Difference between revisions of "IS480 Team wiki: 2014T1 One Piece Project Midterm Wiki"
Jump to navigation
Jump to search
Hphyu.2011 (talk | contribs) |
Hphyu.2011 (talk | contribs) |
||
Line 468: | Line 468: | ||
|rowspan="2"| Project Management | |rowspan="2"| Project Management | ||
|| [[IS480 Team wiki: 2014T1 One Piece Project Meeting Minutes|<b> Meeting Minutes </b>]] | || [[IS480 Team wiki: 2014T1 One Piece Project Meeting Minutes|<b> Meeting Minutes </b>]] | ||
− | || | + | || Client, supervisor & team meetings |
|- | |- | ||
|| Metrics | || Metrics | ||
− | || | + | || [[IS480 Team wiki: 2014T1 One Piece Project Metric Tracking|<b> Metrics </b>]] |
+ | || Schedule & bug metrics (Iteration 1 - 7) | ||
|- | |- | ||
|| Requirements | || Requirements | ||
|| Story cards | || Story cards | ||
− | || [ | + | || [[IS480 Team wiki: 2014T1 One Piece Project Prrototype#Paper Prototype|<b> User Testings </b>]] |
+ | |||
+ | <!-- https://wiki.smu.edu.sg/is480/IS480_Team_wiki%3A_2014T1_One_Piece_Project_Prototype#Paper_Prototype_.28Low_Fidelity.29 --> | ||
|- | |- | ||
Line 495: | Line 498: | ||
|| Screen Shots | || Screen Shots | ||
|| CRUD Customer, Trend Analysis | || CRUD Customer, Trend Analysis | ||
+ | https://wiki.smu.edu.sg/is480/IS480_Team_wiki%3A_2014T1_One_Piece_Project_Current_Product | ||
|- | |- | ||
Line 508: | Line 512: | ||
|| Testing | || Testing | ||
+ | || [[IS480 Team wiki: 2014T1 One Piece Project Testing|<b> User Testings </b>]] | ||
|| User test plan | || User test plan | ||
− | |||
|} | |} | ||
− | + | https://wiki.smu.edu.sg/is480/IS480_Team_wiki%3A_2014T1_One_Piece_Project_Testing | |
Not all parts of the deliverables are necessary but the evidence should be convincing of the progress. Try to include design deliverables that shows the quality of your project. | Not all parts of the deliverables are necessary but the evidence should be convincing of the progress. Try to include design deliverables that shows the quality of your project. | ||
Revision as of 11:47, 29 September 2014
BPAcademy is to enable online training
for corporate employees and increase efficiency in organizations
by ensuring compulsive learning.
Back to Home Page |
WORKING IN PROGRESS PAGE!
Project Progress Summary
Our project schedule is divided into 12 iterations.
- Till date of 2 September 2014, we have completed ...... of our project
- Five user testings have been conducted.
- Two usability testings with school mates
- One user validation testing with clients
- One functionality testing with clients
- One functionality A/B testing with school mates
- Next Iteration - Iteration 8 (2 October - 30 October)
- Midterm slides: [[Media:| Midterm Presentation Slides]]
- Deployed site link:
Notes:
Project Highlights:
- Team members are busy with other school commitments and events such as career recruitment talk, CCA responsibility and job applications.
- Text Editor and Impressify JS technical complexity is more sophisticated than expected and take way longer.
- Aniket's laptop died on 5 September. He bought a new one. (Iteration 6) Luckily, it did not seriously effect the project progress.
- MiMi's laptop died before acceptance and bought a new one. Unfortunately, her new laptop stopped functioning on 23 September (Iteration 7).
It effects the development of super admin module.
