Line 45: Line 45:
 
* LiveLabs servers overload (data increase 1GB/minute), seemed to have been caused by us
 
* LiveLabs servers overload (data increase 1GB/minute), seemed to have been caused by us
 
* API level of phone borrowed from school too low for our development
 
* API level of phone borrowed from school too low for our development
 +
 +
*Team members too busy with other work
 +
*List of requirement changes
 +
** CRUD items replaced with CU/Sync/Archive items
 +
** Business analytics replaced with iPad client
 +
*Took 8 weeks to learn Ruby on Rails
 +
*etc.
 +
Be brief.
  
 
==<div style="background: #6CACFF; padding: 15px; font-weight: bold; line-height: 0.3em; text-indent: 0px; font-size:20px; font-family:helvetica"><font color= #FFFFFF>Project Management</font></div>==
 
==<div style="background: #6CACFF; padding: 15px; font-weight: bold; line-height: 0.3em; text-indent: 0px; font-size:20px; font-family:helvetica"><font color= #FFFFFF>Project Management</font></div>==
Line 159: Line 167:
  
 
===Project Risks:===
 
===Project Risks:===
 
+
These are the top risks we have identified and has happened before Mid Term.  
Update the proposal assumptions and risks. Describe what you learn from the risk update and mitigation steps taken.  
+
We have followed the mitigation steps listed above and successfully managed the risks.  
 
+
[[File:vulcan_Risk_midterm.PNG]]
{| border="1"
 
|- style="background:blue; color:white"
 
|align="center" width="150px"| Risk
 
|align="center"| Probability
 
|align="center"| Impact
 
|align="center"| Mitigation
 
|-
 
 
 
|width="150px"| Sponsor want to use Joomla instead of Drupal
 
|| High
 
|| High
 
|| Team evaluating Joomla to write an impact analysis report
 
|-
 
 
 
|width="150px"| Sponsor deployment machine approval and support
 
|| High
 
|| Medium (now it is low)
 
|| Use UPL machine
 
|}
 
 
 
Be sure to prioritize the risks.
 
  
 
===Technical Complexity:===
 
===Technical Complexity:===

Revision as of 04:25, 7 October 2015

VulcanLogo.png
Vulcan home icon2.png
Vulcan aboutus icon2.png
Vulcan projectoverview icon2.png
Vulcan projectmanagement icon2.png
Vulcan documentation icon2.png

HOME ABOUT US PROJECT OVERVIEW PROJECT MANAGEMENT DOCUMENTATION


Project Progress Summary

Place your Midterm slides link and deployed site link here

For proposal, please see Requirements at the Project Deliverables. This will help us understand your scope. Note wiki policy here.

This page should NOT be too long. It should link to other pages in the IS480 team wiki. Do not repeat the proposal or other wiki information here. However, keep a snapshot of the midterm state. Highlight changes since project acceptance.

Describe the project progress briefly here. Have the project continued as planned? If not, is the team confident to complete? This is a crossroad for the team to make a decision. Proceed with confident or file an incomplete.

Highlights of Project:

What unexpected events occurred?

  • LiveLabs relocation of servers on Oct 5th 2015, two days before Midterms Presentation
  • LiveLabs servers overload (data increase 1GB/minute), seemed to have been caused by us
  • API level of phone borrowed from school too low for our development
  • Team members too busy with other work
  • List of requirement changes
    • CRUD items replaced with CU/Sync/Archive items
    • Business analytics replaced with iPad client
  • Took 8 weeks to learn Ruby on Rails
  • etc.

Be brief.

Project Management

Provide more details about the status, schedule and the scope of the project. Describe the complexity of the project.

Project Status:

MidTerm Progress.PNG

Vulcan Scope midterm.png


Highlight changes to modules, the completion status (implemented, user testing done, client approved, deployed, etc), the confidence level (0-1 where 0 is no confident of getting it done, 1 is 100% confident in getting it done) and comments (who has been assigned to do it, new scope, removed scoped, etc). Please use a table format to summarize with links to function details.

Task/function/features, etc Status Confident Level (0-1) Comment
Customer CRUD Fully deployed and tested 100% 1 Fiona
Trend Analytic 25% 0.9 Ben is researching analytic algoritms

Project Schedule (Plan Vs Actual):

Compare the project plan during acceptance with the actual work done at this point. Briefly describe a summary here. Everything went as plan, everything has changed and the team is working on a new project with new sponsors or the supervisor is missing. A good source for this section comes from the project weekly report.

