1. Login
2. Individual Approval Workflow
3. Application of courses
4. Approval


You can download User Test Case here: User Test 1
You can download Feedback Survey Form here: Feedback UT 1