IS480 Team wiki: 2016T2 Technical Advantage FinalWiki
Revision as of 19:49, 11 April 2016 by Jh.ching.2013 (talk | contribs)
Main Wiki | Midterm Wiki | Final Wiki |
Contents
- 1 Project Summary
- 2 Scope Progress
- 3 Summary of Key Points
- 4 Change Management Highlights
- 5 Actual Schedule vs Planned Schedule
- 6 Current Usage
- 7 Completed Schedule
- 8 Previous Revisions
- 9 Effort Metrics
- 10 Bug Metrics
- 11 Risk Management
- 12 Technical Complexity
- 13 Score Multiplier Overview
- 14 Stable Matching Overview
- 15 User Testing Overview
- 16 Reflections and Learning Outcomes
Project Summary
Scope Progress
Summary of Key Points
- Shifting from a Local Office perspective to a platform meant for global use (300 to 16000 users) - Major structural code change
- Implementation of Periodic Matching over Free Matching
- Integration of Stable Matching Algorithm to improve matching formula
- Live User Testing conducted amongst 50 global users
- Progressive deployment efforts on sponsor's system
Change Management Highlights
Actual Schedule vs Planned Schedule
Actual Schedule
Current Usage
Completed Schedule
Previous Revisions
Effort Metrics
Bug Metrics
Risk Management
Technical Complexity
Do refer to slides 11-17 of our Midterm presentation document on the technical complexity of our proposed matching algorithm - [Midterm Presentation]
Score Multiplier Overview
Stable Matching Overview
If the image does not load properly, please click [Here]