HeaderSIS.jpg

Difference between revisions of "IS480 Team wiki: 2013T2 DR.Jean Labs The Team Final Wiki"

From IS480
Jump to navigation Jump to search
 
(32 intermediate revisions by 2 users not shown)
Line 49: Line 49:
 
<br>
 
<br>
 
<br />
 
<br />
 
+
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
 +
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -  - - - - - - - -  - - - - - - -
 
<!--Sub Sub-Navigation-->
 
<!--Sub Sub-Navigation-->
 
{| style="background-color:white; color:white padding: 5px 0 0 0;" width="100%" height=50px cellspacing="0" cellpadding="0" valign="top" border="0" |
 
{| style="background-color:white; color:white padding: 5px 0 0 0;" width="100%" height=50px cellspacing="0" cellpadding="0" valign="top" border="0" |
Line 70: Line 71:
 
==<div style="background: #000; padding: 15px; font-weight: bold; line-height: 0.3em; text-indent: 15px; text-transform:lowercase;letter-spacing:-0.1em;font-size:24px"><font color=#176596>Project </font><font color= #FFF>Summary</font></div>==
 
==<div style="background: #000; padding: 15px; font-weight: bold; line-height: 0.3em; text-indent: 15px; text-transform:lowercase;letter-spacing:-0.1em;font-size:24px"><font color=#176596>Project </font><font color= #FFF>Summary</font></div>==
  
[[Image:Dr.JeanLabs Final StoryBoard.png|center|900px ]]  
+
[[Image:Dr.JeanLabs Final StoryBoard.png|center|900px ]] <br />
 +
 
  
Place your Final slides link and deployed site link here
+
[[Image:Photo 2014-04-23 10-01-27 edited.jpg|center|900px]]
  
For proposal, please see Requrements at the Project Deliverables. This will help us understand your scope. Note wiki policy [[Help:Contents|here]].
+
=== Closed Beta Launch ===
 +
Beta Launch released date: 20 Feb 2014, 1pm <br />
 +
Beta released app link <b>(User)</b>: http://app.sqkii.com/ <br />
 +
Beta released app link <b>(Advertiser</b>): http://app.sqkii.com/adv <br />
  
This page should NOT be too long. It should link to other pages in the IS480 team wiki. Do not repeat the proposal, midterm or other wiki information here. Highlight changes since [[IS480_Midterm_Wiki | midterm]].
+
Beta released app test link <b>(User)</b>: http://test.sqkii.com/ <br />
 +
Beta released app test link <b>(Advertiser</b>): http://test.sqkii.com/adv <br />
  
Describe the project progress briefly here. Is the project completed? Link to the final presentation slides and videos.
+
<!--
 +
<gallery caption="Pictures for testing" widths="250px" heights="180px">
 +
Image:Dr.JeanLabs_Picture1Demo.png|Picture 1
 +
Image:Dr.JeanLabs_Picture2Demo.png|Picture 2
 +
Image:Dr.JeanLabs_Picture3Demo.jpg|Picture 3
 +
</gallery>
  
===Project Highlights:===
+
{| class="wikitable"
  
What unexpected events occurred and how were they handled?
+
|-
*A team member left the project and dropped the course
+
|colspan = "2" align = "center"|Advertiser test account
*List of requirement changes
+
<b>http://test.sqkii.com/adv</b>
** CRUD items replaced with CU/Sync/Archive items
+
 
** Business analytics replaced with iPad client
+
|-
*Took 8 weeks to learn Ruby on Rails
+
! style="background: #176596; color: white; text-align: center"; colspan= "1"; font-weight: bold| Username
*etc.  
+
! style="background: #176596; color: white; text-align: center"; colspan= "1"; font-weight: bold| Password
Be brief. A couple of sentences on the event and another couple on what was done is sufficient. Do not repeat the next sub sections. If there are no highlights, remove this section
+
 
 +
|-
 +
|benjamin@gmail.com
 +
|adv123
 +
 
 +
|-
 +
|alan@gmail.com
 +
|adv123
 +
 
 +
|}
 +
 
 +
{| class="wikitable"
 +
 
 +
|-
 +
|colspan = "2" align = "center"|User test account
 +
<b>http://test.sqkii.com/</b>
 +
 
