Difference between revisions of "IS480 Team wiki: 2014T1 Team Pentagon FinalWiki"
Twmyint.2012 (talk | contribs) |
Twmyint.2012 (talk | contribs) |
||
Line 71: | Line 71: | ||
==X-Factor== | ==X-Factor== | ||
− | [[Image:pentagonxfactor.jpg| 700px]] | + | [[Image:pentagonxfactor.jpg| 700px | center]] |
===Other than X-Factor=== | ===Other than X-Factor=== | ||
− | [[Image:Differentiate.jpg| 700px]] | + | [[Image:Differentiate.jpg| 700px | center]] |
Revision as of 02:14, 2 December 2014
Home | About Us | Project Overview | Project Management | Project Documentation |
Acceptance Wiki | Mid Term Wiki | Final Wiki |
Check out our Final Presentation Slides! Download here: Team Pentagon Final Presentation Powerpoint Slides |
Check out our deployed system! Click here: [| Skillseed Mangement System (SMS)] |
Check out our Final Presentation Video! Click here: [ Team Pentagon Final Presentation Video] |
Contents
PROJECT OVERVIEW
Project Highlights
Project Challenges
Development Progress:
X-Factor
Other than X-Factor
PROJECT MANAGEMENT
Project Scope (Planned vs Actual)
Check detailed Change Log here: https://wiki.smu.edu.sg/is480/IS480_Team_wiki%3A_2014T1_Team_Pentagon_Project_Scope#Change_Log
Project Schedule (Actual)
Check detailed Change Log here: https://wiki.smu.edu.sg/is480/IS480_Team_wiki%3A_2014T1_Team_Pentagon_Project_Management
Project Schedule (Planned vs. Actual)
Metric Scores
Check all metric scores here: https://wiki.smu.edu.sg/is480/IS480_Team_wiki%3A_2014T1_Team_Pentagon_AllMS
TECHNICAL COMPLEXITY
System Architecture Diagram
Technical Architecture Diagram
Backend Architecture
Frontend Architecture
Quality
We have done 4 user testings on the following dates.
- User Testing #1: 5 August 2014
- User Testing #2: 22 September 2014
- User Testing #3: 20 October 2014
- User Testing #4: 16 November 2014
User Testing #1
We conducted our first user testing session with 13 participants (4 from Project Skillseed Team) on 5th August 2014.
- Physical User Testing: 5th August 2014
- Remote User Testing: 6th August to 13th August 2014
Check documentation and test analysis here: https://wiki.smu.edu.sg/is480/IS480_Team_wiki%3A_2014T1_Team_Pentagon_Test_Cases
User Testing #2
We conducted our second user testing session with 9 participants (4 from Project Skillseed Team) on 22nd September 2014.
- Physical User Testing: 22nd September 2014
- Remote User Testing (China & Singapore): 26th September to 30th September 2014
Check documentation and test analysis here: https://wiki.smu.edu.sg/is480/IS480_Team_wiki%3A_2014T1_Team_Pentagon_UT2
User Testing #3
We conducted our third user testing session with 10 participants (4 from Project Skillseed Team) on 20th October 2014 .
- Physical User Testing: 20th October 2014
Check documentation and test analysis here: https://wiki.smu.edu.sg/is480/IS480_Team_wiki%3A_2014T1_Team_Pentagon_UT3
User Testing #4
We conducted our second user testing session with 13 participants (8 from Project Skillseed Team) on 16th November 2014.
- Physical User Testing: 16th November 2014
Check documentation and test analysis here: https://wiki.smu.edu.sg/is480/IS480_Team_wiki%3A_2014T1_Team_Pentagon_UT4
REFLECTIONS
Team Pentagon
THANDAR "Stakeholder Mgmt is the most important factor in Project Management. Keeping everyone happy was not easy. But as a team, we did it! We learnt how to balance our effort towards FYP during the exam period. Task Allocations was tough as I have to entertain individual's schedule and availability. The project schedule was developed with care of these potential risks and situation. So, it does not bring any effect to our schedule or resources!
SITHU
"I learnt more about modern web development best practices and technologies especially on MEAN development workflow."
KAWI -
“Being able to understand how a social enterprise works and help them solve their problems is what’s worth the effort for the past few months in doing this FYP.I also learn how to handle bug reports more effectively”
PEI QIN -
“User requirements are not known directly at all times. Hence I have learnt to better appreciate how business and IT come along."
KEN -
“Playing a role of System Analyst, I learnt how to write test plans, test cases and evaluate actions based on test results. In addition, as deputy developer, I’m grateful to have more knowledge on both very powerful web applications language which are Angular.js and Node.js”