Timeline

REALIS Overall Schedule.png
Presentation Slides
5 Nov 2014 Acceptance 25 Feb 2015 Mid-Term 21 Apr 2015 Final


Version Image Of Timeline Valid Until Changes Made For The Version
1 1 November 2014
  • Original version.
2 12 November 2014
  • Extended Iteration 1 until 12 November 2015. This was to take into account of the refinements made for the application after Acceptance.
3 31 January 2015
  • Modified Iteration 2 to Research Module because the team needed time to research on the new technologies used for the development of application such as types of Geospatial databases, charting libraries and map services.
  • Included a Research Module in Iteration 3. This is for Boyang to do more in-depth research for PostGIS database, after having researched on the various available Geospatial Databases and their designs.