Provide a comparison of the plan and actual schedule. Has the project scope expanded or reduced? You can use the table below or your own gantt charts.

Planned Schedule

Vulcan Schedule timeline acceptance.png

Actual Schedule

Vulcan Schedule timeline midterm.png

Detailed Planned VS Actual

Iterations Planned Actual Comments
1 Customer CRUD 1 Sept 2010 25 Aug 2010 Fiona took the Sales CRUD as well.
Trend Analytic 1 Sept 2010 15 Sept 2010 Ben is too busy and pushed iteration 1 back
2 User tutorial 1 Oct 2010 Removed proposed by Ben
Psycho analysis 1 Oct 2010 New module proposed by sponsor

Project Metrics:

Summary of analysis for the metrics collected. You may refer to another page for the details about the metrics and how it is collected.

Schedule Metric Formula: (Estimated Days / Actual Days) x 100%

Vulcan Schedule Metric Score.PNG
Iteration Planned Duration (Days) Actual Duration (Days) Schedule Metric Score Action Status
2 18 32 56.25% Team is behind schedule. This is due to the complexity of the tasks planned (Android App and Smart Watch).

Follow up action: Rescheduled the future iterations, deducted days from buffer days.

Completed
4 18 24 75% Team is behind schedule. This is due to Livelab's server permission issues.

Follow up action: Rescheduled the future iterations, deducted days from buffer days.

Completed

Project Risks:

These are the top risks we have identified and has happened before Mid Term. We have followed the mitigation steps listed above and successfully managed the risks. Vulcan Risk midterm.PNG

Technical Complexity:

Describe and list the technical complexity of your project in order of highest complexity first. For example, deploying on iPhone using Objective-C, customizing Drupal with own database, quick search for shortest flight path, database structure, etc.

Quality of product

Provide more details about the quality of your work. For example, you designed a flexible configurable system using XML.config files, uses Strategy Design Pattern to allow plugging in different strategy, implement a regular expression parser to map a flexible formula editor, etc.

Intermediate Deliverables:

There should be some evidence of work in progress.

Stage Specification Modules
Project Management Minutes (Sponsor,Supervisor, Team) Minutes
Metrics Schedule, Bug, Change Management Metrics
Requirements Gathering Design Documents Scenario,Storyboard,Navigation Diagram,Prototype
Market Research Market Research
Analysis Use case Participant & Researcher Use Cases
Business Process Diagram Business Process Diagram
Testing User Testing User Test
Test Plans Test Cases

Not all parts of the deliverables are necessary but the evidence should be convincing of the progress. Try to include design deliverables that shows the quality of your project.

Deployment:

In an iterative approach, ready to use system should be available (deployed) for client and instructions to access the system described here (user name). If necessary, provide a deployment diagram link.

Testing:

Number of User Tests: 3
Tester Profile:
Our testers consist of users with research backgrounds, specifically research assistants currently pursuing their PhD in Psychology. With their experience, we were able to gain valuable feedback with regards to the creation of studies.
For more information about the user tests and the detailed results, please visit the link below:
User Test

Test Cases:
For each iteration, we have functional test cases to test individual functions. Towards the end of the iteration, we will do regression testing and go through the entire flow of the project to ensure all parts are working.
For the detailed test cases, please visit the link below:
Test Cases

Vulcan bugmetric.PNG
Vulcan Bug Report 3.png


For our bug metrics score, we can see that iteration 5 had an exceptionally high score. This was due to the aftermath of User Test 2 and 3, which proved to be useful for us with the functional and UI bugs spotted. Even though the bug score was well above the threshold level of 10, we managed to solve all the bugs in the scheduled debugging time.
For the detailed bug reports, please visit the link below:
Bug Metrics


Reflection

In this section, describe what have the team learn? Be brief. Sometimes, the client writes a report to feedback on the system; this sponsor report can be included or linked from here.

Team Reflection:

Any training and lesson learn? What are the take-away so far? It would be very convincing if the knowledge is share at the wiki knowledge base and linked here.

Benjamin Gan Reflection:

You may include individual reflection if that make sense at this point. The team is uncooperative and did not follow my instructions.