HeaderSIS.jpg

Difference between revisions of "IS480 Team wiki: 2014T1 One Piece Project Midterm Wiki"

From IS480
Jump to navigation Jump to search
Line 476: Line 476:
  
 
|| Requirements
 
|| Requirements
 +
||  [[IS480 Team wiki: 2014T1 One Piece Project Prrototype|<b> Paper Prototype (Lo Fi) & Improved Prototype (Hi Fi) </b>]]
 
|| Prototype
 
|| Prototype
|| [[IS480 Team wiki: 2014T1 One Piece Project Prrototypee|<b> Paper Prototype (Lo Fi) & Improved Prototype (Hi Fi) </b>]]
 
 
|-
 
|-
  

Revision as of 12:01, 29 September 2014

OnePiece Banner.jpg

BPAcademy is to enable online training
for corporate employees and increase efficiency in organizations
by ensuring compulsive learning.


Back to Home Page

WORKING IN PROGRESS PAGE!

Project Progress Summary

Our project schedule is divided into 12 iterations.

  • Till date of 2 September 2014, we have completed ...... of our project
  • Five user testings have been conducted.
    • Two usability testings with school mates
    • One user validation testing with clients
    • One functionality testing with clients
    • One functionality A/B testing with school mates
  • Next Iteration - Iteration 8 (2 October - 30 October)



  • Midterm slides: [[Media:| Midterm Presentation Slides]]
  • Deployed site link:
  Notes: 


Project Highlights:

  • Team members are busy with other school commitments and events such as career recruitment talk, CCA responsibility and job applications.
  • Text Editor and Impressify JS technical complexity is more sophisticated than expected and take way longer.
  • Aniket's laptop died on 5 September. He bought a new one. (Iteration 6) Luckily, it did not seriously effect the project progress.
  • MiMi's laptop died before acceptance and bought a new one. Unfortunately, her new laptop stopped functioning on 23 September (Iteration 7).

It effects the development of super admin module.

  • List of major requirement changes (Suggested by client, supervisor and member)
    • Optional hint feature for quiz
    • Individual question weightage of the quiz
    • Timer feature disabled after 24 hrs of of first quiz attempt
    • Display and edit users/user groups without searching
    • Schedule publish/recall
    • Time stamp for quiz attempts

Project Management

Project Status:

Task/function/features, etc Status Confident Level(0-1) Comment UI Link (If Available)


|- |}

-->

Task/function/features, etc Status Confident Level(0-1) Comment UI Link (If Available)
User Authentication : Validate Access and direct to the respective platform Deployed and tested 100% 1 Chenguang and Ila
Upload/Replace slides and store in the database with Apache POI API Deployed and tested 100% 1 MiMi
Create/Modify module, slide details and access rights with validation. Deployed and tested 100% 1 Chenguang
Preview uploaded/Modified slides with Impressify Deployed and tested 100% 1 Ila
Publish/Recall modules to/from the trainee platform Deployed and tested 100% 1 Chenguang and Ila
Add/Edit additional slide content in Text Editor 60% 0.9 Ila
CRUD of take quiz with min Pass/Fail restriction Deployed and tested 100% 1 Mi Mi and Chenguang
View and delete created module and quizzes Deployed and tested 100% 1 Mi Mi and Phyu Phyu
Take Module feature by Trainee Deployed and tested 100% 1 Aniket Click Here
Assign question weightage in create and edit quiz Deployed and tested 100% 1
  • Phyu Phyu
  • New requirement by client
CRUD of timer feature with respective slides Deployed and tested 100% 1 Chenguang and Ila
View pending/completed modules and new quizzes Deployed and tested 100% 1 Aniket
Search feature by multiple parameter and sorting feature by columns for Trainee homepage Deployed and tested 100% 1 Aniket
Search feature by multiple parameter and sorting feature by columns for Trainee homepage Deployed and tested 100% 1
  • Aniket
  • Requested changes by client
CRUD of user groups and single user Deployed and tested 100% 1 Siddhant and Mi Mi
Upload .csv files to add multiple users and users group Completed 80% 1 Siddhant and Mi Mi
CRUD of timing feature (Learning Interactive Feature) Tested 100% 1 Ila
CRUD of checkpoint feature (Learning Interactive Feature) Tested 100% 1 Ila
Re take the quiz without going through the module after first quiz attempt for 24 hrs Haven't started yet. 1
  • Aniket or Ila
  • Suggestion by supervisor and client has approved for changes
Scheduled publish and recall of modules WIP 1
  • Chenguang
  • Suggestion by supervisor and client has approved for changes
Optional hint feature for quiz question feature in take quiz module WIP 1
  • Mi Mi and Aniket
  • Suggestion by supervisor and client has approved for changes
Hint feature for checkpoint both right and wrong choices WIP 1
  • Ila
  • New requirement by client
Optional and Mandatory names for create and edit of single users and user groups WIP 1
  • Siddhant and Mi Mi
  • Suggested by Aniket and client has approved for changes
Display and edit usergroups without searching in Super Admin Module WIP 1
  • Mi Mi and Phyu Phyu
  • New requirement by client
Transition path feature for text editor module 70% completed 1 Ila
CRUD of audio/video files 40% 1 Chenguang and Ila
Time stamp for multiple quiz attempt 1 Aniket
Scale/Rotate/Zoom/3D features for text editor modules Task after mid term 1 Ila
Text enhancing feature for text editor module Task after mid term 1 Ila
View trainee performance by different categories and combination Task after mid term 0.8 Chenguang and Aniket
Generate defaulted trainee overview report Task after mid term 1 Mi Mi

Project Schedule (Plan Vs Actual):

ActualVSplan OnePiece.jpg

Project Metrics:

Project Risks:

Technical Complexity:

Quality of product

Intermediate Deliverables:

There should be some evidence of work in progress.

Stage Specification Modules
Project Management Meeting Minutes Client, supervisor & team meetings
Metrics Schedule & bug metrics (Iteration 1 - 7)
Requirements Paper Prototype (Lo Fi) & Improved Prototype (Hi Fi) Prototype
Analysis Use case overall
System Sequence Diagram client, server
Business Process Diagram Here
Screen Shots CRUD Customer, Trend Analysis
Design ER Diagram 1, 2, 3
Class Diagram 1, 2, 3
Testing User Testings User test plan

Not all parts of the deliverables are necessary but the evidence should be convincing of the progress. Try to include design deliverables that shows the quality of your project.

Deployment:

Testing:

Reflection

Team Reflection:

Supervisor Reflection: