<h3>Metrics</h3> | <h3>Metrics</h3> | ||
<h4>Schedule Metrics</h4> | <h4>Schedule Metrics</h4> | ||
− | [[ | + | [[IS480_Team_wiki: 2015T2 Team Elements Schedule Metrics|View our Schedule Metrics Here!]]<br> |
− | [[Image: | + | [[Image:Elements Schedule Metrics.jpg|800px|center|link=]] |
<h5>Schedule Metrics Highlights</h5> | <h5>Schedule Metrics Highlights</h5> | ||
Line 121: | Line 121: | ||
! style="background: #354458; color: white; font-weight: bold; width:50px" | Status | ! style="background: #354458; color: white; font-weight: bold; width:50px" | Status | ||
|- | |- | ||
− | | | + | |4 |
|14 | |14 | ||
− | | | + | |17 |
− | | | + | |82% |
− | | | + | |The team is behind schedule.Under-estimated the effort required. Re-estimate tasks for future iterations. |
− | Delayed | + | |
+ | |||
+ | Delayed due to the potential change in sponsor and the team was changing some aspects of the interface after acceptance presentation. | ||
− | Follow up action: Iteration | + | Follow up action: Iteration 4 was delayed by 3 days. However, the following iteration started after the exam break. No buffer day is used. |
|Completed | |Completed | ||
|- | |- | ||
Line 135: | Line 137: | ||
<h4>Bug Metrics</h4> | <h4>Bug Metrics</h4> | ||
− | [[IS480 Team wiki: | + | [[IS480 Team wiki: IS480_Team_wiki:2015T2 Team Elements Bug Metrics|View our Bug Metrics here!]]<br> |
<h5>Bug Score</h5> | <h5>Bug Score</h5> | ||
[[Image: WP_BugMetrics.png|800px|center|link=]] | [[Image: WP_BugMetrics.png|800px|center|link=]] |
Revision as of 18:47, 18 February 2016
Main Wiki | Midterm Wiki | Final Wiki |
Project Progress Summary
ContentsMidterm slides
Deployed Link: Project HighlightsOur project schedule is divided into 12 iterations.
Development ProgressStatus: 80%
Project Management
Project Scope
Major Scope changes
View our Change Management Here! Project ScheduleView detailed Project Schedule here!
Schedule Highlights
MetricsSchedule MetricsView our Schedule Metrics Here! Schedule Metrics Highlights
Bug MetricsBug ScoreBug Distribution based on Severity
Project RisksView our risk management here!
The above two risks has been mitigated.
Technical ComplexityPDF Text Recognition
Responsive Web Mobile Application
|
Stage | Specification | Modules |
---|---|---|
Project Requirements | Story boards | Story board |
Project Management | Minutes | Meeting Minutes |
Project Management | Metrics, Risks, Change |
Schedule Metrics |
Analysis and Design | Use Case, ER Diagram, As-Is, To-Be Processes, Sequence Diagrams | Use Case, ER Diagram, As-Is, To-Be Processes, Sequence Diagrams, Use Case Description |
Design | Prototype | Persona and Prototype |
Testing | User Test Plan |
Deployment
Deployed Link: http://hsemr-wpinapp.rhcloud.com/hsemr
Testing
We have conducted two user testing and one heuristic evaluation.
heuristic Evaluation
- Venue: Singapore Management University, School of Information Systems
- 5 participants
- This is to learn more about the usability of our application and improve it further in our future designs. This was conducted with a paper prototype. A paper prototype was used because we want to be able to discover UI issues early, so that the cost of changing will not be so high.
View our Heuristics Evaluation documentation here!
User Testing 1
- Date: 10 October 2014
- Venue: Ngee Ann Polytechnic, School of Health Sciences
- 1 Academic One Administrator
- 2 Cerealtech School Of Baking Technology Administrator
- 1 administrator from CSIS Industries Administrator
View our UT1 documentation here!
User Testing 2
- Date: 29 January 2015
- Venue: Sterling Engineering Training Hub
- 3 Sterling Engineering Training Hub Administrators
View our UT2 documentation here!
Reflections