Line 66: Line 66:
 
*Scheduled handover after final presentation, prepared to conduct proper handover of documentations to Anil (Owner of Platinum Yoga)
 
*Scheduled handover after final presentation, prepared to conduct proper handover of documentations to Anil (Owner of Platinum Yoga)
 
**Informed client that support and maintenance of application is not part of the scope for IS480 project
 
**Informed client that support and maintenance of application is not part of the scope for IS480 project
 
  
 
===Milestones Completed:===
 
===Milestones Completed:===

Revision as of 15:45, 2 April 2015

TinkersBanner.jpg


HOME

 

TEAM

 

PROJECT OVERVIEW

 

PROJECT MANAGEMENT

 

PROJECT DOCUMENTATION

 
Main Wiki Midterm Wiki Final Wiki

______________________________________________________________________________________________________________________________________________

Links and Slides

  • View our Midterm slides here
  • View our deployed application in Google Play:Platinum Yoga

Project Progress Summary

Current Iteration: 8 (11/11/2014 - 21/11/2014)

  • Till date of 20/11/2014, we have completed 100% of our project
  • We have done a total of 2 User Tests involving real users

Project Highlights:

  • Scope of the project has been updated:
  1. Two features are dropped to allow team to focus on improving the application's user interface.
    1. Analytics for Yogapedia was dropped
    2. Push Notification was dropped
  2. Two new features are added.
    1. Integration with Google Calendar (after a student has booked a class,the booking will automatically sync with the user's calendar)
    2. Location Selector (enable students to make bookings from 2 branches, namely Marine Parade and Suntec City)
  • Completed a user testing with 15 Platinum Yoga students
  • Scheduled handover after final presentation, prepared to conduct proper handover of documentations to Anil (Owner of Platinum Yoga)
    • Informed client that support and maintenance of application is not part of the scope for IS480 project

Milestones Completed:

  • Proposal Submission
  • Acceptance Presentation
  • User Test 1
  • Release 1
  • User Test 2
  • Poster Submission
  • Final Presentation

Milestones Remaining:

  • Poster Day

Project Achievements

  • Successfully implemented all core functions of the application
  • Successfully achieved our midterm X-Factor with the proper implementation of Yogapedia
  • Successfully conducted 2 user testings with clients from Platinum Yoga