Project Progress Summary

Project Progress

  • Current sprint: Sprint 13
  • Sprint period: 31 March 2016 to 14 April 2016
  • Major milestone: Final Presentation

Project Highlights

Sirius map.png

Before the team accepted this project from our sponsor, the team was warned of the high technical complexity. Nonetheless, the team still accepted the project and took about 4 weeks to familiarize with Ruby on Rails and JavaScript. Along the way, there were new requirements given to the team. These were prioritised in collaboration with the Product Owner, and some modules like Admin and Mobile Device Experiments were added and completed, while Multi-page experiments, Multi-variant experiments and Visual Variation Editor were deprioritised and later dropped. We have also run experiments for 8 websites using Sirius AB. The team delivered 100% of the agreed-on scope as of 8 April 2016.

Project Challenges

There were several challenges split into different milestones.

Configuring variations and goals on our platform and then injecting them into the desired page through our snippet code
This was the first pain point that the team had to deal with. The team had to prove that this could be done by acceptance so as to proceed with this project. In order to ensure that this milestone is met, the team catered enough time for familiarisation with Ruby on Rails and JavaScript before implementation started.

Visual goal selection
There needs to be an easy way for users to configure goals, and that is through the visual goal selection. The team had to spent a lot of time studying an open-source library, Selector Gadget, in order to customise it to suit the needs of the system. The effort required was underestimated, but the team still managed to deliver this function on time.

Admin module
The system has to support admin account(s), which have to be able to manage all experiments and user accounts.This was challenging as the authentication library used, Devise, does not handle user management. Hence, the team had to spend more time delving deeper into Devise in order to override existing functions to provide user management features. As a result, the team had to reprioritise the planned scope, and drop modules accordingly (as explained in our change management).

Project Achievements

Methods, technologies, processes, teamwork, etc. which were particularly successful – highlight things which worked very well towards completing the project. A bulleted list of one to two sentences each will do. If there are no achievement, remove this section.

Following the scrum methodology has helped the team learn how to quickly adapt to changes in the project scope, and still be able to deliver a potentially shippable product at the end of each sprint. As every user story was crafted to suit the needs of the business, the team was always sure that there were no unnecessary features built. Having sprint reviews at the end of each sprint gave the team a tighter feedback loop, and any need for changes were only highlighted then. Consequently, scope creep was minimised, since the product owner had to prioritise tasks at every sprint review.

Project Management

Project Status

Team Sirius has delivered 100% of the agreed-on project scope to our sponsor.
Sirius project final status.jpeg

Midterm vs Final Scope

Midterm Final
Sirius scope v8.png

Siriu scope version v9.png

Team Sirius has completed all the modules that were promised to the sponsor. Sponsor was happy and satisfied with the scope delivered by the team. Due to the high complexity and limited time left, the team had decided to drop the Visual Variation Editor during sprint 11. The team consulted both the supervisor and product owner, and both agreed that the team should focus on improving the features completed, and not start on a module that may not be completable in time.

See our Project Scope page for more details on previous changes

Midterm vs Final Project Schedule


Sirius midterms schedule.png
Sirius final schedule.png There are no major changes to project schedule since the Midterm presentation. The team conducted its User Test 3 on 16-17 March. The buffer time in Sprint 12 was used to fix bugs and improve on the UI based on the feedback given by our sponsor and User Test 3 testers. Handover to our sponsor was completed on 8 April before the team's exams. As mentioned, Visual Variation Editor was dropped due to its high complexity and limited amount of time left. Lastly, the team has achieved its X-Factor of getting 8 websites to run experiments on our system.

Project Metrics

Team Velocity

Formula: Average of accepted stories points of 3 sprints
Sirius sprint velocity !3.png
Explanation: The average accepted story points is around 9 points for Sprint 11. Note that Sprint 10, 12 and 13 covered bug fixing and UI improvement activities, where each bug is logged as a story with 0 story point, and UI improvements do not have story points. Hence, there are no story points completed/accepted for those sprints.

Sprint Burndown

Formula:

  • Planned: Total planned story points over number of days in a sprint
  • Actual: Actual story points completed each day in a sprint

Burndown charts from some sprints since Midterm are highlighted here.
See our Midterm Wiki page for more details on sprints prior to Midterm.

Sirius burndown sprint 10.png
Explanation: There were no story points cleared in this sprint because we were fixing bugs and addressing points raised during Midterm presentation.


Sirius burndown sprint 11.png
Explanation: All planned bug fixes and stories were completed on time and before User Test 3.

Risk Management

Risk Type Risk Event Likelihood Impact Mitigation
Technical Risk Unable to develop WYSIWYG editor due to its high complexity High Medium Active feasibility checks and notify sponsor if there is a need to rescope the function


Explanation: This risk management was conducted after the Midterm Presentation as mentioned above. We worked with the sponsor to scope down and prioritise a smaller subset of the WYSIWYG editor features. While we agreed at the end of sprint 10 to scope down and prioritise the move/rearrange feature, after further investigation during sprint 11, we found that it was not feasible to complete with the remaining time. We eventually negotiated with the sponsor to drop this function.
See our Risks page for the full list of potential risks

Unaccepted Stories of Each Sprint

Sirius midterm scrum.png
Explanation: If there are any bugs found at any point in time during the sprint, the bug is logged as a story with 0 points. If the bug impedes progress or prevents the team from delivering a shippable product, it will be prioritised and fixed immediately. If it does not impede progress, it will be prioritised together with the product backlog at the start of the next sprint. See our Stories page for each sprint's user stories.