- List of major requirement changes (Suggested by client, supervisor and member)
- Optional hint feature for quiz
- Individual question weightage of the quiz
- Timer feature disabled after 24 hrs of of first quiz attempt
- Display and edit users/user groups without searching
- Schedule publish/recall
- Time stamp for quiz attempts
Project Management
Project Status:
Task/function/features, etc | Status | Confident Level(0-1) | Comment | UI Link (If Available) |
---|---|---|---|---|
|- |}
-->
Task/function/features, etc | Status | Confident Level(0-1) | Comment | UI Link (If Available) |
---|---|---|---|---|
User Authentication : Validate Access and direct to the respective platform | Deployed and tested 100% | 1 | Chenguang and Ila | |
Upload/Replace slides and store in the database with Apache POI API | Deployed and tested 100% | 1 | MiMi | |
Create/Modify module, slide details and access rights with validation. | Deployed and tested 100% | 1 | Chenguang | |
Preview uploaded/Modified slides with Impressify | Deployed and tested 100% | 1 | Ila | |
Publish/Recall modules to/from the trainee platform | Deployed and tested 100% | 1 | Chenguang and Ila | |
Add/Edit additional slide content in Text Editor | 60% | 0.9 | Ila | |
CRUD of take quiz with min Pass/Fail restriction | Deployed and tested 100% | 1 | Mi Mi and Chenguang | |
View and delete created module and quizzes | Deployed and tested 100% | 1 | Mi Mi and Phyu Phyu | |
Take Module feature by Trainee | Deployed and tested 100% | 1 | Aniket | Click Here |
Assign question weightage in create and edit quiz | Deployed and tested 100% | 1 |
|
|
CRUD of timer feature with respective slides | Deployed and tested 100% | 1 | Chenguang and Ila | |
View pending/completed modules and new quizzes | Deployed and tested 100% | 1 | Aniket | |
Search feature by multiple parameter and sorting feature by columns for Trainee homepage | Deployed and tested 100% | 1 | Aniket | |
Search feature by multiple parameter and sorting feature by columns for Trainee homepage | Deployed and tested 100% | 1 |
|
|
CRUD of user groups and single user | Deployed and tested 100% | 1 | Siddhant and Mi Mi | |
Upload .csv files to add multiple users and users group | Completed 80% | 1 | Siddhant and Mi Mi | |
CRUD of timing feature (Learning Interactive Feature) | Tested 100% | 1 | Ila | |
CRUD of checkpoint feature (Learning Interactive Feature) | Tested 100% | 1 | Ila | |
Re take the quiz without going through the module after first quiz attempt for 24 hrs | Haven't started yet. | 1 |
|
|
Scheduled publish and recall of modules | WIP | 1 |
|
|
Optional hint feature for quiz question feature in take quiz module | WIP | 1 |
|
|
Hint feature for checkpoint both right and wrong choices | WIP | 1 |
|
|
Optional and Mandatory names for create and edit of single users and user groups | WIP | 1 |
|
|
Display and edit usergroups without searching in Super Admin Module | WIP | 1 |
|
|
Transition path feature for text editor module | 70% completed | 1 | Ila | |
CRUD of audio/video files | 40% | 1 | Chenguang and Ila | |
Time stamp for multiple quiz attempt | 1 | Aniket | ||
Scale/Rotate/Zoom/3D features for text editor modules | Task after mid term | 1 | Ila | |
Text enhancing feature for text editor module | Task after mid term | 1 | Ila | |
View trainee performance by different categories and combination | Task after mid term | 0.8 | Chenguang and Aniket | |
Generate defaulted trainee overview report | Task after mid term | 1 | Mi Mi | |
Project Schedule (Plan Vs Actual):
Project Metrics:
Project Risks:
Technical Complexity:
Quality of product
Intermediate Deliverables:
There should be some evidence of work in progress.
Stage | Specification | Modules |
Project Management | Meeting Minutes | Client, supervisor & team meetings |
Metrics | Metrics | Schedule & bug metrics (Iteration 1 - 7) |
Requirements | Story cards | User Testings |
Analysis | Use case | overall |
System Sequence Diagram | client, server | |
Business Process Diagram | Here | |
Screen Shots | CRUD Customer, Trend Analysis
https://wiki.smu.edu.sg/is480/IS480_Team_wiki%3A_2014T1_One_Piece_Project_Current_Product | |
Design | ER Diagram | 1, 2, 3 |
Class Diagram | 1, 2, 3 | |
Testing | User Testings | User test plan |
https://wiki.smu.edu.sg/is480/IS480_Team_wiki%3A_2014T1_One_Piece_Project_Testing Not all parts of the deliverables are necessary but the evidence should be convincing of the progress. Try to include design deliverables that shows the quality of your project.