Difference between revisions of "IS480 Team wiki: 2016T1 PolyVision Midterm"

From IS480
Jump to navigation Jump to search
Line 305: Line 305:
  
 
<b>User Testing 2:</b><br>
 
<b>User Testing 2:</b><br>
[[IS480 Team wiki: 2016T1 PolyVision UT2 | <u>Click here for more detail on our UT2</u>]]<br>
+
[[IS480 Team wiki: 2016T1 PolyVision UT2 | <u>Click here for more details on our UT2</u>]]<br>
 
<li><b>Date: </b>13th, 15th & 16th Sep<br></li>
 
<li><b>Date: </b>13th, 15th & 16th Sep<br></li>
 
<li><b>Users: </b>2 DBS VGP users, 36 SMU students<br></li>
 
<li><b>Users: </b>2 DBS VGP users, 36 SMU students<br></li>

Revision as of 00:56, 28 September 2016

INSIGHT


Home About Us Project Overview Project Management Project Documentation


Midterm


Project Progress Summary

Deployed URL: https://vgpinsight.com
Midterm Deck: Coming Soon...

Project Highlights

  1. INSIGHT has been deployed and ready for clients to use since 20th September 2016
  2. Concluded UAT with 35 SMU students on 16th September 2016
  3. Tested & verified INSIGHT functionalities with sponsors on 14th September 2016
  4. Picked up interactive visualization tool - D3.js
  5. Constantly aligning INSIGHT development according to business needs (translating feedback into actions)

Project Management

Project Status

S/N Module Description Confidence (%) Status
1 Administrator Fully deployed and tested on production server 100% Completed
2 User Account Fully deployed and tested on production server 100% Completed
3 Company Management Fully deployed and tested on production server 100% Completed
4 Deal Management Fully deployed and tested on production server 100% Completed
5 Dashboard Fully deployed and tested on production server 100% Completed
6 VC Management Fully deployed and tested on production server 100% Completed
7 Event-Triggered Notification Fully deployed and tested on production server 100% Completed
8 Custom Notification Fully deployed and tested on production server 100% Completed
9 Reporting Fully deployed and tested on production server 100% Completed
10 Newsfeed Fully deployed and tested on production server 100% Completed
11 Backup Fully deployed and tested on production server 100% Completed
12 Search Accepted change request 100% Future Development
13 Name Card Recognition Future Development 100% Future Development
14 Usability Future Development 100% Future Development
15 Workflow History Removed upon negotiation N.A. Removed upon negotiation
16 Usability Removed upon negotiation N.A. Removed upon negotiation


Project Schedule

Plan Actual
INSIGHT Original Scope
INSIGHT Latest Scope
INSIGHT Original Timeline
INSIGHT Latest Timeline

Project Metrics

Test

Project Risks

Test

Technical Complexity

Frontend Technical Complexities
Rank Complexity Reason Solution
1
2
3


Backend Technical Complexities
Rank Complexity Reason Solution
1
2
3



Quality of Product

Intermediate Deliverables

Stage Specifications Work Products
Project Management Schedule Management A customized spreadsheet is maintained by the PM that is revised at the beginning of each Iteration ensuring that tasks are being completed.
Risk Management
Change Management Change requests are raised after every meeting with the sponsor at the end of each Iteration. These requests are maintained within a spreadsheet then evaluated as a team on the priority, complexity before being included in the schedule by the PM.
Meeting Minutes All meetings with the sponsor, supervisor, and team are being documented at:

Meeting Minutes

Metrics Metrics
Design Diagrams Use Case, Class Diagram, Sequence Diagram, As-Is Process Diagram, To-Be Process Diagram Use Case
Class Diagram
Sequence Diagram
As-Is Process Diagram
To-Be Process Diagram
Prototype Paper Prototype
Hi-fidelity Prototype
Testing User Test Plan User Testing 1

User Testing 2

Deployment

INSIGHT application can be found at this URL: https://vgpinsight.com

Note: Please ensure that you are using the latest version of Google Chrome browser with Javascript enabled to enjoy the full INSIGHT experience.

Testing

We have conducted one user testing.

User Testing 2:
Click here for more details on our UT2

  • Date: 13th, 15th & 16th Sep
  • Users: 2 DBS VGP users, 36 SMU students
  • Scope: Account module, company management module, file upload module, deal management module
  • Reflections

    PolyVision

    Collectively, Team PolyVision have a better understanding of their individual capabilities and limitations. The team has managed to pick up ASP .NET Razor markup language as a result of having every member responsible and accountable for a portion of INSIGHT application to foster greater ownership. And when the occasion arise that business needs are not fully aligned with the initial set of requirements, effective communication is paramount to align every stakeholder involved.

    Fusen Li

    As the Backend Developer of PolyVision,

    Joleen Lee

    As the Frontend Developer of PolyVision,

    Jonathan Lee

    As the Project Manager of PolyVision, I learn that it is important to grasp the optimum working preference and environment for the team to be productive. Most importantly, it is to enforce the above to ensure that the team can work more efficiently together.

    Kong Song Wei

    As the Database Architect of PolyVision,

    Ong Wee Tiong

    As the Backend Developer of PolyVision,