== Usability Testing 1 ==
 +
 +
<b>Planned Date:</b> 29th August 2014
 +
 +
<b>Actual Date:</b> 28th August 2014 - 1st September 2014
 +
 +
UT1 was conducted over a period of five days as some participants were not free and we can only conduct UT1 based on their available schedule.
 +
 +
=== Purpose ===
 +
 +
The purpose of UT1 is to test the functionalities that are already coded out, and gather feedback on what the users think of the current user interface design.
 +
 +
=== Scope ===
 +
 +
The functions tested out in UT 1 on iOS are:
 +
 +
#Registration
 +
#Login
 +
#Display All Feedback (Listing)
 +
#Submit Basic Feedback (excludes multiple images and annotation)
 +
#
 +
 +
=== Results ===
 +
 +
== Usability Testing 2 ==
 +
 +
Date: 10th October 2014 (Tentatively Scheduled)
 +
 +
Proposed Date Change: 10th October 2014 - 17th October 2014 (to cater to participant's schedule)
 +
 +
=== Purpose ===
 +
 +
=== Scope ===
 +
 +
=== Results ===

Revision as of 16:57, 27 September 2014

Team Epsilon Logo.png.png

Home   Project Overview   Project Management   Documentation   Team

Design Overview   Prototype   User Testing   Meeting Minutes   Submission Archive


Usability Testing 1

Planned Date: 29th August 2014

Actual Date: 28th August 2014 - 1st September 2014

UT1 was conducted over a period of five days as some participants were not free and we can only conduct UT1 based on their available schedule.

Purpose

The purpose of UT1 is to test the functionalities that are already coded out, and gather feedback on what the users think of the current user interface design.

Scope

The functions tested out in UT 1 on iOS are:

  1. Registration
  2. Login
  3. Display All Feedback (Listing)
  4. Submit Basic Feedback (excludes multiple images and annotation)

Results

Usability Testing 2

Date: 10th October 2014 (Tentatively Scheduled)

Proposed Date Change: 10th October 2014 - 17th October 2014 (to cater to participant's schedule)

Purpose

Scope

Results