Difference between revisions of "IS480 Team wiki: 2013T1 ThunderBolt Final wiki"
Line 164: | Line 164: | ||
====Internal Testing==== | ====Internal Testing==== | ||
Internal Testing was conducted at end of each iteration. Total of 12 internal testings were carried out. <br> | Internal Testing was conducted at end of each iteration. Total of 12 internal testings were carried out. <br> | ||
− | Click here for internal testing test plan:[https://www.dropbox.com/s/7o3heujyzj23na2/test_plan.docx]<br> | + | '''Click here for internal testing test plan:[https://www.dropbox.com/s/7o3heujyzj23na2/test_plan.docx]<br> |
Click here for internal testing test cases by iterations:[https://www.dropbox.com/s/f6prulqjh3n3f6p/Test%20cases%20and%20results.xlsx]<br> | Click here for internal testing test cases by iterations:[https://www.dropbox.com/s/f6prulqjh3n3f6p/Test%20cases%20and%20results.xlsx]<br> | ||
+ | ''' | ||
====User Testing==== | ====User Testing==== |
Revision as of 00:36, 25 November 2013
Mid-Term Wiki | Final Wiki |
Project Progress Summary
Immediate Deliverable
Click here [1] download final presentation slides
Link to deployment server: http://bit.ly/is480-ss
Link to live server : http://202.161.45.168/is480-scheduling/login.jsp
Our Key Accomplishments
- 99% of the project completed |
Project timeline overview
Click [2] to view our full project schedule.
Project Highlights
Video Pitch
Click here to watch the video!
Project Poster
Project Management
Provide more details about the status, schedule and the scope of the project. Describe the complexity of the project.
Project Status
Team has all completed core, secondary and additional functionality.
Click here to see more detail of our project status.
However, there are still some improvements that we would like to make after our final presentations:
- To allow admin/course coordinator to change presentation type from manage user function UI
- URL attached in the email to be configurable from UI
- Prepare handover documents (including tutorial videos)
Project Schedule (Plan Vs Actual)
Click here to see plan vs actual schedule
Project Metrics
Schedule Metrics
The chart below shows the overview of schedule metrics for our entire project
Click here to understand how we derive our metrics and what are the action plans to each metric.
Bug Metrics
Click here to find out how we calculate our bug score and what are the respective action plans for different category of score.
Click here for detailed bug log: [3]
Figure 1 shows the distribution of bug severity
Figure 2 further elaborate figure 1 by breaking down bug severity distribution over iteration
Figure 3 shows an overall bug score for our system as of now
Bugs logged here were discovered during internal testing which carried out at end of each iteration based on the test cases we created.Regression testing methodology was used to conduct internal testing.
Technical Complexity
Describe and list the technical complexity of your project in order of highest complexity first. For example, deploying on iPhone using Objective-C, customizing Drupal with own database, quick search for shortest flight path, database structure, etc.
Quality of product
Intermediate Deliverables
Stage | Specification | Links |
---|---|---|
Project Management | Metrics | |
Minutes | ||
Requirements | Change Requests Log | |
Prototype | ||
Analysis | Use Case | |
Design | System Architecture Diagram | |
Testing | Internal Testing Test Plan | |
Internal Testing Test cases and results | ||
User Testing 1 | ||
User Testing 2 | ||
User Testing 3 |
Deployment
System was first deployed on 26 Sept, followed by second deployment on 22 Oct and final deployment with full functionality on 21 Nov 2013
Testing
Internal Testing
Internal Testing was conducted at end of each iteration. Total of 12 internal testings were carried out.
Click here for internal testing test plan:[7]
Click here for internal testing test cases by iterations:[8]
User Testing
Reflection
In this section, describe what have the team learn? Be brief. Sometimes, the client writes a report to feedback on the system; this sponsor report can be included or linked from here.
Team Reflection
Any training and lesson learn? What are the take-away so far? It would be very convincing if the knowledge is share at the wiki knowledge base and linked here.