Difference between revisions of "IS480 Team wiki: 2015T2 Team Elements Midterm Wiki"
Jy.thai.2013 (talk | contribs) |
Jy.thai.2013 (talk | contribs) |
||
Line 148: | Line 148: | ||
! style="background: #354458; color: white; font-weight: bold; width:250px" | Action Taken | ! style="background: #354458; color: white; font-weight: bold; width:250px" | Action Taken | ||
|- | |- | ||
− | | | + | |4 |
− | |<b> | + | |<b>33</b> <br> 2 High <br> |
− | | | + | |There was a problem with iron router during deployment. It worked on our local host but not on the deployment server. |
|Stop current development and resolve the bug immediately. Project Manager reschedules the project. | |Stop current development and resolve the bug immediately. Project Manager reschedules the project. | ||
|- | |- | ||
− | | | + | |5 |
− | |<b>32</b> <br> | + | |<b>32</b> <br> 1 High <br> |
− | | | + | |Meteor underwent a version change and this new version was buggy, causing compatibility issues and the application could not run. |
|Stop current development and resolve the bug immediately. Project Manager reschedules the project. | |Stop current development and resolve the bug immediately. Project Manager reschedules the project. | ||
|- | |- | ||
− | | | + | |8 |
− | |<b> | + | |<b>17 (so far)</b> <br> 1 High <br> |
− | | | + | |Due to a confusion in the template names, the options at the side bar were gone |
− | | | + | |Stop current development and resolve the bug immediately. Project Manager reschedules the project. |
|- | |- | ||
Line 167: | Line 167: | ||
<h3>Project Risks</h3> | <h3>Project Risks</h3> | ||
− | [[ | + | [[IS480_Team_wiki:2015T2 Team Elements Risk Management|View our risk management here!]] |
{| class="wikitable" style="margin: auto;width:90%; text-align:center; background: white;" | {| class="wikitable" style="margin: auto;width:90%; text-align:center; background: white;" | ||
! style="background: #354458; color: white; font-weight: bold; width:50px" | No | ! style="background: #354458; color: white; font-weight: bold; width:50px" | No | ||
Line 202: | Line 202: | ||
<h3>Technical Complexity</h3> | <h3>Technical Complexity</h3> | ||
− | <h4> | + | <h4>Generation of Certificates</h4> |
* Sterling needs to generate certificates for pupils who have completed their courses | * Sterling needs to generate certificates for pupils who have completed their courses | ||
* Populate certs in a given format and exporting them to pdf for printing | * Populate certs in a given format and exporting them to pdf for printing | ||
− | [[File:Elements cert generation.png| | + | [[File:Elements cert generation.png|500px]] |
* The above image is generated from the class list | * The above image is generated from the class list | ||
Line 227: | Line 227: | ||
! style="background: #354458; color: white; font-weight: bold; width:50px" | Project Management | ! style="background: #354458; color: white; font-weight: bold; width:50px" | Project Management | ||
| Minutes | | Minutes | ||
− | | [[ | + | | [[IS480_Team_wiki:2015T2 Team Elements Meeting Minutes | Meeting Minutes]] |
|- | |- | ||
! style="background: #354458; color: white; font-weight: bold; width:50px" | Project Management | ! style="background: #354458; color: white; font-weight: bold; width:50px" | Project Management |
Revision as of 19:46, 18 February 2016
Main Wiki | Midterm Wiki | Final Wiki |
Project Progress Summary
ContentsMidterm slides
Deployed Link: Project HighlightsOur project schedule is divided into 12 iterations.
Development ProgressStatus: 80%
Project Management
Project Scope
Major Scope changes
View our Change Management Here! Project ScheduleView detailed Project Schedule here!
Schedule Highlights
MetricsSchedule MetricsView our Schedule Metrics Here! Schedule Metrics Highlights
Bug MetricsBug Score
Project RisksView our risk management here!
The above two risks has been mitigated.
Technical ComplexityGeneration of Certificates
Excel Read&Write
|
Stage | Specification | Modules |
---|---|---|
Project Requirements | Story boards | Purpose and Motivation |
Project Management | Minutes | Meeting Minutes |
Project Management | Metrics, Risks, Change |
Schedule Metrics |
Analysis and Design | DB Diagram, As-Is, To-Be Processes | DB Diagram, As-Is, To-Be Processes |
Design | Prototype | Persona and Prototype |
Testing | User Test Plan |
Deployment
Deployed Link:
Testing
We have conducted two user testing and one heuristic evaluation.
heuristic Evaluation
- Venue: Singapore Management University, School of Information Systems
- 5 participants
- This is to learn more about the usability of our application and improve it further in our future designs. This was conducted with a paper prototype. A paper prototype was used because we want to be able to discover UI issues early, so that the cost of changing will not be so high.
View our Heuristics Evaluation documentation here!
User Testing 1
- Date: 10 October 2014
- Venue: Sterling Engineering Training Hub
- 1 Academic One Administrator
- 2 Cerealtech School Of Baking Technology Administrator
- 1 administrator from CSIS Industries Administrator
View our UT1 documentation here!
User Testing 2
- Date: 29 January 2015
- Venue: Sterling Engineering Training Hub
- 3 Sterling Engineering Training Hub Administrators
View our UT2 documentation here!
Reflections