OUR PROJECT PROGRESS
Mid Terms Slides
:here
Deployment Link
: https://is480z-lin9z.rhcloud.com/VI/
Project Highlights
OUR PROJECT MANAGMENT
About our Project
Our team aims to provide a web-based student monitoring system and business analysis tool for an enrichment centre, Explore and Learn Pte Ltd. Our project also aims to engage the students through gamification and encourage learning.
Summary of Project Progress
Project Status
Project Schedule
Planned | Actual |
---|---|
Project Scope
For Acceptance | For MidTerms |
---|---|
The full Change Management Log can be found here.
Metrics
Schedule Metric
Highlights of Schedule Metrics
Iteration | Planned (Days) | Actual (Days) | SM Score | Action | Status |
---|---|---|---|---|---|
14 | 18 | 78% | Underestimated time required, PM to re-estimate tasks for future iterations. Delayed due to bugs found. Team was unfamiliar with QR code scanning and email notification. Reduced 4 Days of Finals Break | Completed | |
14 | 20 | 70% | Underestimated time required, PM to re-estimate tasks for future iterations. Delayed due to the database changes required to mimic the business rules, wherey timeslot is not course unique and a teacher is able to teach more than 1 courses at the same time. Use 6 buffer days. | Completed |
Bug Metrics
Bug Metrics | Bug Count by Category |
---|---|
Highlights of Bug Metrics
Iteration | Bug Score | Number of Issues | Summary of Bugs and Issues | Action Taken |
---|---|---|---|---|
20 Low Impact Bugs & 2 High Impact Bugs | Most bugs are due to validation errors. | Developers stopped all current development and resolve the bugs. |
Project Risks
Category | Description | Likelihood | Impact | Mitigation | Mitigated |
---|---|---|---|---|---|
Client Management | Changing functional requirements | High | High | Project Manager adjusts schedule according to the client's requiremtns and apply change management controls. Developers to update the PM if the changes in requirements affact the project schedule. | Mitigated successfully |
Client Management | Hard to get real users to test our application | Medium | High | PM scheduled team members to go down to the centre at different times and conduct testing with the users. | Mitigated successfully |
Technical Complexity
Technical Complexity 1: Rescheduling
Currently, we are using the a frontend library called FullCalendar.io to display our schedules and classes. FullCalender.io has many API methods, but we are focusing on the recursive rendering method. Due to the business requirement for temporarily rescheduling, the recursive rerendering method in FullCalender.io cannot be used to fulfill the requirement. If a student wishes to temporary reschedule to another class, the student will be shifted to another date and the student will be rendered recursively on the changed date range instead due to its repeated schedule ID.
The team has came up with our own methods of generating schedule events that is linked to a particular schedule. These schedule events will instead contain the students that belong to this class, and each schedule event id will be unique. In this case, the student can then make a temporary reschedule of classes.
Technical Complexity 2: Database Structure
Before | After |
---|---|
In order to cater to temporary rescheduling, the database has to be design such in a way that stores each lesson as a unique event together with the attendances. It has differed a lot to our initial understanding and design to the database. Hence we have to rework on the entire data structure and auto create multiple schedule events in the backend according to the schedule. Furthermore, we also learnt that the tuition center has their unique set of course workbook for their students. It requires the system to keep track of the performance of each student on each work book. We used to link the result with the schedule as we define our schedule to be a joint table of teacher, student and course. However, since we made the change to allowed temporary reschedule, the result will have no correct table to join. Hence we purposely create a TeacherStudentCourse (TSC) table for the reporting module. We also included two attributes in the TSC table to keep track of the student current progress level for fast retrieval. And we also realize this data structure has the capability of tracking the results for multiple schedules for the same teacher, student and course.
Deliverables
Type | Description | Documentation |
---|---|---|
Requirement Gathering | Market Research | Market Research |
Project Management | Minutes, Metrics, Risks, Change |
Meeting Minutes |
Analysis and Design | Use Case, ER Diagram | Use Case & ER Diagram |
Analysis and Design | Architectural Diagram, Technology and Tools Used | Architectural Diagram & Technology and Tools Used |
Testing | User Test Plan | Test Plan |
OUR QUALITY ASSURANCE
User Testing 1
Objective:
- Gather feedback regarding the user interface from existing users
- Identify usability issues based on observations
- Improve web application based on user testing results
- Identify potential bugs that was not found during testing phase
Users: Wong Bing Xiang (Sponsor), Teacher
Venue: Upper Thomson
Date: 26/10/2015
Duration: 25 Minutes / User
Find out more about our User Testing 1 here
User Testing 2
Objective:
- Gather feedback from students in SMU
- Identify usability issues based on observations
- Improve web application based on user testing results
- Identify potential bugs that was not found during testing phase
- Testing of functionality
Users: 15 SMU Students, 4 IT Consultant, 1 Digital Marketing Consultant
Venue: SMU , FYP Labs, Starbucks at Parkway
Date: 4,5,6 Feb 2016
Duration: 20 Minutes / User
Participants Demographics:
Find out more about our User Testing 2 here
User Testing 3
Objective:
- Gather feedback from live users in Explore & Learn
- Identify usability issues based on observations
- Improve web application based on user testing results
- Identify potential bugs that was not found during testing phase
- Testing of functionality
Users: 1 Branch Manager, 2 Teachers, 15 Actual Students, 10 Parents
Venue: Explore & Learn Center
Date: 6,7 April 2016
Duration: 20 Minutes / User
Scope of User Testing 3
- Branch Manager to successfully create a Parent and Student.
- Branch Manager to create a schedule, and assign the student into a class
- Branch Manager to create a marketing campaign
- Branch Manager to view analysis of student
- Student To redeem a gift from the redemption portal
- Teacher to mark the attendance of a student using the QR code
- Teacher to create a feedback for the student
- Parents to edit their own and child's information/li>
- Parents to successfully receive an SMS, Email when their children has attended lesson
- Parents to view the feedback given to their children by their teachers
- Parents to view the performance over time analysis of their children results
User Testing 3 Focus Group:
- Branch Manager
- Parent
- Teacher
- Students
User Testing 3 Results
Likes | Dislikes | |
---|---|---|
|
| |
|
|