===Project Schedule (Plan Vs Actual):===
 
===Project Schedule (Plan Vs Actual):===
[[File:PlanVsActual OnePieceV2.jpg|1000px]]  
+
[[File:ActualvsPlanned_OnePiece.jpg|1000px]]  
 
<!-- Compare the project plan during acceptance with the actual work done at this point. Briefly describe a summary here. Everything went as plan, everything has changed and the team is working on a new project with new sponsors or the supervisor is missing. A good source for this section comes from the project weekly report.
 
<!-- Compare the project plan during acceptance with the actual work done at this point. Briefly describe a summary here. Everything went as plan, everything has changed and the team is working on a new project with new sponsors or the supervisor is missing. A good source for this section comes from the project weekly report.
  

Revision as of 01:27, 5 October 2014

OnePiece Banner.jpg

BPAcademy is to enable online training
for corporate employees and increase efficiency in organizations
by ensuring compulsive learning.


Back to Home Page

WORKING IN PROGRESS PAGE!

Project Progress Summary

Our project schedule is divided into 12 iterations.

  • Till date of 2 September 2014, we have completed 73% (19 out of 26 tasks) of our project.
  • Five user testings have been conducted.
    • Two usability testings with school mates (during IDP)
    • One user validation testing with clients (before acceptance)
    • One functionality testing with clients (after acceptance)
    • One functionality A/B testing with school mates (after acceptance)
  • Current Iteration - Iteration 8
  • Midterm slides: [[Media:|Midterm Presentation Slides]]
  • Deployed site link:

Project Highlights:

  • Team members are busy with other school commitments and events such as career recruitment talk, CCA responsibility and job applications.
  • Text Editor and Impressify JS technical complexity is more sophisticated than expected and take way longer.
  • Two members laptop broke down one after another in the same iteration. It effected our project progress and caused delay.
  • Postpone UAT with SMU students due to unexpected database issue.

Project Management

Project Status:

Primary

Task/function/features, etc Status Confident Level(0-1) Comment UI Link (If Available)
Validate Access and direct to the respective platform Deployed and tested 100% 1 Chenguang & Ila
Upload slides with Apache POI and store in the database Deployed and tested 100% 1 MiMi
Create/Modify module details and access rights with validation. Deployed and tested 100% 1 Aniket & Chenguang
Preview uploaded/Modified slides with Impressify Deployed and tested 100% 1 Ila
Publish/Recall modules to/from the trainee platform Deployed and tested 100% 1 Chenguang & Ila
CRUD of timer feature with respective slides Deployed and tested 100% 1 Chenguang & Ila
CRUD of checkpoint feature (Learning Interactive Feature) Tested 100% 1 Chenguang & Ila
View and delete created module/quizzes Deployed and tested 100% 1 Mi Mi & Phyu Phyu
Search feature by multiple parameter and sorting feature by columns for Trainer homepage Implemented and tested 100% 1
  • Aniket
  • Requested changes by client
CRUD of take quiz with min Pass/Fail restriction Deployed and tested 100% 1 Mi Mi and Chenguang
Assign question weightage in create and edit quiz Deployed and tested 100% 1
  • Phyu Phyu
  • New requirement by client
View pending/completed modules and new quizzes Deployed and tested 100% 1 Aniket
Search feature by multiple parameter and sorting feature by columns for Trainee homepage Deployed and tested 100% 1 Aniket
Take Module feature by Trainee Deployed and tested 100% 1 Aniket Click Here
Take/Retake quizzes online and review performance status Deployed and tested 100% 1 Aniket