 +
|-
 +
! style="background: #176596; color: white; text-align: center"; colspan= "1"; font-weight: bold| Username
 +
! style="background: #176596; color: white; text-align: center"; colspan= "1"; font-weight: bold| Password
 +
 
 +
|-
 +
|benjamin@gmail.com
 +
|ben123
 +
 
 +
|-
 +
|alan@gmail.com
 +
|allan123
 +
 
 +
|}
 +
-->
 +
Download our Final presentation slides [[Media:Dr.JeanLabs FinalPresentation.pdf|here]]
 +
 
 +
=== Project Highlights ===
 +
 
 +
View our past highlights in our [[IS480_Team_wiki:_2013T2 DR.Jean Labs_The Team_MidTerm Wiki| MidTerm Wiki.]]
 +
 
 +
{| border="1"
 +
 
 +
|- style="background:black; color:white"
 +
|colspan="4" align="center" |Project Management
 +
|-
 +
 
 +
|- style="background:black; color:white"
 +
| align="center"| S/N
 +
| align="center"| Change Event
 +
| align="center"| Affected Sprint
 +
| align="center"| Change Action Description
 +
|-
 +
 
 +
|| 1
 +
|| Remove the functions under "Receive Incentives" such as (Multiper Effect and Rating)
 +
|| 8
 +
|| Removed the Multiper effect and the Rating functions. We decided not to do the rating function as it will not provide any value added benefits to advertiser and user. User can use favourite function instead to see squibs again.
 +
 
 +
Team proposed this change not to biz team not to complicate things within the scope of this FYP.
 +
|-
 +
 
 +
|| 2
 +
|| Drop UT3 "Change of registering steps"
 +
|| 8
 +
|| As we discussed and realised that only a majority of the user that we have tested have faced the registration issue, we decided to enhance the login side by having FB login for user.
 +
|-
 +
 
 +
|| 3
 +
|| Drop create new account
 +
|| 8
 +
|| There are no separate administration account for sqkii.The biz requirement is to focus on exclusivity. Therefore it requires only the users in the platform to allow to refer friends to join.
 +
|-
 +
 
 +
|| 4
 +
|| Cashout Tier 3
 +
|| 9
 +
|| Team proposed to drop this function as this is only the beta launch of Sqkii. Have discussed with the Business Team.
 +
|-
 +
 
 +
|}
 +
 
 +
 
 +
{| border="1"
 +
|- style="background:black; color:white"
 +
|colspan="4" align="center" |Technical
 +
|-
 +
 
 +
|- style="background:black; color:white"
 +
| align="center"| S/N
 +
| align="center"| Change Event
 +
| align="center"| Changed Date / Sprint
 +
| align="center"| Change Action Description
 +
|-
 +
 
 +
|| 1
 +
|| Drop UT3 change, "Add arrow/movement of squib to show people "swiping" works"
 +
|| 28-Mar-14 / 9
 +
||
 +
Team will implement lazy load for all the squibs.
 +
|-
 +
 
 +
|| 2
 +
|| Drop squib rank for advertiser
 +
|| 28-Mar-14 / 9
 +
||
 +
Team proposed to drop this function as this is only the beta launch of Sqkii and schedule is behind time.
 +
|-
 +
 
 +
|| 3
 +
|| Drop enhanced contact form
 +
|| 31-Mar-14 / 9
 +
||
 +
Team proposed to drop because we will be seeing all feedbacks from users despite being categorized into different sections.
 +
|-
 +
 
 +
|| 4
 +
|| Drop enhanced menu bar for User
 +
|| 12-Apr-14 / 9
 +
||
 +
Team proposed to drop because we will be seeing all feedbacks from users despite being categorized into different sections.
 +
|-
 +
 
 +
|}
 +
 
 +
 
 +
{| border="1"
 +
|- style="background:black; color:white"
 +
|colspan="4" align="center" |Business Requirement
 +
|-
 +
 
 +
|- style="background:black; color:white"
 +
| align="center"| S/N
 +
| align="center"| Change Event
 +
| align="center"| Changed Date / Sprint
 +
| align="center"| Change Action Description
 +
|-
 +
 
