Difference between revisions of "IS480 Team wiki: 2015T2 Team Elements Midterm Wiki"
Jy.thai.2013 (talk | contribs) |
Jy.thai.2013 (talk | contribs) |
||
Line 180: | Line 180: | ||
|- | |- | ||
| 1 | | 1 | ||
− | | | + | | Sponsor changes requirements on an ad hoc basis |
| Project schedule will be affected | | Project schedule will be affected | ||
| Medium | | Medium | ||
| Medium | | Medium | ||
| B | | B | ||
− | | Team to evaluate | + | | Project Manager and Business Analyst to work with sponsor closely to monitor and modify the team plan after every iteration. Team to evaluate on a case-by-case basis |
|- | |- | ||
| 2 | | 2 | ||
− | | Unable to get | + | | Unable to get the administrators to test the system as the training facility is still being built |
− | | Unable to get genuine feedback from | + | | Unable to get genuine feedback from users and hence affect the usability of the system |
| High | | High | ||
| High | | High | ||
| A | | A | ||
− | | | + | | Project manager will work closely with the sponsor to source for similar training facilities and conduct observations and tests with them. <br> |
+ | Project Manager to work closely with sponsor to plan each functions. | ||
|- | |- | ||
Line 203: | Line 204: | ||
<h3>Technical Complexity</h3> | <h3>Technical Complexity</h3> | ||
− | <h4> | + | <h4>Gerneration of Certificates</h4> |
− | * | + | * Sterling needs to generate certificates for pupils who have completed their courses |
− | * Populate | + | * Populate certs in a given format and exporting them to pdf for printing |
[[File:WP PDFRecognition.png|900px]] | [[File:WP PDFRecognition.png|900px]] | ||
− | * | + | * The above image is generated from the classlist |
− | <h4> | + | <h4>Excel Read&Write</h4> |
[[File:WP Responsive HowItWorks.png|800px]] | [[File:WP Responsive HowItWorks.png|800px]] | ||
[[File:WP Responsive Functions.png|800px]] | [[File:WP Responsive Functions.png|800px]] | ||
− | * | + | * For the convenience of the trainer, the trainer can download a copy of the class list into excel and use it to fill up the class' grades and attendance. |
==<div style="background: #354458; padding: 15px; font-weight: bold; line-height: 0.3em; text-indent: 15px; text-transform:lowercase;letter-spacing:-0.08em;font-size:20px"><font color=#FFFFF>Quality of Product</font></div>== | ==<div style="background: #354458; padding: 15px; font-weight: bold; line-height: 0.3em; text-indent: 15px; text-transform:lowercase;letter-spacing:-0.08em;font-size:20px"><font color=#FFFFF>Quality of Product</font></div>== | ||
Line 229: | Line 230: | ||
! style="background: #354458; color: white; font-weight: bold; width:50px" | Project Management | ! style="background: #354458; color: white; font-weight: bold; width:50px" | Project Management | ||
| Minutes | | Minutes | ||
− | | [[ | + | | [[IS480_Team_wiki:2015T2 Team Elements Meeting Minutes|Meeting Minutes]] |
|- | |- | ||
! style="background: #354458; color: white; font-weight: bold; width:50px" | Project Management | ! style="background: #354458; color: white; font-weight: bold; width:50px" | Project Management |
Revision as of 18:57, 18 February 2016
Main Wiki | Midterm Wiki | Final Wiki |
Project Progress Summary
ContentsMidterm slides
Deployed Link: Project HighlightsOur project schedule is divided into 12 iterations.
Development ProgressStatus: 80%
Project Management
Project Scope
Major Scope changes
View our Change Management Here! Project ScheduleView detailed Project Schedule here!
Schedule Highlights
MetricsSchedule MetricsView our Schedule Metrics Here! Schedule Metrics Highlights
Bug MetricsBug ScoreBug Distribution based on Severity
Project RisksView our risk management here!
The above two risks has been mitigated.
Technical ComplexityGerneration of Certificates
Excel Read&Write
|
Stage | Specification | Modules |
---|---|---|
Project Requirements | Story boards | Story board |
Project Management | Minutes | Meeting Minutes |
Project Management | Metrics, Risks, Change |
Schedule Metrics |
Analysis and Design | Use Case, ER Diagram, As-Is, To-Be Processes, Sequence Diagrams | Use Case, ER Diagram, As-Is, To-Be Processes, Sequence Diagrams, Use Case Description |
Design | Prototype | Persona and Prototype |
Testing | User Test Plan |
Deployment
Deployed Link: http://hsemr-wpinapp.rhcloud.com/hsemr
Testing
We have conducted two user testing and one heuristic evaluation.
heuristic Evaluation
- Venue: Singapore Management University, School of Information Systems
- 5 participants
- This is to learn more about the usability of our application and improve it further in our future designs. This was conducted with a paper prototype. A paper prototype was used because we want to be able to discover UI issues early, so that the cost of changing will not be so high.
View our Heuristics Evaluation documentation here!
User Testing 1
- Date: 10 October 2014
- Venue: Ngee Ann Polytechnic, School of Health Sciences
- 1 Academic One Administrator
- 2 Cerealtech School Of Baking Technology Administrator
- 1 administrator from CSIS Industries Administrator
View our UT1 documentation here!
User Testing 2
- Date: 29 January 2015
- Venue: Sterling Engineering Training Hub
- 3 Sterling Engineering Training Hub Administrators
View our UT2 documentation here!
Reflections