Secondary

Task/function/features, etc Status Confident Level(0-1) Comment UI Link (If Available)
CRUD of user groups and single user Deployed and tested 100% 1 Siddhant & Mi Mi
Upload .csv files to add multiple users and users group Deployed and tested 100% 1 Siddhant & Mi Mi
Optional and Mandatory names for editing of single users Implemented and tested 100% 1
  • Siddhant & Mi Mi
  • Suggested by Aniket and client has approved for changes
Display and edit usergroups without searching in Super Admin Module Implemented and tested 100% 1
  • Mi Mi & Phyu Phyu
  • New requirement by client
Scale/Rotate/Zoom/3D features for text editor modules Task after mid term 1 Ila
Transition path feature for text editor module 60% 1 Ila
Text enhancing features Task after mid term 1 Ila
CRUD of audio/video files 40% 1 Chenguang
View trainee performance statistic by different categories and combination Task after mid term 1 Aniket

Additional

Task/function/features, etc Status Confident Level(0-1) Comment UI Link (If Available)
Generate defaulted trainee overview report Task after mid term 1 MiMi

Project Schedule (Plan Vs Actual):

ActualvsPlanned OnePiece.jpg

  • Change 1

Unfortunately, two of our team member's laptops broke down one after another at the start and middle of iteration 6 which is school week 3 and 4. One member took 3 days and another member took 2 days to get back a working laptop. We decided to expand the iteration duration by 3 days instead of reallocating the task with different resources since two incidents occur one after another consecutively. Hence next iteration (iteration 7) will start on 18 Sep instead of 15 Sep.


  • Change 2

Developers found out that the inefficiency of the way we utilize Hibernate framework is causing major bugs in integration stage. Besides, there are conflicted and overwritten files when committing to GitHub is delayed the integration process as well. Since we did not want to effect preparation time for UATs with client and SMU students and midterm, we decided to postpone UAT with SMU students from 26 Sep to 2 Oct and expanded this iteration duration by 4 days. Iteration 7 will be ended on 5 Oct instead of 1 Oct. We aim to catch up with the delay in week 8 (recess) week after mid term presentation.

Project Metrics:

View more details about our metrics description here !

Schedule Management

ScehduleMetric OnePiece Midterm.jpg

Iteration 6 This iteration is delayed by 3 days due to two members' laptop breakdown one after another.

Iteration 7 This iteration is delayed by 4 days.
Reason
1. Careless mistake of commit files to GitHub.
Action: We had a urgent group meeting to find out the main cause and have clearer standard procedure of using GitHub.
2. Inefficiency of the way we utilize Hibernate framework causes issues in integration.
Action: Research the way to resolve the cause and reallocate time to improve.

Bug Management

BugMetric OnePiece Midterm.jpg
BugMetric2 OnePiece.jpg

Iteration 7

  • After UATs with SMU students and BP, we have found out a few major bugs (medium severity) as well as many usability issue bugs. Hence, iteration 7 bug metric score is the highest among all.
  • The team is allocating more time during the expanded days of iteration 7 to debug and improve the UIs before proceeding with the new functionality.

Project Risks:

Current Risk

ActivatedRisk OnePiece.jpg

Mitigated Risk

MitigatedRisk OnePiece.jpg

Technical Complexity:

Quality of product

Intermediate Deliverables:

Stage Specification Modules
Project Management Meeting Minutes Client, supervisor & team meetings
Metrics Schedule & bug metrics (Iteration 1-7)
Requirements Paper Prototype (Lo Fi) & Improved Prototype (Hi Fi) Prototype
Diagrams Diagram

Architecture Design Use Case
Event Flow
ER Diagram

Project Resources Resources Tools & Resources
Current UI Screenshots UI Screenshots
UATs User Testings Testing

Not all parts of the deliverables are necessary but the evidence should be convincing of the progress. Try to include design deliverables that shows the quality of your project.

Deployment:

Web Application Apache Tomcat
Database MySQL
Server OpenShift
Deployed Link Coming Soon...
  • Window username needs to be added to the database to access our deployed version.

Testing:

Please view details of our user acceptance tests here!

UAT OnePiece.jpg

Reflection

Team Reflection:

Reflection1 OnePiece.jpg
Reflection2 OnePiece.jpg