 +
|| 1
 +
|| Added the Cash out Tier 3 for user
 +
|| 8
 +
|| As one of the main core focus of the project, it is to able to allow user to cash out the cash and donate to a chartiable clause.
 +
|-
 +
 
 +
|| 2
 +
|| Drop create new squib (admin)
 +
|| 8
 +
|| Due to the marketing strategy of the CBL, admin no longer need to create squibs for advertiser. Function is done but is not shown on the application.  
 +
|-
 +
 
 +
|}
  
 
===Project Challenges:===
 
===Project Challenges:===
  
 
Describe areas of the project that were particularly difficult and how they were dealt with, whether successfully or not. Again, a few sentences are enough. If there are no challenges, remove this section.
 
Describe areas of the project that were particularly difficult and how they were dealt with, whether successfully or not. Again, a few sentences are enough. If there are no challenges, remove this section.
 +
 +
{| border="1"
 +
 +
|- style="background:black; color:white"
 +
| align="center"| S/N
 +
| align="center"| Challenge
 +
| align="center"| Consequences
 +
| align="center"| What did we do to make it better?
 +
|-
 +
 +
|| 1
 +
|| Feedbacks coming in from our beta users.
 +
||
 +
* Caused delays in our planned schedule
 +
* Lost some beta users.
 +
* Team have to do sufficient UT to ensure that the application is usable for the user.
 +
||
 +
* Re-iterate the schedule again to ensure that the changes that we made is still able to keep the schedule in time.
 +
* Implemented Change Management to ensure that only justifiable feedback which falls under the appropriate level we will provide after discussing with the Business Unit.
 +
* Conducted several UT with both Users and Advertisers to ensure the application is usable.
 +
|-
 +
 +
|| 2
 +
|| Inefficient mode of communication
 +
||
 +
* Caused mis-communication between members and lack of understanding with each other.
 +
* Delay in Project Schedule.
 +
* Members are unhappy with one another.
 +
||
 +
* Tried out various communication means such as Facebook Chat, Whatsapp, Email, SMS, calling and Face-To-Face. In the end, we conclude that Facebook Chat is the most appropriate as most of them will be on laptop and easier for them to check and reply on Facebook Chat. At the same time, Function check list google docs are also in place to share with the coders to constantly keep track of the bugs that Business Unit has found online.
 +
* Happiness Metric in place to check the three areas of each member's well-being that includes (Happiness, Health & Motivation). The team will do something according to different threshold of the area if it hits below low. Sample of what we did can be found here.
 +
 +
View our past highlights in our [[IS480_Team_wiki:_2013T2 DR.Jean_Labs_Team_Lab_Photos#fun_things| Fun things that we do!]]
 +
|-
 +
|}
  
 
===Project Achievements:===
 
===Project Achievements:===
  
Methods, technologies, processes, teamwork, etc. which were particularly successful – highlight things which worked very well towards completing the project. A bulleted list of one to two sentences each will do. If there are no achievement, remove this section.
+
* 1300 registered users, 39 advertisers and 102 highly interested to join us.
 +
* 497 number of squibs online for viewing
 +
* Paid 102 users and 8 more pending to be paid.
 +
* Featured on [http://vulcanpost.com/5685/since-you-are-already-seeing-ads-sqkii-wants-to-pay-you-hard-cold-cash-for-it/ Vulcan] & [https://sg.news.yahoo.com/since-already-seeing-ads-skqii-023029660.html Yahoo].
 +
* Granted iJAM ($250,000) & AES ($10,000).
 +
* Conducted 4 User Test and one A|B testing experiment.

Latest revision as of 10:06, 23 April 2014

Agurz avatar.png
Denise avatar.png
Eleazar avatar.png
Dr.jeanlabs logo.jpg
Janan avatar.png
Nicholas avatar.png
Rafael avatar.png

HOME

 

DR.JEAN LABS

 

PROJECT OVERVIEW

 

PROJECT MANAGEMENT

 

PROJECT DOCUMENTATION

 


{ In a nutshell } { Acceptance Wiki } { MidTerm Wiki } { Final Wiki }



- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

<< Project Summary >> << Project Management >> << Quality of the Product >> << Our Reflections >>

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -


Project Summary

Dr.JeanLabs Final StoryBoard.png



Photo 2014-04-23 10-01-27 edited.jpg

Closed Beta Launch

Beta Launch released date: 20 Feb 2014, 1pm
Beta released app link (User): http://app.sqkii.com/
Beta released app link (Advertiser): http://app.sqkii.com/adv

Beta released app test link (User): http://test.sqkii.com/
Beta released app test link (Advertiser): http://test.sqkii.com/adv

Download our Final presentation slides here

Project Highlights

View our past highlights in our MidTerm Wiki.

