Difference between revisions of "IS480 Team wiki: 2015T6 6nificance Final Wiki"
Jump to navigation
Jump to search
Sanjayn.2013 (talk | contribs) |
Sanjayn.2013 (talk | contribs) |
||
Line 35: | Line 35: | ||
=<div style="background: #34454c; padding: 15px; font-weight: bold; line-height: 0.3em; text-indent: 15px; font-size: 22px"><font color=#FFFFF>Project Progress Summary</font></div>= | =<div style="background: #34454c; padding: 15px; font-weight: bold; line-height: 0.3em; text-indent: 15px; font-size: 22px"><font color=#FFFFF>Project Progress Summary</font></div>= | ||
<font size=4><b>Final Presentation Slides</b>: [[IS480 Team wiki:Download 6nificance Final Presentation Slides|Download 6nificance Final Presentation Slides]]</font> | <font size=4><b>Final Presentation Slides</b>: [[IS480 Team wiki:Download 6nificance Final Presentation Slides|Download 6nificance Final Presentation Slides]]</font> | ||
− | <br> | + | <br> |
− | |||
<h2>Project Highlights</h2> | <h2>Project Highlights</h2> | ||
+ | *DIY nail polish kit is removed as project sponsor highlighted issues with finding suppliers for the DIY kit | ||
+ | *Project sponsor not confident of producing nail polishes within project timeline due to difficulties with sourcing good quality materials | ||
+ | *Users will instead express interest in the color of nail polish and receive it once sponsor is ready to deliver | ||
+ | *Team proposed that application be more social media focused in order to encourage active usage and interests which sponsor agreed and accepted | ||
+ | *Team decided to revamp the whole UI of application to make it look more social media centric. These changes were done in iterations 6 and 7: | ||
+ | **Removal of navigation drawer & interlinked rest of application features with social module | ||
+ | **Created new high-fi prototypes & conducted heuristic evaluation before actual coding for revamp | ||
<br> | <br> | ||
<h2>Project Challenges</h2> | <h2>Project Challenges</h2> |
Revision as of 10:44, 22 November 2015
Main Wiki | Midterm Wiki | Final Wiki |
Project Progress Summary
Final Presentation Slides: Download 6nificance Final Presentation Slides
Project Highlights
- DIY nail polish kit is removed as project sponsor highlighted issues with finding suppliers for the DIY kit
- Project sponsor not confident of producing nail polishes within project timeline due to difficulties with sourcing good quality materials
- Users will instead express interest in the color of nail polish and receive it once sponsor is ready to deliver
- Team proposed that application be more social media focused in order to encourage active usage and interests which sponsor agreed and accepted
- Team decided to revamp the whole UI of application to make it look more social media centric. These changes were done in iterations 6 and 7:
- Removal of navigation drawer & interlinked rest of application features with social module
- Created new high-fi prototypes & conducted heuristic evaluation before actual coding for revamp
Project Challenges
Project Achievements
Project Management
Project Scope
Midterms | Final |
---|---|
[[|500px|center|link=]] |
Scope Changes
Project Timeline
Planned | Actual |
---|---|
Schedule Highlights
- Removed
Project Metrics
Schedule Metrics
Iteration | Planned Duration (Days) | Actual Duration (Days) | Schedule Metric Score | Action Taken | Status |
---|---|---|---|---|---|
5 | 14 | 16 | 0.88 | More time needed to complete Update Profile function due to difficulties with uploading images to cloud database. Follow up action: Informed supervisor about delay. Re-scheduled the dates and tasks of iteration 6. Reduced duration of iteration 6 from 14 days to 12 days. More coding hours per day were allocated in iteration 6. |
Completed |
6 | 12 | 14 | 0.86 | More time needed to research and complete Social Module due to complexity with creating a new social media platform from scratch. Follow up action: Informed supervisor about delay. Re-scheduled the dates and tasks of iteration 7. Removed 2 buffer days in iteration 8. |
Completed |
7 | 14 | 16 | 0.88 | More time needed to debug bugs found in newsfeed and view color hashtag of social module Follow up action: Informed supervisor about delay. Reduced duration of iteration 8 from 9 days to 7 days. |
Completed |
View Our Schedule Metrics Here!
