Difference between revisions of "IS480 Team wiki: 2014T1 Team Epsilon User Testing"
Line 26: | Line 26: | ||
{|style="background-color:#FFFFFF; color:#000000 padding: 5px 0 0 0;" width="100%" cellspacing="0" cellpadding="0" valign="top" border="0" | | {|style="background-color:#FFFFFF; color:#000000 padding: 5px 0 0 0;" width="100%" cellspacing="0" cellpadding="0" valign="top" border="0" | | ||
| style="padding:0.4em; font-size:150%; background-color:#FFFFFF; border-bottom:4px solid #000000; border-top:4px solid #000000; text-align:center; color:#828282" width="10%" | [[IS480 Team wiki: 2014T1 Team Epsilon Documentation |<font color="#000000" size=2><b>Design Overview</b></font>]] | | style="padding:0.4em; font-size:150%; background-color:#FFFFFF; border-bottom:4px solid #000000; border-top:4px solid #000000; text-align:center; color:#828282" width="10%" | [[IS480 Team wiki: 2014T1 Team Epsilon Documentation |<font color="#000000" size=2><b>Design Overview</b></font>]] | ||
+ | |||
+ | | style="border-bottom:4px solid #000000; border-top:4px solid #000000; background:none;" width="1%" | | ||
+ | | style="padding:0.4em; font-size:150%; background-color:#FFFFFF; border-bottom:4px solid #000000; border-top:4px solid #000000; text-align:center; color:#828282" width="10%" | [[IS480 Team wiki: 2014T1 Team Epsilon Use Case |<font color="#000000" size=2><b>Use Case</b></font>]] | ||
| style="border-bottom:4px solid #000000; border-top:4px solid #000000; background:none;" width="1%" | | | style="border-bottom:4px solid #000000; border-top:4px solid #000000; background:none;" width="1%" | |
Revision as of 06:10, 7 October 2014
Home | Project Overview | Project Management | Documentation | Team |
Design Overview | Use Case | Prototype | User Testing | Meeting Minutes | Submission Archive |
Contents
Usability Testing 1
Planned Date: 29th August 2014
Actual Date: 28th August 2014 - 1st September 2014
UT1 was conducted over a period of five days as some participants were not free and we can only conduct UT1 based on their available schedule.
Purpose
The purpose of UT1 is to test the functionalities that are already coded out, and gather feedback on what the users think of the current user interface design.
User Demographics
For UT1, we managed to get a total of 10 users to help us with user testing.
We expect our system to be used by public users regardless of their age, so to that end, we tried to get users from every age group, as this will more accurately reflect the actual usage of the app.
The following is the breakdown of our UT1 user's age demographics:
Scope
The functions tested out in UT 1 on iOS are:
- Registration
- Login
- Display All Feedback (Listing)
- Submit Feedback
Results
The following is the top five feedback and comments given by our users after using our system.
Follow-Up Actions
Based on the top feedback given, our team made changes to the system after discussing with our sponsor.
Usability Testing 2
Date: 10th October 2014 (Tentatively Scheduled)
Proposed Date Change: 10th October 2014 - 17th October 2014 (to cater to participant's schedule)
The rationale for the proposed date change is that after User Testing 1, we realized that it is very hard to get every user to come together at a common timeslot for testing.
To cater to each of our user's schedule, we decided to conduct User Testing 2 through a time period of 7 days.