Mid Terms Slides:

Team VI Mid Term Slides

Deployment Link:

Summary of Project

Our project iteration has 15 iterations. As at 18 February 2015, we are currently in 11th iteration of the project.

Our Development Progress

OUR PROJECT MANAGMENT

Project Scope

Planned Actual
Team VI Project Schedule.png Actualschedule.png

The full Change Management Log can be found here.

Project Schedule

Actualschedule.png

Project

  • Site went live and has been deployed to the enrichment center.
  • Complete change to the database to include attributes which are required for analysis.
  • Able to successfully send SMS and email notification to parents upon successfully marking student's attendance.
  • Conducted A/B Testing which gave us the go ahead to choose Version B as our user interface for parents portal.
  • Embarked on Gamification and Analytics for the enrichment center.

    Metrics

    Schedule Metric

    Team VI Schedule Metrics Graph.png

    Highlights of Schedule Metrics

    Iteration Planned (Days) Actual (Days) SM Score Action Status
    iteration planned actual % description Completed

    Bug Metrics

    Screen Shot 2016-02-14 at 2.09.58 pm.png

    Bug Count.png

    Iteration Bug Score Number of Issues Summary of Bugs and Issues Action Taken

    Project Risks

    Category Description Likelihood Impact Mitigation
    Project Management High High
    Technology Medium High To duplicate a copy

    The risks above have been managed and mitigated.

    Technical Complexity

    Technical Complexity 1: Rescheduling

    Deliverables

    Type Description Documentation
    Requirement Gathering Market Research Market Research
    Project Management Minutes, Metrics, Risks, Change

    Meeting Minutes
    Schedule & Effort Metrics
    Bug Metrics
    Risk Management
    Change Management

    Analysis and Design Use Case, ER Diagram, Technology and Tools Used Use Case & ER Diagram
    Analysis and Design Architectural Diagram, Technology and Tools Used Architectural Diagram & Technology and Tools Used
    Design Prototype
    Testing User Test Plan

    OUR QUALITY ASSURANCE

    User Testing

    Objective:

    • Gather feedback from students in SMU
    • Identify usability issues based on observations
    • Improve web application based on user testing results
    • Identify potential bugs that was not found during testing phase
    • Testing of functionality

    Users: 15 SMU Students, 4 IT Consultant, 1 Digital Marketing Consultant
    Venue: SMU , FYP Labs, Starbucks at Parkway
    Date: 4,5,6 Feb 2016
    Duration: 20 Minutes / User

    >Scope of User Testing 2

    • Branch Manager to successfully create a Parent and Student.
    • Branch Manager to create a schedule, and assign the student into a class
    • Teacher to mark the attendance of a student using the QR code
    • Teacher to create a feedback for the student
    • Parents to edit their own and child's information/li>
    • Parents to successfully receive an SMS, Email when their children has attended lesson
    • Parents to view the feedback given to their children by their teachers


    User Testing 2 Focus Group:

    • Branch Manager
    • Parent
    • Teacher


    User Testing 2 Results
    Likes Dislikes
    User Interface
    • Easy to Navigate
    • Users found it intuitive and could know exactly where to click
    • Application is useful for business owner
    • Yellow Colour theme too bright for some users
    Functionality
    • Creating of respective users are straightforward
    • Viewing of users are easily accessible by users
    • Creation of schedule is useful and easy for administrator and teacher
    • Marking Attendance with QR code is very interesting
    • SMS and email idea are very parent-centric, and parents will be more involved and aware of what is happening in the enrichment enter
    • Editing of parent details are easy
    • Should have a dropdown of NRIC for the administrator to choose from
    • Didn't like how we must create a diagnostic record in order to assign the student to a schedule
    • Results should be in A,B,C format instead of numerical
    • Have to remember the exact schedule event to assign the student to the schedule

    AB Testing

    Objective:

    • Compare two version of the web portal and identify the preferred version
    • Users to perform the task of viewing the students feedback
    • Improve aesthetics of web application
    • Participants Demographics:
    • 10 Actual Parents from the center
    • Experiment Design :
      Version A Version B
      VersionA.png
      VersionB.png
      Feedback is appended at the bottom after selection of each feedback. Users have to scroll up and down to view the feedback. Feedback is displayed in tabs. Can only view one feedback at a time

      Results For AB Testing can available at: AB Testing Results

      TEAM REFLECTION