Technical Complexity

Describe and list the technical complexity of your project in order of highest complexity first. For example, deploying on iPhone using Objective-C, customizing Drupal with own database, quick search for shortest flight path, database structure, etc.

Quality of Project

Project Deliverables

Stage Specification Modules
Project Management Meeting Minutes Internal, Supervisor & Sponsor Meeting Minutes
Project Schedule Project Schedule
Metrics Project Metrics
Risk Management Risk Management
Requirements Project Scope Project Scope
User Stories User Stories
Analysis Persona and Scenario Persona & Scenario
Market Research Market Research
Architectural Design Architectural Design
Design Prototypes Mid & High Fidelity Prototypes
Testing User Test Plan & Results User Test Plan & Results
Project Handover Introduction Slides Delivered via private folder on Google Drive
User Manual User Manual
Developer Manual Delivered via private folder on Google Drive
Style Guide Delivered via private folder on Google Drive
Source Code Delivered via private folder on Google Drive

Quality

Explain the quality attributes (non functional) of your project deliverables. Have you designed the architecture, use a design pattern, etc? Does your architecture address scalability, performance, reliability, availability, fault tolerance, usability, etc. Does your design address maintainability, flexibility, configurability, etc. Be brief here but you can link to diagrams or code detail pages. Do not repeat the technical complexity part, link to it if necessary.

Performance: Our JavaScript snippet containing the supporting libraries, our snippet code, and the experiment configuration data is served to every website visitor. To reduce the impact on website load time, we enabled GZip compression on the Nginx webserver that is in front of the app server. This brought the typical snippet size down from 121 KB to 42 KB (65% decrease in filesize).

Also, our JavaScript snippet is designed to further minimise the impact on page load time by default. When the snippet is loaded by the browser in the page <head>, it is being executed in synchronous mode on the rendering critical path. Therefore, we ensure that only the absolutely required work of checking for debug/mode flag and attaching two event handlers is done then. All other work is deferred to after the page's DOM is fully loaded, at which point the remaining code is run asynchronously without blocking page load.

Maintainability:  

Usability:  

Deployment

Deployed site: http://sirius.lol (User Manual)

This site is running 'live' on an EC2 instance inside the sponsor's Amazon Web Services account.

Testing

User Test 1

Venue: IDA
Date: 30 Oct 2015, Friday
Time: 3.00pm
Duration: ~25 minutes
Number of Participants: 2
User Test: Tester Instructions
User Test Results: Test Results

User Test 2

Venue: IDA
Date: 4 Feb 2016, Thursday
Time: 9.30am
Duration: ~45 minutes
Number of Participants: 4
User Test: Tester Instructions
User Test Results: Test Results

User Test 3

Venue: SMU SIS IS480 Lab
Date: 16 Mar 2016, Thursday and 17 Mar 2016, Friday
Time: 11.30am
Duration: ~60 minutes
Number of Participants: 29
User Test: Tester Instructions
User Test Results: Test Results

UI Fixes based on User Test 3

Reflection

Team Reflection

Team Sirius

The journey so far has been tough but a great learning experience for Team Sirius. We have learnt about each other’s strengths and weaknesses, and worked towards complementing each other, producing quality work. We also saw the value of performing more in-depth research before diving into implementing a particular solution.

Supervisor Testimonial

Mr Prakash:
Team Sirius with Supervisor, Mr Prakash.

The world has entered a digital era and businesses are experiencing a paradigm change in the ways they reach out to customers and make sales. With every business aspiring to go online it is imperative that the businesses know what will appeal to their customers and the solution is A/B testing and data analytics. This projects adds value to conventional A/B testing by bringing in more flexibility to business in the ways an experiment is configured and therefore I see good potential in the work done by team Sirius to be adapted by industry. All the best!

Team Sirius with Sponsor, Eyung and Product Owner, Jean
Jean:

Team Sirius produces good quality of work, and provides regular updates on the progress on the product development. The team is strong in technical, and is willing to explore ways on improving the user experience design on the product.

Eyung:

Individual Reflection

Alex:
It is not easy dealing with people outside of our team, especially when trying to reach out for real users and convincing them that web AB testing is worth their time.
Chiang Fong:
I have learnt that software estimation is more difficult than I expected, both in terms of estimating the time and effort required for user stories, as well as how much we can get done in a sprint.
Kathy:
I have learnt to appreciate how scrum and its sprint reviews enable a better change management process for a real project - where real business requirements were provided.This has helped the team better manage their workload and at the same time deliver quality work and value to our sponsors.
Kenny:
I started off wanting to attain a greater understanding of the Rails platform, but my role as the frontend lead has instead made me appreciate the sheer complexity of interactions between Javascript, CSS and HTML in the modern web browser. The number of things that can be done on the client side just keeps increasing
Lai Ho:
Creating and conducting user testing has challenge me to a higher level that has enhanced my learning and interest in user experience.