Difference between revisions of "IS480 Team wiki: 2016T1 FitNexx6 Testing"
m |
|||
Line 41: | Line 41: | ||
| style="vertical-align:top;width:25%;" | <div style="padding: 3px; text-align:center; line-height: wrap_content; font-size:22px"> [[IS480 Team wiki: 2016T1 FitNexx6 Testing UT1| <b><span style="color:#761024"><font face="Century Gothic">User Testing 1</font></span></b>]] | | style="vertical-align:top;width:25%;" | <div style="padding: 3px; text-align:center; line-height: wrap_content; font-size:22px"> [[IS480 Team wiki: 2016T1 FitNexx6 Testing UT1| <b><span style="color:#761024"><font face="Century Gothic">User Testing 1</font></span></b>]] | ||
+ | | style="vertical-align:top;width:25%;" | <div style="padding: 3px; text-align:center; line-height: wrap_content; font-size:22px"> [[IS480 Team wiki: 2016T1 FitNexx6 Testing UT2| <b><span style="color:#761024"><font face="Century Gothic">User Testing 2</font></span></b>]] | ||
|} | |} | ||
| |
Revision as of 19:14, 4 October 2016
General Test Plan
Objectives
- Testing Objective
- Testing Scope
- Feature
Testing Objective
The scope of each user testing and user acceptance testing conducted is based on the functionalities completed up till that point in time. The aim of the testing is to identify bugs and gather feedback to enhance the application before it is launch into the market. We will be developing a fitness application for Ngee Ann polytechnic student on android and IOS platform and a web based portal for the admin to self manage the app after the application hand over.
Testing Scope
The products will be tested in the 3 user testing conducted: User testing 1: Android devices, targeting the Lollipop and Marshmallow versions. User testing 2: Android devices, targeting the Lollipop and Marshmallow versions and all IOS devices, Admin portal User testing 2: Android devices, targeting the Lollipop and Marshmallow versions and all IOS devices, Admin portal
The admin portal will be tested on several different browsers to ensure performance is consistent. The list of browsers compatible is as follows:
Browsers
- Google Chrome
- Safari
- Internet Explorer
- Firefox
Resources
The Lead Quality Assurance will be in charge of all the testing related documents. It includes use cases, bug metrics, bug tracking document and test plans.