Bug Metrics
Iteration | Bug Score | Bug Summary | Action Taken |
---|---|---|---|
5 | 17 2 Low 3 High |
3 high bugs were due to profile picture not being shown due to problems with uploading images to Cloud Database. | Resolve bugs immediately. End date of iteration 5 is delayed. PM to reschedule end dates and tasks of iteration 6. |
6 | 21 1 Low 2 High 1 Critical |
1 critical bug was due to app cash when newsfeed refresh is attempted without internet connection. 2 high bugs were due to number of likes and color hashtags not being accurately recorded in database. | Resolve bugs immediately. End date of iteration 6 is delayed. PM to reschedule end dates and tasks of iteration 7. |
7 | 29 4 Low 5 High |
5 high bugs were due to wrong user profile picture being displayed in the newsfeed, incorrect number of posts sometimes being displayed on user profile and incorrect color tags shown in each post. | Resolve bugs immediately. End date of iteration 7 is delayed. PM to reschedule end dates and tasks of iteration 8. |
Project Risks
Risk Description | Category | Impact | Mitigation Strategy |
---|---|---|---|
Digital color in application may not match the physical color of nail polish. | High | Users may end up dissatisfied and no longer use the application. | Before ordering, a message will be displayed in the application. It will state that a money-back guarantee is provided if users do not think their nail polish color match with their requested color. |
Team is unfamiliar with android development. | High | Project may be potentially delayed due to time spent on learning. Initial quality of application may be affected as there may be more bugs. | PM has allocated more time to Iteration zero to learn about android development. |
Sponsor not confident of delivering within project timeline. | High | Users may not be encouraged to use the application since their desired nail polish may not be ready. | Team proposed that social module be the first item that users see to encourage them to actively use the application which sponsor agreed and accepted. |
Technical Complexity
Quality of Product
Intermediate Deliverables
Stage | Specification | Modules |
---|---|---|
Project Requirements | Market Research | Market Research |
Project Management | Minutes | Minutes |
Metrics | Schedule Metrics Task Metrics Bug Metrics | |
Risk | Risks | |
Change Management | Change Management | |
Analysis | Use Case Diagram System Sequence Diagram Architecture Diagram |
Diagrams |
Design | Low-Fi Prototype High-Fi Prototype |
UI Prototype |
Testing | User Testing 1 | User Testing 1 |
Heuristic Evaluation | Heuristic Evaluation | |
User Testing 2 | User Testing 2 |
Quality
Deployment
- Google Play Store Link: https://play.google.com/store/apps/details?id=sozoco.co.naildeck
- Deployed Back-End Admin Website Link: http://1-dot-naildeckadminportal-1042.appspot.com/
Testing
User Testing | Date | Venue | Users | Link |
---|---|---|---|---|
User Testing 1 | 08 Aug 2015 | Based on testers' convenience | 14 Female (Age 14-24 years old) 2 Male (Age 14-24 years old) |
User Testing 1 |
Heuristic Evaluation | 12 Sept 2015 | SMU | 4 SMU female students | Heuristic Evaluation |
User Testing 2 | 02 Oct 2015 | SMU | 21 Females | User Testing 2 |
Reflection
Team Reflection
- Deeper insights into the world of colors
- Gained real-life experience of building a social media platform from scratch
- Experience in mobile application development and Google Services
Individual Reflection
Name | Reflections |
---|---|
Sanjay Nelagadde |
|
Ng Kiat Keng |
|
Lim Ting Zhi |
|
Chua Feng Ru |
|
Foo Yee Cheng |
|
Lim Yu Xiang Bendexter |