Project Management
S/N Change Event Affected Sprint Change Action Description
1 Remove the functions under "Receive Incentives" such as (Multiper Effect and Rating) 8 Removed the Multiper effect and the Rating functions. We decided not to do the rating function as it will not provide any value added benefits to advertiser and user. User can use favourite function instead to see squibs again.

Team proposed this change not to biz team not to complicate things within the scope of this FYP.

2 Drop UT3 "Change of registering steps" 8 As we discussed and realised that only a majority of the user that we have tested have faced the registration issue, we decided to enhance the login side by having FB login for user.
3 Drop create new account 8 There are no separate administration account for sqkii.The biz requirement is to focus on exclusivity. Therefore it requires only the users in the platform to allow to refer friends to join.
4 Cashout Tier 3 9 Team proposed to drop this function as this is only the beta launch of Sqkii. Have discussed with the Business Team.


Technical
S/N Change Event Changed Date / Sprint Change Action Description
1 Drop UT3 change, "Add arrow/movement of squib to show people "swiping" works" 28-Mar-14 / 9

Team will implement lazy load for all the squibs.

2 Drop squib rank for advertiser 28-Mar-14 / 9

Team proposed to drop this function as this is only the beta launch of Sqkii and schedule is behind time.

3 Drop enhanced contact form 31-Mar-14 / 9

Team proposed to drop because we will be seeing all feedbacks from users despite being categorized into different sections.

4 Drop enhanced menu bar for User 12-Apr-14 / 9

Team proposed to drop because we will be seeing all feedbacks from users despite being categorized into different sections.


Business Requirement
S/N Change Event Changed Date / Sprint Change Action Description
1 Added the Cash out Tier 3 for user 8 As one of the main core focus of the project, it is to able to allow user to cash out the cash and donate to a chartiable clause.
2 Drop create new squib (admin) 8 Due to the marketing strategy of the CBL, admin no longer need to create squibs for advertiser. Function is done but is not shown on the application.

Project Challenges:

Describe areas of the project that were particularly difficult and how they were dealt with, whether successfully or not. Again, a few sentences are enough. If there are no challenges, remove this section.

S/N Challenge Consequences What did we do to make it better?
1 Feedbacks coming in from our beta users.
  • Caused delays in our planned schedule
  • Lost some beta users.
  • Team have to do sufficient UT to ensure that the application is usable for the user.
  • Re-iterate the schedule again to ensure that the changes that we made is still able to keep the schedule in time.
  • Implemented Change Management to ensure that only justifiable feedback which falls under the appropriate level we will provide after discussing with the Business Unit.
  • Conducted several UT with both Users and Advertisers to ensure the application is usable.
2 Inefficient mode of communication
  • Caused mis-communication between members and lack of understanding with each other.
  • Delay in Project Schedule.
  • Members are unhappy with one another.
  • Tried out various communication means such as Facebook Chat, Whatsapp, Email, SMS, calling and Face-To-Face. In the end, we conclude that Facebook Chat is the most appropriate as most of them will be on laptop and easier for them to check and reply on Facebook Chat. At the same time, Function check list google docs are also in place to share with the coders to constantly keep track of the bugs that Business Unit has found online.
  • Happiness Metric in place to check the three areas of each member's well-being that includes (Happiness, Health & Motivation). The team will do something according to different threshold of the area if it hits below low. Sample of what we did can be found here.

View our past highlights in our Fun things that we do!

Project Achievements:

  • 1300 registered users, 39 advertisers and 102 highly interested to join us.
  • 497 number of squibs online for viewing
  • Paid 102 users and 8 more pending to be paid.
  • Featured on Vulcan & Yahoo.
  • Granted iJAM ($250,000) & AES ($10,000).
  • Conducted 4 User Test and one A|B testing experiment.