HeaderSIS.jpg

IS480 Team wiki: 2014T1 Team Epsilon User Testing

From IS480
Revision as of 19:15, 4 October 2014 by Joel.woo.2011 (talk | contribs)
Jump to navigation Jump to search

Team Epsilon Logo.png.png

Home   Project Overview   Project Management   Documentation   Team

Design Overview   Prototype   User Testing   Meeting Minutes   Submission Archive


Usability Testing 1

Planned Date: 29th August 2014

Actual Date: 28th August 2014 - 1st September 2014

UT1 was conducted over a period of five days as some participants were not free and we can only conduct UT1 based on their available schedule.

Purpose

The purpose of UT1 is to test the functionalities that are already coded out, and gather feedback on what the users think of the current user interface design.

User Demographics

Epsilon User Testing 1 Demographic.png

Scope

The functions tested out in UT 1 on iOS are:

  1. Registration
  2. Login
  3. Display All Feedback (Listing)
  4. Submit Feedback

Results

The following is the top five feedback and comments given by our users after using our system.


Epsilon User Testing 1 Chart.png


Follow-Up Actions

Based on the top feedback given, our team made changes to the system after discussing with our sponsor.

Epsilon User Testing Follow Up.png

Usability Testing 2

Date: 10th October 2014 (Tentatively Scheduled)

Proposed Date Change: 10th October 2014 - 17th October 2014 (to cater to participant's schedule)

Purpose

User Demographics

Scope

Results

Follow-Up Actions